Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance | L1 | Accepted-Finance Less Quoted | |
| 2 | L2₹2.0 L+₹4,390.90 (2.28%)Accepted-Finance | L2 | Accepted-Finance Above Quoted |
| Sl No | Description | Qty | Unit | T.V.LOGANATHAN L2 | D.KOTHANDARAMAN L1 |
|---|---|---|---|---|---|
| 1.00Name of the Work : Construction of Compound wall to PUPS at Avalur Panchayat Under AGAMT II / 2023-24 Estimate Amount : 2.00 Lakhs | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B | 8.94 | cum | 230 ₹2,056.2 | 220 ₹1,966.8 Lowest |
| 3.00 | Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. incl all charges .complete. (75.31.2) | 1.24 | cum | 4,775 ₹5,921 | 4,765 ₹5,908.6 Lowest |
| 4.00 | Rein forced Cement concrete 11.5:3 mix using 20mm HBG metal for foundation and basement etc. complete.(75.40.10) | 3.24 | cum | 8,548 ₹27,695.52 | 8,538 ₹27,663.12 Lowest |
| 5.00 | Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete. | 21.84 | sqm | 486.5 ₹10,625.16 | 476.5 ₹10,406.76 Lowest |
| 6.00 | Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position | 200 | kg | 99 ₹19,800 | 89 ₹17,800 Lowest |
| 7.00 | B.W in cm 1:5 Mix using new Country bricks incl all cost and Conveyence incl All charges ( 75.31.10 ) | 5.73 | cum | 5,780 ₹33,119.4 | 5,770 ₹33,062.1 Lowest |
| 8.00 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.(75.31.22) | 65.06 | sqm | 257.5 ₹16,752.95 | 247.5 ₹16,102.35 Lowest |
| 9.00 | Color washing Two coat with approved Emulsion Paint in all floors using best quality and approved varity of colour pigments including cost of all materials brushes and scaffolding charges etc. complete.as per std specifications | 65.06 | sqm | 241.68 ₹15,723.7 | 231.68 ₹15,073.1 Lowest |
| 10.00 | Supply and fixing of steel grill gate | 63.44 | each | 35,010 ₹35,010 | 35,000 ₹35,000 Lowest |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
8 Dec 2023, 3:00 pmClosed
Block Development Officer(VP) Kancheepuram
Block Development Office Kancheepuram
Construction of Compound wall to PUPS at Avalur Panchayat Est. Amt Rs.2.00 Lakhs Under AGAMT II / 2023-24
2023_RDTN_395416_1
RC No.3133/2023/A10 Dt.15.11.2023
Open Tender
Civil Works - Water Works
Lump-sum
90 days
Kancheepuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,000
2 Dec 2025
2 Dec 2023
8 Dec 2023
2 Dec 2023
8 Dec 2023
2 Dec 2023
Amount
Name of the Work : Construction of Compound wall to PUPS at Avalur Panchayat Under AGAMT II / 2023-24 Estimate Amount : 2.00 Lakhs
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. incl all charges .complete. (75.31.2)
Rein forced Cement concrete 11.5:3 mix using 20mm HBG metal for foundation and basement etc. complete.(75.40.10)
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete.
Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position
B.W in cm 1:5 Mix using new Country bricks incl all cost and Conveyence incl All charges ( 75.31.10 )
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.(75.31.22)
Color washing Two coat with approved Emulsion Paint in all floors using best quality and approved varity of colour pigments including cost of all materials brushes and scaffolding charges etc. complete.as per std specifications
Supply and fixing of steel grill gate
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
T.V.LOGANATHAN
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .