Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹2.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.6 L+₹8,537.93 (3.35%)Admitted-Fee/PreQual/Technical/Finance | -12.15% | ₹2.6 L+₹8,537.93 (3.35%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.1 L+₹50,913.16 (20.0%)Admitted-Fee/PreQual/Technical/Finance | +2.00% | ₹3.1 L+₹50,913.16 (20.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
19 Aug 2026, 5:00 pmClosed
EXECUTIVE ENGINEER REW KISHTWAR
HALL NO. 4 O/O EXECUTIVE ENGINEER REW KISHTWAR
Refer BoQ
2026_RDPR_319078_51
e-NIT No 75 of REW KISHTWAR 2026-27 Dated. 01.08.2026
Open Tender
Civil Works
Percentage
30 days
Kishtwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹6,000
1 Sept 2026
3 Aug 2026
20 Aug 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: | - | cum | - | - |
| 2 | Cement Concrete (Cast-in-Situ) First Step | - | cum | 1 | - |
| 3 | Cement Concrete (Cast-in-Situ) 2nd & 3rd Step | - | cum | 1 | - |
| 4 | Providing and laying damp proof course 50 mm thick with cement concrete (1:2:4) (1: Cement, 2: Course Sand &4: Graded Stone 20 mm normal size) and curing complete | - | sqm | - | - |
| 5 | Brick work with clay (non-mdular) bricks of class designation 7.5 in foundation and plinth including curing in cement motor 1:6 (1 Cement : 6 course sand) | 1 | cum | - | - |
| 6 | Extra for brick work with common bumi clay bricks/ cement concrete bricks superstructure above plinth level upto floor level | 1 | cum | - | - |
| 7 | Dry random rubble measonary with hard stone in fondation and plinth: without bond stone | 1 | cum | - | - |
| 8 | Half brick measonary with common bumi clay (non-modular) bricks of class designation 7.5 in foundation and plinth including in: cement motor 1:3 ( 1 cement : 3 course sand) | - | sqm | - | - |
| 9 | Shuttering and centering including shuttering, propping etc and removal of form work | - | sqm | - | - |
| 10 | Steel reinforcement of RCC work including straightening, cutting, bending, placing and binding all complete upto plinth level hard drawn steel wire @85KG/cum | 1 | kg | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_1055342.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .