Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.1 LAdmitted-Finance | -45.00% | ₹39.1 L | L1 | Admitted-Finance |
| 2 | L2₹40.3 L+₹1.3 L (3.21%)Admitted-Finance | -43.24% | ₹40.3 L+₹1.3 L (3.21%) | L2 | Admitted-Finance |
| 3 | L3₹44.7 L+₹5.7 L (14.6%)Admitted-Finance | -36.99% | ₹44.7 L+₹5.7 L (14.6%) | L3 | Admitted-Finance |
| 4 | L4₹46.0 L+₹7.0 L (17.8%)Admitted-Finance | -35.20% | ₹46.0 L+₹7.0 L (17.8%) | L4 | Admitted-Finance |
| 5 | L5₹46.5 L+₹7.4 L (19.0%)Admitted-Finance | -34.55% | ₹46.5 L+₹7.4 L (19.0%) | L5 | Admitted-Finance |
Tender Value
₹71 L
EMD Value
₹1.4 L
Closing Date
31 Aug 2026, 4:00 pmClosed
Assistant Soil Conservation Officer CAD Pulwama
Office of the Assistant Soil Conservation Officer CAD Pulwama Opp. Womens Degree College.
Construction of Field Channels and Drains in Command Area Development Project at various work sites in different villages spread over in Dadsara, Pulwama. The details of individual works are appended with this E-NIT as Annexure-A.
2026_APD_321955_1
E-NIT NO.16 of 2026-27 DATED 22-08-2026
Open Tender
Civil Works
Percentage
90 days
Const of F.C at variousWork Sites in diff.villages
Please refer Tender document
2 documents required · 2 mandatory
₹1,600
Asstt. Soil Conservation Officer CAD Pulwama 0702
₹1.4 L
Assistant Soil Conservation Officer CAD Pulwama
1 Sept 2026
22 Aug 2026
1 Sept 2026
22 Aug 2026
31 Aug 2026
22 Aug 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Works: -
Earth works in excavation by manual means in trenches for foundations, drains (not exceeding 1.5m in width) and the like component not exceeding 10Sqm. on plain, depth upto 1.50 mts. including disposal of excavated earth upto 1 metrs. from cutting edge, dsposed earth to be levelled and neatly dressed in all kinds of soils. | 1 | m3 | - | - |
| 2 | Stone Soling: -
P/L Stone Soling dry hand packed tightly in the foundation, incl. ramming & watering. | - | m3 | 1 | - |
| 3 | Cement Concrete M-10 Gd. (Bed)
P/L cement conc. M-10 Gd. in 1:3:6 over soling layer with 40 mm nominal size of aggregate (Using coarse/ Fine Sand). | 1 | m3 | 1 | ₹1 |
| 4 | Form Work: -
Centering and shuttering of walls in foundation, footings, bases & irrigation channel on either side, etc; for mass concrete. | - | m2 | - | - |
| 5 | Cement Concrete in M-10 Gd.-Cost-In-Situ (Sides) : -
Providing and laying in position (20%) plum conc. M-10 Gd. in 1:3:6 of specified grade excl. cost of shuttering all works upto plinth level with 40 mm nominal size. | - | m3 | - | - |
| 6 | Cement Plaster:-
P/A 12 mm cement plaster using fine sand of 1:4 mix: | 1 | m2 | - | - |
| 7 | Carriage of Material: - | - | - | - | - |
| 8 | A By Mechanical Transport: - | - | - | - | - |
| 9 | Cement | - | M. Ton | - | - |
| 10 | Sand from | - | m3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_1076756.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .