| 1 | ₹83.7 Laccepted-aoc | ₹83.7 L | accepted-aoc |
Tender Value
₹84.9 L
EMD Value
₹1.7 L
Closing Date
13 Jan 2026, 10:30 pmClosed
Karnataka Slum Development Board
Infrastructure works - 112 Houses For the Construction of 976 Houses including infrastructure works for slum dwellers of Dharwad West assembly Constituency of Dharwad City under PMAY(U)- HFA Scheme
KSDB/2025-26/OW/WORK_INDENT368
KSDB/2025-26/OW/WORK_INDENT368
Open
Other Works
KSDB Dharwada Division
11 documents required · 9 mandatory · 2 optional
Executed in any one year minimum quantities of work As per KW-3 Class-3.2 (C) Earthwork : 260.54 Cum, Embankment : 135.00 Cum, Wetmix : 135.00 Cum, PCC : 114.23 Cum, CC Pavers : 659.00 Sqm.
Tenderer should upload scanned Single Similar Nature of Works Work Done Certificate issued by Government Departments signed by an officer not below the rank of Executive Engineer. The certificate should contain postal address of the office with pin code, Office Telephone Number, E-mail ID Compulsorily
To qualify for Award of this contract, b)Satisfactorily completed, as prime contractor, at least one Similar Work as value not less than 50% of the amount put to tender. Rs. 31.72 Lakhs
PWD Contractor Registration Certificate
Labour registration
EPF registration & ESI registration latest EPF paid challan should be uploaded
GST Registration Certificate
List of existing commitments and ongoing works
All Tenderers shall provide the requested information accurately and in sufficient detail in Section 3: Qualification information
Tenderer should upload scanned statement of Turn over Certificate Certified by Chartered Accountant with UDIN Number and along with face sheet of ITR, Balance Sheet and profit and loss statement for the block period as above Mentioned
Liquid assets and/or availability of creditfacilities of 30% put to Tender Amount. Rs.20.00 lakhs (Credit lines/letter of credit/certificates from the banks for meeting the fund requirement etc)
Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value.
Banker Details for reference
Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) Rs. 100.00 Lakhs (usually not less than the estimated Cost for works costing up to Rs.100 Lakhs)
Adhaar Card / PAN card
₹2,130
₹1.7 L
13 Jan 2026
1 Jan 2026
15 Jan 2026
12 Jan 2026
9 Jan 2026
Infrastructure works - 112 Houses For the Construction of 976 Houses including infrastructure works for slum dwellers of Dharwad West assembly Constituency of Dharwad City under PMAY(U)- HFA Scheme
Pavers & Flagging Concrete : Earth work for lowering and levelling the ground other than foundation works by mechanical means upto 3.00 depth, including providing shoring strutting and bracing, remova...
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and thencompacted...
Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes m...
Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregatesas per relevant IS Codes machine mixed with super ...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading...
Providing, laying, spreading and compacting graded stoneaggregate to wet mix macadam specification including premixingthe Material with water at OMC in mechanical mix plant carriageof mixed Material b...
Providing and laying 80mm thick factory made precast M -30grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS15658 for Commercial Traffic Axle load repetitions upto 10MSA& for Residential Str...
Electrical Work (Panel Board) 112 Houses : Supplying A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted...
Fabricating supplying and mounting MS box made out ....SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped...
Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/panel board. 63 A 4 pole ---- With all Lead and Lift Loading and unloading as per ...
Supplying, fixing and wiring 0 to 600V 96x96mm AC Voltmeter on existing panel/wood board. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Supplying, fixing and wiring 0 to 30V Direct Reading DC Voltmeter/Ammeter. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Supplying and fixing digital frequency meter with latest micro controller technology, ultra bright 4 digit LED display, from 30-500V AC and optional or relay output for high/low frequency and wiring c...
Supplying and fixing of Modular MCB Devices (Tripper) With Breaking capacity of 6kA. 16 - 32 A SP ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Supplying of on load change over switches 4 poles, AC23A Duty, 415V, 50Hz, AC Supply. (Open Execution) upto 63A ---- With all Lead and Lift Loading and unloading as per the direction of engineer in ch...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS...
Supplying and fixing of Modular MCB Devices (Tripper) With Breaking capacity of 6kA.63 A TP ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
GI Pipe 100mm (Nominal Bore), Medium Class (including Accessories) ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Supplying and Fixing........mm dia clampsss A GI pipe bracket upto 2.7 meters long terminated with a reducing collar of 40x25mm to which extra pipe of 175mm length is fixed for fixing MV/SV/MH/FTL str...
Supplying and fixing L.T. cast Iron pot heads suitable for 1.1 KV class UG cable filled with necessary bitumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc 70Sqmm -...
Heavy Duty Copper Terminal Long Barrel. 70 Sqmm Copper Terminal, Apprx Wt: 38 Gm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Aluminium End Terminal (Lug). 70 Sqmm Copper Terminal, Apprx Wt: 38 Gm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Supplying & fixing of Porcelain fuse channel with cut out on
existing wooden/panel using necessary nuts, bolts and washers. 16Amps ---- With all Lead and Lift Loading and unloading as per the directio...
Supplying & fixing of Porcelain fuse channel with cut out on
existing wooden/panel using necessary nuts, bolts and washers. 32Amps ---- With all Lead and Lift Loading and unloading as per the directio...
Supplying & fixing of Porcelain fuse channel with cut out on
existing wooden/panel using necessary nuts, bolts and washers. 63Amps ---- With all Lead and Lift Loading and unloading as per the directio...
Supplying and drawing 3 core flat PVC sheathed submersible pump cable manufactured with electrolytic grade copper with flexible copper with low resistance conductor confirming to IS:8130-1984 and virg...
Supplying heavy gauge PVC conduit pipe …….dia .......mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of R...
Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 100Amps ---- With all Lead and Lift Loading and unloading as per the directi...
1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975. 50 Sqm...
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff. 2.5 to 25 Sqmm ---- With all Lead and Lift Loading and unloadin...
Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution light...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 ...
Earthing: Providing and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of sa...
Earthing: Providing and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of sa...
RCC Pole 9Mtr long for third pole ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Double Pole Set ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11KV Horizontal cross arm with HTST with C and N and B ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV, 5KN composite/polymeric pin insulator (24mm dia FP Rod) ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Silicon Rubber Composite Insulator/11kV 45KN polymeric Insulator (disc) ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
RABBIT ACSR CONDUCTOR FOR 11KV LINE AND JUMPS ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
200Amps S/B GOS SET ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
H Frame for mounting GOS SET ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV, 3X95 Sqmm XLPE UG Cable Round armoured ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Straight Through Jointing Kits HS Type suitable for 3X95 Sqmm Cable ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Cable Termination Kit Outdoor HS Type Suitable for 95 Sqmmm Cable ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Cable covering tiles 250X125X40mm or 125X125X40mm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Artificial/Manufacture Sand ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
GI Pipe, 100mm dia for drain crossing, cable raising etc., ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Route and Joint Indicating Stones ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Armoured L.T. UG Cable 1.1kV Class 185sqmm. 3.5 Core (60mtrX2run for each block) ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Epoxy Termination kit (pothead) suitable for 1.1kV class LT UG Cables for 3.5X185sqmm. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Compression type Aluminium Tubular in line connector for Aluminium conductor of 185sqmm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
RCC Pole 9Mtr long for third pole ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Double Pole Set ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11KV Horizontal cross arm with HTST with C and N and B ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
RABBIT ACSR CONDUCTOR FOR 11KV LINE AND JUMPS ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
200Amps S/B GOS SET ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
H Frame for mounting GOS SET ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Straight Through Jointing Kits HS Type suitable for 3X95 Sqmm Cable ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Cable Termination Kit Outdoor HS Type Suitable for 95 Sqmmm Cable ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
GI Pipe, 100mm dia for drain crossing, cable raising etc., ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Route and Joint Indicating Stones ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Labour Charges: a) Cable trench excavtion, 100X0.6X1=600, Ordinary soil ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Labour Charges: b) Laying of cable trench ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Labour Charges: c) Refilling and Consolidation ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Labour Charges: d) Covering the cable with tiles ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Labour Charges: e) Spreading Sand and forming with Sand round the cable ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Epoxy Termination kit (pothead) suitable for 1.1kV class LT UG Cables for 3.5X185sqmm. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Compression type Aluminium Tubular in line connector for Aluminium conductor of 185sqmm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
PART B: TRANSFORMER CENTRE INLUDING TRANSFORMER Material Cost : Soun pole 11.0 Mtr Long ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Three H Frame with Transfomer Seating and Seating angle support X arm for 11 mtr Spun Pole for 100/250kVA (Ug Cable) - GI ---- With all Lead and Lift Loading and unloading as per the direction of engi...
HT SIngle Top Support with bolts, nuts & washers ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11 KV, SKN Polymeric Pin Insulator (24mm Dia PRP Rod) ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Alkathene Tube 19mm Dia and in coils of 30 Mtrs ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
GI Wire 8 SWG ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Guy wire 7/10 SWG ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
GI Pipe 100 mm Dia ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
PVC Pipe 150 mm Dia ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
PVC Bend 150 mm Dia ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
PVC Pipe 25mm Dia ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV 3oid Core Type HG Ruse Unit ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV, 20OAmps, Bingle Break GOS ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Earthing materials pipe type for grounding ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV Lightning Arester, Metai Oxide 9kV, 5kA ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
PVC Ingulation Tape in rolls of 10 mtrs ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Horizontal Cross Arms ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
MS Fish plate ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Caution/ Danger Board ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Anti Climbing Device (12ntrs/ 1Kg GI Barbed Wire) Lumpsum ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
BEE 5 Star Rated 11kV/433V, 100kVA, 3 Phase 50 Cys Distribution Transformer with Oil ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
LT Distribution box with MCCB for 100KVA (SMC) ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
i, Ai Lead Wire - 120 Sqmm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
ii. Ai end terminals (Lugs) 120 sq mm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
iii. PG Ciamps - Rabbit to 120 Sqmm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
iv. Spacers for DTC Wiring ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
LT SMC Metering box with CTs and necessary wiring for housing ETV Meter for 100KVA ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
LT Electronic Tri-Vector Meter 5A, Clas6-0.5/ 1.0 accuracy DLMS Compatible ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
PART B: TRANSFORMER CENTRE INLUDING TRANSFORMER Labour Cost : Soun pole 11.0 Mtr Long ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Three H Frame with Transfomer Seating and Seating angle support X arm for 11 mtr Spun Pole for 100/250kVA (Ug Cable) - GI ---- With all Lead and Lift Loading and unloading as per the direction of engi...
HT SIngle Top Support with bolts, nuts & washers ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Concretag materlals for 11 Mts 8pun Pole a) Base concreting 1:4:8, 1000x1000x150mm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
b) Poje concreting 1:2:4, 1000x1000x2500 mm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
c) Coping 1:2:4 (as per actuals) ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
GI Pipe 100 mm Dia ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV 3oid Core Type HG Ruse Unit ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV, 20OAmps, Bingle Break GOS ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Earthing materials pipe type for grounding ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV Lightning Arester, Metai Oxide 9kV, 5kA ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Caution/ Danger Board ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Anti Climbing Device (12ntrs/ 1Kg GI Barbed Wire) Lumpsum ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
BEE 5 Star Rated 11kV/433V, 100kVA, 3 Phase 50 Cys Distribution Transformer with Oil ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
LT Distribution box with MCCB for 100KVA (SMC) ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
LT Wiring (From DTC to LT Line Through Merering Box & LT Protection Kit/LT Distribution Box) DOUBLE CIRCUIT for 100KVA ---- With all Lead and Lift Loading and unloading as per the direction of enginee...
LT SMC Metering box with CTs and necessary wiring for housing ETV Meter for 100KVA ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
LT Electronic Tri-Vector Meter 5A, Clas6-0.5/ 1.0 accuracy DLMS Compatible ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
PART C: SHIFTING OF EXISTING 250KVA TRANSFORMER Material Cost : 9 Mtr RCC DP Transformer Structure (Using 9 Mtr RCC Poles) for 250KVA ---- With all Lead and Lift Loading and unloading as per the direc...
11 KV, 5KN Polymeric Pin Insulator (24mm Dia FRP Rod) ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11KV 45 KN Polymeric Insulator ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Earthing materials pipe type for grounding ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Caution/Danger Board ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Anti Climbing Device (12mtrs/ lKg GI Barbed Wire) Lumpsum ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
GI Wire 8 SWG ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Guy wire 7/10 SWG ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV Solid Core Type HG Fuse Unit ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV Lightning Arester, Metal Oxide 9kV, 5kA ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV G.0O.3.Mounting H-Frame set for 200A Single break ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV, 200Amps, Single Break GOS ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
LT Distribution box 250 kVA with MCCB ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
i. Al Lead Wire -240 Sqmm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
ii. Copper Lugs 240 sq mm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
iii. PG Clamps - Rabbit to 240 Sqmm ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
iv. Spacers for DTC Wiring ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
V. Fish Plate with necessary Clamps,bolts &nuts etc complete (Galvanised) ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
LT SMC Metering box with CTs and necessary wiring for housing ETV Meter for 250KVA ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
PART C: SHIFTING OF EXISTING 250KVA TRANSFORMER Labour Cost : 9 Mtr RCC DP Transformer Structure (Using 9 Mtr RCC Poles) for 250KVA ---- With all Lead and Lift Loading and unloading as per the directi...
Earthing materials pipe type for grounding ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Caution/Danger Board ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Anti Climbing Device (12mtrs/ lKg GI Barbed Wire) Lumpsum ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV Solid Core Type HG Fuse Unit ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV Lightning Arester, Metal Oxide 9kV, 5kA ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV G.0O.3.Mounting H-Frame set for 200A Single break ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
11kV, 200Amps, Single Break GOS ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
R&R of BEE 5 Star Rated 1lkVj433V, 250kVA, 3 Phase 50 Cys Distribution Transformer with Oil ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
LT Distribution box 250 kVA with MCCB ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
LT Wirina (From DTC to LT Line Through Merering Box & LT Protection KIt/LT DIstribution Box) DOUBLE CIRCUIT for 250KVA ---- With all Lead and Lift Loading and unloading as per the direction of enginee...
LT SMC Metering box with CTs and necessary wiring for housing ETV Meter for 250KVA ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
R&R of LT Electronic Trij-Vector Meter 5A, Class-0.5/ 1.0 accuracy DLMS compatible ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW-3-Open Tender-976.doc
Tender Document • 2.35 MB
Notification.doc
Instructions to Tenderers • 0.10 MB
Download all tender documents and submit your bid