Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | ₹2.1 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 LAdmitted-Finance CW 545 SANJAY GANDHI TRANSPORT NAGAR NEW DELHI 110042 | NORTH | DELHI | 110042 | ₹3.1 L | L2 | Admitted-Finance |
| 3 | L3₹3.2 LAdmitted-Finance | ₹3.2 L | L3 | Admitted-Finance |
| 4 | L4₹4.0 LAdmitted-Finance | ₹4.0 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HYDROCON ENGINEERS L4 | Goodwill Enterprises L1 | DEV ENGINEERS L3 | Devraj Enterprises L2 |
|---|---|---|---|---|---|---|---|
| 1.01 | Hiring & Running of 25 HP Waste water/Sewage Dewatering Pump-set with all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length upto 50 mtrs approx. (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. by deploying one Semi-skilled & one Un-skilled staff in each shift. The Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-in charge.
Note :-Electricity will be provide by the department.
Period :- 90 Days x 3 = 270 Shifts | 270 | Shifts | 4,03,380 ₹4,03,380 | 2,11,680 ₹2,11,680 | 3,23,730 ₹3,23,730 | 3,10,500 ₹3,10,500 |
Tender Value
₹6.9 L
EMD Value
₹13,800
Closing Date
24 Mar 2026, 3:00 pmClosed
Executive Engineers E(EnM)M-9
C-2A Block Opp. Geeta Mandir Janakpuri
Installation of Sewage trolley on hiring basis at Nawada Housing Complex near metro Pillar No. 792.
2026_DJB_288877_3
e-NIT No.30 / (EnM)M-9/ 2025-26
Open Tender
Civil Works
90 days
C-2A Block Opp. Geeta Mandir Janakpuri
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB Account No. 50448339804
₹13,800
27 Mar 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
Hiring & Running of 25 HP Waste water/Sewage Dewatering Pump-set with all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length upto 50 mtrs approx. (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. by deploying one Semi-skilled & one Un-skilled staff in each shift. The Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-in charge. Note :-Electricity will be provide by the department. Period :- 90 Days x 3 = 270 Shifts
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_383308.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid