Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3 LAccepted-AOC TIRUVANNAMALAI TAMIL NADU | NAMAKKAL | TAMIL NADU | 621215 | ₹3 L Quoted ₹1.4 L | L1 | Accepted-AOC ok |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.7 L
EMD Value
₹3,400
Closing Date
25 Sept 2023, 3:00 pmClosed
Executive Officer
6/A, Abdul Kuthus Street, Polur
Construction of Culvert at V.S.Pilaiyar Koillst Munesvaran koill near and VRS Nagar Mannar House near in Polur Town Panchayat
2023_DTP_370425_1
271/2023/HC
Open Tender
Civil Works
45 days
Polur
II Class
4 documents required · 4 mandatory
₹0
₹3,400
Yes
1 Jun 2024
16 Sept 2023
26 Sept 2023
16 Sept 2023
25 Sept 2023
16 Sept 2023
Amount
Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS20B
Plain Cement Concrete 1:4:8 Mix (one Part of cement, four Part of M- Sand and Eight Part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including
Steel Centering for the Soffits of PCC/RCC works for the following items including cost of all materials, labour strutting, removing etc., as directed by Departmental Officers.
Plain Cement Concrete 1:3:6 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc.,
Supplying fabricating and placing in position of RTS Rods for reinforcement at all RCC works including cost of steel, binding wire, labour charges etc. complete as directed by
Reinforced Cement Concrete 1:1.5:3 mix using 20mm size hard granite broken stone (machine crushed) excluding cost of reinforcement, fabrication and placing th egrills in
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid