Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.8 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹4.0 L+₹9,580 (2.44%)Rejected-AOC | 2 | Rejected-AOC L2 |
Tender Value
₹5.2 L
EMD Value
₹5,100
Closing Date
28 Sept 2021, 2:00 pmClosed
SE / M-II / TTPS
Superintending Engineer, Mechanical-II, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit V Patch up work in Air ingress areas of I II pass of Boiler and cleaning of accumulated ash from pent house in Unit V during overhaul for the year 2021 2022
2021_EB_210257_1
CE TTPS SE M II No 264 2021 2022
Open Tender
Miscellaneous Works
Item Rate
15 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹5,100
Yes
15 Nov 2022
10 Sept 2021
29 Sept 2021
10 Sept 2021
28 Sept 2021
10 Sept 2021
Charges for transportation of insulation wool, cladding sheet of the air ingress area located from 8m to 56m EL, transportation of cladding sheet, wool, fixing of wool, sheet etc., and disposal of debris etc., complete
Charges for providing refractory over the screen tube area, steam cooled front wall slope, pent house and other Boiler pressure parts areas, including transportation of refractory from stores to site and water from ‘O’ m level etc., complete.
Charges for removal of pent house insulation skin casing sheets and insulation for an area of 3m2 and removal of inner casing plate of 2 m2 and refixing the same after completion of work.
Charges for fin welding by cleaning, surface preparation and welding.
Charges for leading, lifting and arranging platform and scaffolding inside the boiler and dismantling after completion of work.
Charges for collecting, removal of ash inside the boiler Penthouse headers and boiler drum area, disposal of ash to the ground floor ash trench. Charges for removal of ash from Economizer hopper flue gas deflection slope and dispose to ground floor ash trench. Charges for removal of ash from Boiler front and rear ‘S’ panel enclosure area and dispose to ground floor ash trench.
Charges for transportation of hanger support Tie rods, turn buckles from stores to 8m level coutant bottom area, dismantling the worn-out / damaged hanger rods, erection of new rods with turn buckle, welding and adjusting or rectifying the worn-out / damaged hanger rods, including all consumables T&P etc complete.
Charges for transportation of S.S wire mesh from central stores to eco hopper area, Providing temporary platform at required location, dismantling the existing worn-out S.S wire mesh from the super heater header, cutting the new mesh to the required size by using cutting electrode, bending to the required profile, welding hooks on the header. fixing the new wire mesh, welding with the hook, providing castable refractory on the wire mesh, dismantling the platform after completing the work, devolution of retrieved materials including the charges for scaffolding materials, SS welding electrodes, cutting electrode etc. and transportation charges.
Charges for removal of worn-out / damaged, plastering, insulation from the critical pipelines Headers, transportation of plastering material, insulation hook and retainer plate etc., from stores to site and re-insulation, plastering. After completion of work devolution of scarps to stores and disposal of debris including consumables and T&P’s etc
SARASWATHI ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .