| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.9 CrAccepted-AOC 0 ABHISHEK ENTERPRISES CHARWA PACHIMTHOK KAUSHAMBI UTTAR PRADESH 212203 | KAUSHAMBI | UTTAR PRADESH | 212203 | ₹21.9 Cr Quoted ₹22.0 Cr | L1 | Accepted-AOC Tender Accept |
| 2 | L2₹23.6 CrRejected-Finance 113 26A SWAROOP NAGAR KANPUR 208002 UP | KANPUR | KANPUR | UP | 208002 | ₹23.6 Cr | L2 | Rejected-Finance Financial Bid rejected being higher rate |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹22 Cr
EMD Value
₹33 L
Closing Date
17 Mar 2020, 12:00 pmClosed
EE PD PWD Unnao
EE PD PWD Unnao
Widening and Strengthening of Sahjani Shankarpur Sarai Road O.D.R. Sanctioned under State Sector in FY 2019-20 in District Unnao
2020_CEUCZ_445693_1
798M/1MT/E-Tender Dt. 15-02-2020
Open Tender
Civil Works
365 days
Unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
EE PD PWD Unnao
₹33 L
Yes
SE Unnao Circle PWD Unnao
14 Aug 2020
7 Mar 2020
18 Mar 2020
7 Mar 2020
17 Mar 2020
12 Mar 2020
12 Mar 2020
Amount
Construction of subgrade with approved material obtained from borrowpits with all lifts and leads, spreading, grading to required slope and compected to meet requirement of table 300-2. (Including labour Cess & Excluding GST)
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slope in accordance with requirements of lines, grades and cross section and transporting to the embankement location within all lifft and lead. (Including labour Cess & Excluding GST)
Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads, spreading, grading to required slope and compected to meet requirement of table 300-2.(for compaction) (Including labour Cess & Excluding GST)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including labour Cess & Excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including labour Cess & Excluding GST)
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site , laying with 1% OPC cement and 3.5% emulsion in uniform single layer on subbase/base and compacting with the road roller to achieve the desire density .(Including labour Cess & Excluding GST)
Construction of earthen shoulder with approved material obtained from borrowpits with all lifts and leads, spreading, grading to required slope and compected to meet requirement of table 300-2. (Including labour Cess & Excluding GST)
Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom. (Including labour Cess & Excluding GST)
Providing and laying bituminious concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects. (Including labour Cess & Excluding GST)
For U-Type Drain Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including labour Cess & Excluding GST)
For U-Type Drain/3.0 mt./2.0 mt. Span RCC culvert Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 (Including labour Cess & Excluding GST)
For U-Type Drain/3.0 mt./2.0 mt. Span RCC culvert Supplying fitting and placing TMT bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses. (Including labour Cess & Excluding GST)
For 600mm dia /1000 mm dia HP culvert/ 3.0 mt./2.0 mt. Span RCC culvert Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.(Including labour Cess & Excluding GST)
600mm dia HP culvert Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works,back filling, concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST)
For U-Type Drain/600mm dia /1000 mm dia HP culvert/3.0 mt./2.0 mt. Span RCC culvert Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.(Including labour Cess & Excluding GST)
For 600mm dia /1000 mm dia HP culvert/3.0 mt./2.0 mt. Span RCC culvert Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations .(Including labour Cess & Excluding GST)
For 600mm dia /1000 mm dia HP culvert/3.0 mt./2.0 mt. Span RCC culvert Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. (Including labour Cess & Excluding GST)
For 600mm dia /1000 mm dia HP culvert Plastering with cement mortar (1:3) in substructure/superstracutre as per technical specification. (Including labour Cess & Excluding GST)
1000mm dia HP culvert Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works, back filling, concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST)
350 mm Hume pipe Culvert Laying reinforced cement concrement for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works, back filling, concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST)
DELTA ERECTORS PVT LTD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf