| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.5 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹84.7 L+₹2.2 L (2.69%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹83.6 L
EMD Value
₹84,000
Closing Date
7 Jul 2023, 3:00 pmClosed
The Project Director DRDA Kancheepuram
O/O DRDA Kancheepuram
Strengthening of 2 Rural road in Sriperumbudur Panchayat Union in Kancheepuram District having Package No TNKPM 11/2023-24 Under MGSMT-25 Percentage Component 2022-23 and 2023-24
2023_RDTN_327609_1
DIPR/2982/Tender/2023 dt.13.06.2023
Open Tender
Civil Works - Roads
Lump-sum
180 days
Kancheepuram
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹84,000
O/O DRDA Kancheepuram
23 Aug 2023
15 Jun 2023
7 Jul 2023
15 Jun 2023
7 Jul 2023
15 Jun 2023
22 Jun 2023
Amount
Part I - Strengthening of Kaduvancherry colony to Ottankaranai Road Km 0/0 - 1/0 (R-38) In Kaduvancherry Panchayat cost of Construction cost Rs.41.57 Lakh & Maintaenance Cost Rs.3.60 lakh
Clearing the scrub jungle including all labour charges for burrying and burning etc
Picking 5 cm to 10 cm exiting surface and sectioning-1 sqm etc completed
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying Primer coat over the BT surface using with 7.00 Kg -Emulsion bitumen binder 7.00 kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges
Applying Tack coat over the BT surface using with 7.00 Kg -Emulsion bitumen binder 7.00 kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Rev-5
Providing and laying including cost and conveyance of Gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., comp for base course
Providing and Laying of Hot Applied Thermoplastic Compound 2.50mm Thick including Reflectorising Glass Beads as per IRC 35 etc complete as per MORT & H Specifications No. 803
Provision For KM Stone
Provision For HM Stone
Provision for 60cm Equilateral Triangle cautionary signboard
Provision for Retro reflection board
Cost of reflectors
Provision for Name board
Construction of RCC Slab culvert 1.50m Span at ch 160m
Earth work Excavation for Foundation of structures upto 3.00m depth as per drawing and technical specification clause 1104 including seting out construction of suring and bracing removal stumps and other deletarious methods dressing of sides and bottoms and back filling with approved material
Supply and filling foundation and basement with filling sand in layer not more than 15cm thick well ramed watered and compacted complete complying with standard specification
Cement conrete 1:4:8 mix using 40 MM HBG Metal for foundation including watering wherever necessary and laiding layers of not more than 50cm thick compacting etc. Complete complying with standard specification and as directed by the departmental officials
Cement conrete 1:3:6 mix using 40 MM HBG Metal for foundation including watering wherever necessary and laiding layers of not more than 50cm thick compacting etc. Complete complying with standard specification and as directed by the departmental officials
Supply and erecting centering shuttering including necessary support for plain surface in foundation and basebent and in all floors for RCC column footing, column plinth beem, beems, roof slabs, stair case steps, bedblocks, critical pier etc., using mild steel sheets of size 90x60cm and 10 gage stiff and melded with MS angles of size 25x3mm car boarding laid over silver oak scantlings of size 10cm by 6.5cm spaced of about 90cm c/cand supported by casurina props of 10cm to 13cm dia space at 75 cm C/C completed compyling with standard specification ans as directed by departmental offices etc. completed
Below Sill
Deck Slab
Supplying and erecting centring sor sides and soffits with M.S. sheets laid over silver oak joists with casurina props for supporting labour charges etc completed
Cement conrete 1:2:4 mix using 20 MM HBG Metal for foundation including watering wherever necessary and laiding layers of not more than 50cm thick compacting etc. Complete complying with standard specification and as directed by the departmental officials
Cement conrete 1:1.5:3 mix using 20 MM HBG Metal for all item of RCC works including watering wherever necessary and laiding layers of not more than 50cm thick compacting etc. Complete complying with standard specification and as directed by the departmental officials
Supplying and Fabricating and placing in position mid / tor steel for all RCC works as per the design given including cost of all steel binding wire and labour forfabrication etc complete complying with standard specification
Providing and fixing 6mm bituman felt for expansion joint between Dirtwall & Deck wall
Providing and fixing kraft paper for bearing between bed block & Deck slab
Providing and fixing 20mm bituman pad between Bed Block & Dirt wall
Provindg weepholes in brick masonry / stone masonry plain / reniforced concreteeee abultment wing wall retune wall with 100mm dia AC pipe extending through the full width of the structure with slope towards drawing face complete
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part II - Strengthening of Perinjambakkam Colony Road Km 0/0 - 1/00 (R-146) In Perinjambakkam Panchayat cost of Construction cost Rs.34.81 Lakh & Maintaenance Cost Rs.3.60 lakh
Clearing the scrub jungle including all labour charges for burrying and burning etc
Picking 5 cm to 10 cm exiting surface and sectioning-1 sqm etc completed
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying Primer coat over the BT surface using with 7.00 Kg -Emulsion bitumen binder 7.00 kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges
Applying Tack coat over the BT surface using with 7.00 Kg -Emulsion bitumen binder 7.00 kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Rev-5
Providing and laying including cost and conveyance of Gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., comp for base course
Providing and Laying of Hot Applied Thermoplastic Compound 2.50mm Thick including Reflectorising Glass Beads as per IRC 35 etc complete as per MORT & H Specifications No. 803
Provision For KM Stone
Provision For HM Stone
Provision for 60cm Equilateral Triangle cautionary signboard
Provision for Retro reflection board
Cost of reflectors
Provision for Name board
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
V.MUGUNDAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .