Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.6 CrAdmitted-Finance 1704 SECTOR 21 PANCHKULA | -46.21% | ₹14.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹15.8 Cr+₹1.2 Cr (8.01%)Admitted-Finance KHANDAY PLANT NH 44 NIPORA DISTRICT ANANTNAG JAMMU KASHMIR UT INDIA 192102 PH NO 91 7006355099 | -41.90% | ₹15.8 Cr+₹1.2 Cr (8.01%) | L2 | Admitted-Finance |
| 3 | L3₹18.4 Cr+₹3.8 Cr (26.2%)Admitted-Finance | -32.13% | ₹18.4 Cr+₹3.8 Cr (26.2%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical NATIONAL HIGHWAY BYE PASS CROSSING ATHWAJAN SRINAGAR 191101 KASHMIR | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 191101 | - | - | - | Rejected-Technical Non-Responsive |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹29.6 Cr
EMD Value
₹59.3 L
Closing Date
9 May 2024, 4:00 pmClosed
Chief Engineer R and B Central Kashmir
Chief Engineer PW(R and B) Department Central Kashmir Near Silk Factory, Raj Bagh, Srinagar
Maintenance works and activities on section from Seer to Pahalgam (km. 19.050 to km 47.000) of NH No.501 in the UT of JK (Total length 27.95 Kms)
2024_MoRTH_803772_1
RO/JK/PD-1ST/NIT-02/2024
Open Tender
Civil Works
EPC Contract
1825 days
PAHALGAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
RPAO MoRTH CHANDIGARH
₹59.3 L
8 Jun 2024
12 Apr 2024
10 May 2024
12 Apr 2024
9 May 2024
12 Apr 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Bill 01: ROUTINE MAINTENANCE (Lump Sum) [for Total 60 months] | 27.95 | Km | 28,18,725 | ₹7,87,83,363.75 |
| 2 | BILL 02: INITIAL RECTIFICATION WORKS (Lump
Sum)[To be completed within 06 months from the notice to proceed] | 27.95 | Km | 20,87,335 | ₹5,83,41,013.25 |
| 3 | BILL 03: PERIODICAL MAINTENANCE WORKS
(Lump Sum)[To be completed as decided by the Engineer but overlay of Highway to be completed within 24/48 months(as the case may be) from the date of notice to proceed]. | 27.95 | Km | 48,17,640 | ₹13,46,53,038 |
| 4 | BILL 04: EMERGENCY WORKS (Unit Rates)
Rs. 884365 x 27.95 = Rs. 2,47,18,000/-
Cost of Emergency Works as per quote of bidder
(BILL NO. 4 X (100-Quoted %age) in case of discount
BILL NO. 4 X (100+Quoted %age) in case of premium) | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
Tendernotice_2.pdf
PDF • 2.97 MB
BOQ_844862.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .