Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹28.8 L+₹2.1 L (7.66%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹30.9 L+₹4.1 L (15.4%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹43 L
EMD Value
₹86,000
Closing Date
21 Sept 2026, 6:00 pmClosed
EXECUTIVE ENGINEER PWD(RNB) DIVISION RAMNAGAR
EXECUTIVE ENGINEER PWD(RNB) DIVISION RAMNAGAR
PLEASE REFER TO BOQ
2026_PWDJK_324724_1
e-NIT No. 66 of 2026-27 Dated- 15-09-2026
Open Tender
Civil Works
Percentage
90 days
RAMNAGAR
PLEASE REFER TO NIT
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER PWD(RNB) DIVISION RAMNAGAR
₹86,000
26 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kind of soil 80% | 52 | Cum | 256.85 | ₹13,356.2 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:ordinary rock 20% | 3.2 | Cum | 493.5 | ₹1,579.2 |
| 3 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles 10 mm to 25 mm | 120 | sqm | 57 | ₹6,840 |
| 4 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. | 378.12 | Cum | 38.9 | ₹14,708.87 |
| 5 | Demolishing Of fountain Walls & Grill Including fitting Material in the Fountain | 5.8 | cum | 1,725 | ₹10,005 |
| 6 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead.For thickness of tiles above 25 mm and upto 40 mm. | 135 | sqm | 89.95 | ₹12,143.25 |
| 7 | Taking out the Sitting Benches and open Gym Equipments | 18 | each | 150 | ₹2,700 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 31.5 | Cum | 4,826.5 | ₹1,52,034.75 |
| 9 | Providing and laying P.C.C in 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size) | - | Cum | 5,202.9 | - |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level ( 1 : 3 : 6)1 cement 3 coasre sand 6 stone aggregate grade , with 20mm nominal size . | - | Cum | 5,733.6 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_1095616.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .