| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹35.1 L Construction of Main gate at entrance of the institute, flooring of Institute committee hall and vertical extension of boundary wall of residential complex (450) Phase-I at ICAR-IIVR, Varanasi | Construction of Main gate at entrance of the institute, flooring of Institute committee hall and vertical extension of boundary wall of residential complex (450) Phase-I at ICAR-IIVR, Varanasi | L1 | |
| 2 | L2₹40.9 L+₹5.8 L (16.7%) Construction of Main gate at entrance of the institute, flooring of Institute committee hall and vertical extension of boundary wall of residential complex (450) Phase-I at ICAR-IIVR, Varanasi | Construction of Main gate at entrance of the institute, flooring of Institute committee hall and vertical extension of boundary wall of residential complex (450) Phase-I at ICAR-IIVR, Varanasi | L2 | |
| 3 | L3₹41.7 L+₹6.6 L (18.9%) Construction of Main gate at entrance of the institute, flooring of Institute committee hall and vertical extension of boundary wall of residential complex (450) Phase-I at ICAR-IIVR, Varanasi | Construction of Main gate at entrance of the institute, flooring of Institute committee hall and vertical extension of boundary wall of residential complex (450) Phase-I at ICAR-IIVR, Varanasi | L3 | |
| 4 | L4₹43.6 L+₹8.5 L (24.1%) Construction of Main gate at entrance of the institute, flooring of Institute committee hall and vertical extension of boundary wall of residential complex (450) Phase-I at ICAR-IIVR, Varanasi | Construction of Main gate at entrance of the institute, flooring of Institute committee hall and vertical extension of boundary wall of residential complex (450) Phase-I at ICAR-IIVR, Varanasi | L4 | |
| 5 | L5₹47.8 L+₹12.7 L (36.2%) Construction of Main gate at entrance of the institute, flooring of Institute committee hall and vertical extension of boundary wall of residential complex (450) Phase-I at ICAR-IIVR, Varanasi | Construction of Main gate at entrance of the institute, flooring of Institute committee hall and vertical extension of boundary wall of residential complex (450) Phase-I at ICAR-IIVR, Varanasi | L5 |
| Sl No | Description | Qty | Unit | devender kumar L5 | M/s Santosh Associates L2 | MADAN KUMAR L3 | S. K. CONSTRUCTIONS L1 | SAURABH ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|
| 1 | CIVIL WORK | - | - | -15.55 ₹47,78,307.68 | -27.65 ₹40,93,671.53 | -26.26 ₹41,72,319.81 | -37.98 ₹35,09,184.63 Lowest | -23.03 ₹43,55,078.06 |
Tender Value
₹56.6 L
EMD Value
₹1.1 L
Closing Date
20 Sept 2022, 5:15 pmClosed
AE-C-4
Brijesh Bahadur
KENDRIYA SADAN 34 M.G. MARG CIVIL LINES
Construction of Main gate at entrance of the institute, flooring of Institute committee hall and vertical extension of boundary wall of residential complex (450) Phase-I at ICAR-IIVR, Varanasi Subwork/Packages: MAIN WORK
19019
38/EE/ALLAHABAD/2022-23
OPEN
Civil Works - Buildings
NCB
4 months
Varanasi, Uttar Pradesh
7 documents required · 7 mandatory
₹1.1 L
Not Applicable
20 Sept 2022
14 Sept 2022
20 Sept 2022
20 Sept 2022
20 Sept 2022
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Main+Gate+Entrance+IIVR.pdf
document • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .