Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC ARIMALAM TAMIL NADU | ₹1.2 Cr | L1 | Accepted-AOC L1 Quoted Less Then Tender Value |
| 2 | L2₹1.2 Cr+₹68,364.12 (0.59%)Rejected-AOC | ₹1.2 Cr+₹68,364.12 (0.59%) | L2 | Rejected-AOC L2 Quoted Greater Then Tender Value |
| Sl No | Description | Qty | Unit | J.Prabakaran L2 | ARIVAZHAGAN L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of the road from CC Road to Therkkukollaimedu Road Km 0/0-2/150 (R-8) | |||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 3,096 | Sqm | 7.5 ₹23,220 | 5.65 ₹17,492.4 Lowest |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete | 2,687.23 | Sqm | 25.36 ₹68,148.15 | 21.54 ₹57,882.93 Lowest |
| 4.00Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads leads by deploying mechinery including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For embankment/Sub grade (CBR:8 & Lead:15) | |||||
| 5.00 | Km 0/0 - 2/150 | 387 | Cum | 135.29 ₹52,357.23 | 131.29 ₹50,809.23 Lowest |
| 6.00Collection and Supply of gritty gravel from Approved quarry includinf Cost and Convenyance of all materials to sitr including all labour Charges for Spearedaing and Compaction with Power Roller etc Complete | |||||
| 7.00 | Km 0/0 - 2/150 | 387 | Cum | 335.94 ₹1,30,008.78 Lowest | 335.94 ₹1,30,008.78 Lowest |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired for etc Complete | |||||
| 9.00 | Km 0/0 - 2/150 | 1,209.38 | Cum | 2,057.56 ₹24,88,371.91 Lowest | 2,057.56 ₹24,88,371.91 Lowest |
| 10.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete | |||||
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
30 Jun 2025, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA,VELLORE
THE PROJECT DIRECTOR DRDA,VELLORE
Vellore District NABARD XXXI 2025-26 Strengthening of two roads in nelvoy and mottupalayam at kaniyambadi block package no 03
2025_RDTN_568698_1
Procc.no/2866/2025
Open Tender
Civil Works
Item Rate
180 days
THE PROJECT DIRECTOR DRDA
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.3 L
22 Aug 2025
13 Jun 2025
30 Jun 2025
13 Jun 2025
30 Jun 2025
13 Jun 2025
Amount
Strengthening of the road from CC Road to Therkkukollaimedu Road Km 0/0-2/150 (R-8)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads leads by deploying mechinery including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For embankment/Sub grade (CBR:8 & Lead:15)
Collection and Supply of gritty gravel from Approved quarry includinf Cost and Convenyance of all materials to sitr including all labour Charges for Spearedaing and Compaction with Power Roller etc Complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired for etc Complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic etc Complete
60 cm Equilateral triangle cautionary signboard
Provision for K.M. stone
Provision for H.M. stone
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Strengthening of the road from AK Road to Kalamburan Kottai Road Km 0/0-1/130 (R-16)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 mm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A.
Collection and supply of Grity gravel for Basecourse And side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying tack coat over WBM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
60 cm equilateral triangle
Chevron signs 90cm
Provision for Hectometer stone
Provision for KM Stone
Retaining Wall @ Ch 670m (Rt Side)
Earth work excavation in all class of soil with initial lead and lift as per ss 20 B for foundation
CC 1:4:8 Mix using 40mm metal including cost and conveyance and labour charges etc complete.
Supply and erecting centering charges including cost and conveyance and labour charges etc complete.
CC 1:3:6 Mix using 40mm metal including cost and conveyance and labour charges etc complete.
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
J.Prabakaran (BID ID -1377042)
Bidder Name
ARIVAZHAGAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .