Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹3 L
Closing Date
12 Oct 2026, 2:00 pm
SE,PWD(R and B), Diphu Circle 1,Diphu
SE,PWD(R and B), Diphu Circle 1,Diphu
Improvement and widening of road at Rongchingbar under Special Grant to KAAC for the year 2026-27.
2026_KAAC_54076_1
DPU/SplGrant(KAAC)/2026-27/6
Open Tender
Civil Works – Roads
Item Rate
Diphu
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,000
₹3 L
Yes
SE,PWD(R and B), Diphu Circle 1,Diphu
22 Sept 2026
22 Sept 2026
13 Oct 2026
22 Sept 2026
12 Oct 2026
22 Sept 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass,
bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of
such trees cut earlier and disposal of unserviceable materials and stacking of
serviceable material to be used or auctioned, upto a lead of 1000 m including
removal and disposal of top organic soil not exceeding 150 mm in thickness as
per Technical Specification Clause 201. II By Mechanical Means (a)In area of non-thorny jungle | 0.26 | Hect | - | - |
| 2 | Cutting of trees, including cutting of trunks, branches and removal of stumps &
roots refilling compaction of backfilling and stacking of serviceable material byroots, refilling, compaction of backfilling and stacking of serviceable material by
manual means with all lifts as per Technical Specification Clause 201. (B)Lead upto 1000 m (iv) Girth above 1800 mm to 2700 mm | 7 | Each | - | - |
| 3 | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of
servicable material by manual means as per Technical Specification clause 201. (B)Lead upto 1000 m (iv) Girth above 1800 mm to 2700 mm | 7 | Each | - | - |
| 4 | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other
structure comprising of masonry, cement concrete, wood work, steel work,
including T&P and scaffolding wherever necessary, sorting the dismantled
material, disposal of unserviceable material and stacking the serviceable material
with all lifts and lead of 1000 m as per Technical Specification Clause 202. II By Mechanical Means (a)Cement Concrete | 540 | Cum | - | - |
| 5 | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical
Means Scarifying the existing bituminous road surface to a depth of 150 mm and
disposal of scarified material with a lift upto 3.0m and lead upto 1000 m as per
Technical Specification Clause 301.4. | 1,950 | Sqm | - | - |
| 6 | Excavation in soil in Hilly Area by mechanical means including cutting and
trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m
and a lead upto 20 m as per Technical Specification Clause 1603.1 | 2,310 | Cum | - | - |
| 7 | Construction of breastwall cum drain | 350 | Rm | - | - |
| 8 | Construction of pucca drain | 50 | Rm | - | - |
| 9 | Construction of Toe wall | 119 | Rm | - | - |
| 10 | Construction of 1000 mm HP culvert | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tendernotice_2.pdf
PDF • 0.98 MB
SBDSplGranttokaac2627.pdf
Tender Documents • 4.47 MB
BOQ_84947.xls
BOQ • 0.25 MB
FOBSplGranttokaac2627.pdf
Additional Documents • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .