Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
9 Oct 2026, 9:00 amDue tomorrow
DSCO
Soil conservation complex sector 56 sas nagar
Construction of stone masonary structure village saho majra bada pind
2026_DOA_176474_1
DSWC/MOH/2026-2027/20
Open Tender
Civil Works
Percentage
90 days
Ropar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹1.2 L
29 Sept 2026
29 Sept 2026
9 Oct 2026
29 Sept 2026
9 Oct 2026
29 Sept 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Tender No. DSWC/DSCO/MOH/2026-27/20
Construction of Stone Massonry Water Recharging/Harvesting Structures, Crate Wire Structures/Retaining walls & Crate Wire/Silt Retention Structure at Village Saho Majra, Bada Pind & Sarsa Nangal Under Sub Division Rupnagar Tehsil & Distt. Rupnagar.
RATES FOR CIVIL WORK( Approved by CCS PUNJAB Chandigarh)
Name & Address of Firm/ Bidder
Total Estimated Cost 5880642
Quoted by Contractor (as %age less of estimated Amount) Less (-%) Amount Quoted
S.No. Item of Work Qty. Unit Rate Total
1 For Construction of Crate Wire Structures/Retaining Walls No.1 & 2 Project Village Bada Pind,Tehsil & District Rupnagar
Estimate San. No. 15089/D.B. Dated 31-08-2026 for Rs. 1315726/-
A. Crarte Wire Structure/Retaining Wall No. 1 (Scheme - PMKSY WDC 2.0)
2.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 120 Per Cum 37
2.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 958.5 Per Cum 187
2.03 Spreading of wire crates as per PWD specifications CSR 23.37 958.5 Per Cum 70
2.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 270 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
B. Crarte Wire Structure/Retaining Wall No. 2 (Scheme - PMKSY WDC 2.0)
2.05 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 120 Per Cum 37
2.06 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 958.5 Per Cum 187
2.07 Spreading of wire crates as per PWD specifications CSR 23.37 958.5 Per Cum 70
2.08 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 270 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
GRAND TOTAL OF CWS/Rt. Wall NO. 1 & 2
Final Sanctioned Amount
3 For Construction of Crate Wire/Silt Retention Structure Project Village Bada Pind,Tehsil & District Rupnagar
Estimate San.No. 2352/D.B. Dated 17-08-2026 for Rs. 695508/-
Crate Wire/Silt Retention Structure (Scheme - PMKSY WDC 2.0)
3.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 75 Per Cum 37
3.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 929 Per Cum 187
3.03 Spreading of wire crates as per PWD specifications CSR 23.37 929 Per Cum 70
3.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 302.5 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
Final Sanctioned Amount
4 For Construction of Crate Wire Structure/Retaining Wall Village Saho Majra Tehsil & District Rupnagar
Estimate San.No. 2435/D.B. Dated 19-08-2026 for Rs. 141952 /-
Crate Wire Structure/Retaining Wall (Scheme - PMKSY WDC 2.0)
4.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 30 Per Cum 37
4.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 237.25 Per Cum 187
4.03 Spreading of wire crates as per PWD specifications CSR 23.37 237.25 Per Cum 70
4.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 52.5 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
Final Sanctioned Amount
S.No. Item of Work Qty. Unit Rate Total
5 For Construction of Crate Wire Structures/Retaining Walls No.1 & 2 Project Village Sarsa Nangal,Tehsil & District Rupnagar
Estimate San.No. 15092/D.B. Dated 31-08-2026 for Rs. 1184017 /-
A. Crarte Wire Structure/Retaining Wall No. 1 (Scheme - PMKSY WDC 2.0)
5.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 108 Per Cum 37
5.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 891.48 Per Cum 187
5.03 Spreading of wire crates as per PWD specifications CSR 23.37 891.48 Per Cum 70
5.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 237.6 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
B. Crarte Wire Structure/Retaining Wall No. 2 (Scheme - PMKSY WDC 2.0)
5.05 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 108 Per Cum 37
5.06 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 891.48 Per Cum 187
5.07 Spreading of wire crates as per PWD specifications CSR 23.37 891.48 Per Cum 70
5.08 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 237.6 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
GRAND TOTAL OF CWS/Rt. Wall NO. 1 & 2
Final Sanctioned Amount 6
6 For Construction of Field Drop Structures ,Crate Wire Structures Village Bheora ,Tehsil & District Rupnagar
Estimate San.No. 13957 Dated 12-08-2026 for Rs. 1654000/-
CRATE WIRE STRUCTURE-4
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 100 Per Cum 37
Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 634 Per Sqm 187
Spreading of wire crates as per PWD specifications CSR 23.37 634 Per Sqm 70
Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 240 Per Cum 1384
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-1
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 4.644 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.57 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.36 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 3.84 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 3.33 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 9.46 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-2
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.46 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.9 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.7 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 6.25 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 7.3 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 17.76 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-3
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.46 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.9 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.7 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 6.25 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 7.3 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 17.76 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-4
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.46 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.9 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.7 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 6.25 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 7.3 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 17.76 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-5
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.46 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.9 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.7 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 6.25 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 7.3 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 17.76 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-6
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 11.86 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.28 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.8 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 9.86 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 13.46 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 25.27 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-8
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 11.86 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.28 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.8 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 9.86 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 13.46 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 25.27 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-9
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 11.86 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.28 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.8 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 9.86 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 13.46 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 25.27 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-10
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 11.86 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.28 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.8 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 9.86 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 13.46 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 25.27 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-7
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 9.25 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.07 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.7 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 8.09 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 9.3 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 21.04 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
Total Amount (Say) 1654000
7 For Construction of Field Drop Structures 12 to 18 Project Village Harnampur i ,Tehsil & District Rupnagar
Estimate San.No. 15623 Dated 08-09-2026 for Rs. 8,89,000/-
FIELD DROP STRUCTURE-12
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 6.722 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.75 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.54 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 5.77 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 5.07 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 14.33 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-13
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 13.96 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.37 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.95 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 10.96 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 16.53 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 28.54 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-17
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 13.96 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.37 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.95 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 10.96 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 16.53 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 28.54 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
FIELD DROP STRUCTURE-14,15,16and 18
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 9.36 Per Cum 37
C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.04 Per Cum 3259
C. Conc. (bajri) in 1:2:4 CSR 23.37 0.77 Per Cum 4802
Sq rubble masonary in 1:5 in foundation CSR 12.17 8.01 Per Cum 5318
Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 9.55 Per Cum 5780
12.5 mm thick cement sand plaster in 1:4 CSR 15.9 20.8 Per Sqm 202.7
GST DIFFERNCE 12% TO 18% @5.35%
Total for 4 Structures 461200
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
StandardDNIT020.pdf
Tender Documents • 0.49 MB
dnit20.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .