| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.6 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹67.8 L+₹15,375.20 (0.23%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | GOWTHAM CONSTRUCTIONS L2 | Hanura Construction L1 |
|---|---|---|---|---|---|
| 1.00CC road | |||||
| 1.10 | Dismantling the PCC concrete and Clearing away from site etc completed | 90 | m3 | 464.1 ₹41,769 Lowest | 464.7 ₹41,823 |
| 1.20 | Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply Pipes. The Rate inclusive of all charges such as Earth work and remove the same 2Km away from the site etc, complete as per standard specifications. | 216 | m3 | 118.15 ₹25,520.4 Lowest | 118.15 ₹25,520.4 Lowest |
| 1.30 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift | 97 | m3 | 176.48 ₹17,118.56 Lowest | 176.48 ₹17,118.56 Lowest |
| 1.40 | Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over(silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | 708 | m2 | 460 ₹3,25,680 | 441.1 ₹3,12,298.8 Lowest |
| 1.50 | Plain cement concrete 1:4:8 mix (One cement four CS sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 512 | m3 | 4,953.2 ₹25,36,038.4 | 4,949.2 ₹25,33,990.4 Lowest |
| 1.60 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 537 | m3 | 6,961.33 ₹37,38,234.21 Lowest | 6,961.33 ₹37,38,234.21 Lowest |
| 1.70 | Providing and fixing Bitumen Pad for Expansion Joint in Between Pavement Slabs to 12mm Thick and fixed as shown in the drawing including cost and conveyence of expansion Joints including shalimar pad and joint sealent etc., complete as per standard specification | 99 | m2 | 485 ₹48,015 Lowest | 485 ₹48,015 Lowest |
| 1.80 | Plastering with cement mortar 1:3 mix, 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications | 82 | m2 | 545.51 ₹44,731.82 Lowest | 545.51 ₹44,731.82 Lowest |
Tender Value
₹81.3 L
EMD Value
₹81,270
Closing Date
7 Aug 2023, 3:00 pmClosed
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Muncipal Corporation, Fort Main Road, Salem
Providing CC Lane arrangements at in Division No. 2,19,28 of Suramangalam Zone Package - 5
2023_MAWS_346137_1
E4/EST NO.29/R/2023-2024
Open Tender
Civil Works
Lump-sum
60 days
SALEM CITY MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹81,270
Yes
12 Oct 2026
19 Jul 2023
7 Aug 2023
19 Jul 2023
7 Aug 2023
19 Jul 2023
Amount
CC road
Dismantling the PCC concrete and Clearing away from site etc completed
Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply Pipes. The Rate inclusive of all charges such as Earth work and remove the same 2Km away from the site etc, complete as per standard specifications.
Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over(silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification
Plain cement concrete 1:4:8 mix (One cement four CS sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Providing and fixing Bitumen Pad for Expansion Joint in Between Pavement Slabs to 12mm Thick and fixed as shown in the drawing including cost and conveyence of expansion Joints including shalimar pad and joint sealent etc., complete as per standard specification
Plastering with cement mortar 1:3 mix, 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications
GOWTHAM CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .