Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | ₹7.1 L | L1 | Accepted-AOC Aoc Issue |
| 2 | L2₹7.1 LSame as L1Rejected-Finance | ₹7.1 LSame as L1 | L2 | Rejected-Finance Not selected in lottery |
| 3 | L2₹7.1 LSame as L1Rejected-Finance | ₹7.1 LSame as L1 | L2 | Rejected-Finance Not selected in lottery |
| 4 | L2₹7.1 LSame as L1Rejected-Finance | ₹7.1 LSame as L1 | L2 | Rejected-Finance Not selected in lottery |
| 5 | L2₹7.1 LSame as L1Rejected-Finance 12 36 126 A GWALTOLI KANPUR | ₹7.1 LSame as L1 | L2 | Rejected-Finance Not selected in lottery |
Tender Value
₹8.3 L
EMD Value
₹83,075
Closing Date
20 May 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Construction work of road by C.C. from 12/538 Khushiram Mishra house to Shani Electronic under Khalasi line Gwaltoli ward-04 zone -4.
2026_NNKAN_1146566_1
14/AA-4/26-27
Open Tender
Civil Works
Percentage
45 days
Ward-04
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹83,075
24 Jul 2026
19 May 2026
20 May 2026
19 May 2026
20 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/e within a distance of 60mtr. | 436.5 | sqm | 67 | ₹29,245.5 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m to 3.00 m, as directed by Engineer-in-Charge: 2.1.1 All kinds of soil | 22.2 | cum | 170 | ₹3,774 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:4:8 (1 Cement: 4 coarse sand (zome-111): 8graded stone aggregate 20mm nominal size) | 7.1 | cum | 5,740 | ₹40,754 |
| 4 | Providing & laying precast cement concrete kerb stone drain etc all complet | 80 | rmt | 458 | ₹36,640 |
| 5 | Brick work with common burnt clay (non modular) bricks of class-150 In foundation and plinth in:Cement mortar 1:4 (1 cement: 4 coarse sand) | 7.36 | cum | 6,600 | ₹48,576 |
| 6 | 12 mm cement plaster of mix: 1:4 (1 cement: 4 coarse sand) | 84.8 | sqm | 200 | ₹16,960 |
| 7 | Cosntruction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with morior grader on prepared surface, mixing by mixin place method with rotemator at OMC and compacting with viberatory roller to achieve the desired density as per clause. | 34.92 | cum | 3,671 | ₹1,28,191.32 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level1:1.5:3 (1 Cement: 1.5 coarse sand (zone-111): 3 graded stone aggregate 20mm nominal size) | 43.65 | cum | 7,160 | ₹3,12,534 |
| 9 | Additional for non mettaie c.c. surface hardner etc all complete. | 436.5 | sqm | 96.25 | ₹42,013.13 |
| 10 | Raising manhole by dismantling & refixing of manhole cover & frame mcluding dumantling C.C and C.C. work in 1:2:4 but excluding brick work which taken separately and all completion of work | 4 | nos | 704 | ₹2,816 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2144305.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.66 MB
BOQ_2144305.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .