Loading
Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
6 Sept 2022, 3:00 pmClosed
12750-SOUTH ZONE - LPG
Supply and installation of Battery Bank at SBS
GEM/2022/B/2460611
GEM/2022/B/2460611
Open Tender
Surajpur, Chhattisgarh
₹0
₹50,000
6 Sept 2022
24 Aug 2022
6 Sept 2022
6 Sept 2022
23 Aug 2022 - 6 Sept 2022
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Supply Battery | Supply Battery — 1. THE JOB IS TO BE CONDUCTED BY REMOVING BATTERY BANKS ONE BY ONE SO THAT BATTERY BACK-UP IS AVAILABLE FOR CONNECTED LOAD AT ANY POINT OF TIME DURING EXECUTION OF JOB.INSTALLATION AND COMMISSIONING OF BATTERY BANKS INCLUDING FOLLOWING JOBS IN GENERAL BUT NOT LIMITED TO FOLLOWING:-I. DISCONNECTING BATTERY BANK-1 FROM CONNECTED LOAD.II. DISCONNECTING BATTERY BANK-1 FROM BATTERY CHARGER.III. STACKING CELLS OF DISCONNECTED BATTERY BANK-1 AT SPECIFIED LOCATION IDENTIFIED BY EIC.IV. REMOVAL OF OLD BATTERY STAND FROM BATTERY ROOM.V. INSTALLATION OF NEWLY SUPPLIED BATTERY STAND.VI. FIXING OF NEWLY SUPPLIED CELLS TO FORM A NEW BATTERY BANK-1 OF 1000AH 48V CAPACITY OF 24 CELLS ON NEW BATTERY STAND.VII. CONDUCTING CHARGING-DISCHARGING AND OTHER COMMISSIONING TESTS FOR BATTERY BANK-1 AS PER TECHNICAL SPECIFICATIONS.VIII. CONDUCTING LOAD TESTS OF BATTERY BANK-1.IX. CONNECTING BATTERY BANK-1TO BATTERY CHARGER.X. CONNECTING BATTERY BANK-1TO ACTUAL LOAD.XL. ONCE NEW BATTERY BANK-1 IS SUCCESSFULLY COMMISSIONED ON ACTUAL LOAD AND IS CAPABLE OF GIVING CONSISTENT BATTERY BACK-UP, SIMILAR STEPS TO BE PERFORMED FOR BATTERY BANK-2. Please don't consider the above system generated item in Bold Letters .Kindly consider the following detailed item description.Scope of Job includes Supply of 96V Battery bank of 8 No. 12V each, 200 AH ,VRLA Type batteries one each at SV-11 & SV-13 & meeting technical specifications as per Attachment-I,II & III.(THESE BATTERIES WILL BE USED FOR SOLAR APPLICATION) | - | Each |
| 2 | Supply Battery | Supply Battery — 1. THE JOB IS TO BE CONDUCTED BY REMOVING BATTERY BANKS ONE BY ONE SO THAT BATTERY BACK-UP IS AVAILABLE FOR CONNECTED LOAD AT ANY POINT OF TIME DURING EXECUTION OF JOB.INSTALLATION AND COMMISSIONING OF BATTERY BANKS INCLUDING FOLLOWING JOBS IN GENERAL BUT NOT LIMITED TO FOLLOWING:-I. DISCONNECTING BATTERY BANK-1 FROM CONNECTED LOAD.II. DISCONNECTING BATTERY BANK-1 FROM BATTERY CHARGER.III. STACKING CELLS OF DISCONNECTED BATTERY BANK-1 AT SPECIFIED LOCATION IDENTIFIED BY EIC.IV. REMOVAL OF OLD BATTERY STAND FROM BATTERY ROOM.V. INSTALLATION OF NEWLY SUPPLIED BATTERY STAND.VI. FIXING OF NEWLY SUPPLIED CELLS TO FORM A NEW BATTERY BANK-1 OF 1000AH 48V CAPACITY OF 24 CELLS ON NEW BATTERY STAND.VII. CONDUCTING CHARGING-DISCHARGING AND OTHER COMMISSIONING TESTS FOR BATTERY BANK-1 AS PER TECHNICAL SPECIFICATIONS.VIII. CONDUCTING LOAD TESTS OF BATTERY BANK-1.IX. CONNECTING BATTERY BANK-1TO BATTERY CHARGER.X. CONNECTING BATTERY BANK-1TO ACTUAL LOAD.XL. ONCE NEW BATTERY BANK-1 IS SUCCESSFULLY COMMISSIONED ON ACTUAL LOAD AND IS CAPABLE OF GIVING CONSISTENT BATTERY BACK-UP, SIMILAR STEPS TO BE PERFORMED FOR BATTERY BANK-2. Please don't consider the above system generated item in Bold Letters .Kindly consider the following detailed item description.Scope of Job includes Supply of 110V Battery Bank of 55 No. Batteries, 2 V each, 300 AH ,Lead Acid Tubular Type at Suryapet Booster Station meeting technical specifications as per Attachment-I,II & III | - | Each |
| 3 | Supply Battery Bank@SBS(48V) | Supply Battery Bank@SBS(48V) — 1. THE JOB IS TO BE CONDUCTED BY REMOVING BATTERY BANKS ONE BY ONE SO THAT BATTERY BACK-UP IS AVAILABLE FOR CONNECTED LOAD AT ANY POINT OF TIME DURING EXECUTION OF JOB.INSTALLATION AND COMMISSIONING OF BATTERY BANKS INCLUDING FOLLOWING JOBS IN GENERAL BUT NOT LIMITED TO FOLLOWING:-I. DISCONNECTING BATTERY BANK-1 FROM CONNECTED LOAD.II. DISCONNECTING BATTERY BANK-1 FROM BATTERY CHARGER.III. STACKING CELLS OF DISCONNECTED BATTERY BANK-1 AT SPECIFIED LOCATION IDENTIFIED BY EIC.IV. REMOVAL OF OLD BATTERY STAND FROM BATTERY ROOM.V. INSTALLATION OF NEWLY SUPPLIED BATTERY STAND.VI. FIXING OF NEWLY SUPPLIED CELLS TO FORM A NEW BATTERY BANK-1 OF 1000AH 48V CAPACITY OF 24 CELLS ON NEW BATTERY STAND.VII. CONDUCTING CHARGING-DISCHARGING AND OTHER COMMISSIONING TESTS FOR BATTERY BANK-1 AS PER TECHNICAL SPECIFICATIONS.VIII. CONDUCTING LOAD TESTS OF BATTERY BANK-1.IX. CONNECTING BATTERY BANK-1TO BATTERY CHARGER.X. CONNECTING BATTERY BANK-1TO ACTUAL LOAD.XL. ONCE NEW BATTERY BANK-1 IS SUCCESSFULLY COMMISSIONED ON ACTUAL LOAD AND IS CAPABLE OF GIVING CONSISTENT BATTERY BACK-UP, SIMILAR STEPS TO BE PERFORMED FOR BATTERY BANK-2. Please don't consider the above system generated item in Bold Letters .Kindly consider the following detailed item description.Scope of Job includes Supply of 48V Battery Bank of 24 No. Batteries, 2V each, 800 AH , Lead Acid Tubular Type at Suryapet Booster Station meeting technical specifications as per Attachment-I,II & III | - | Each |
| 4 | Inst.C-10 Test Battery@SV11,13 11984-VvSPL SURYAPET | Inst.C-10 Test Battery@SV11,13 11984-VvSPL SURYAPET — 1. THE JOB IS TO BE CONDUCTED BY REMOVING BATTERY BANKS ONE BY ONE SO THAT BATTERY BACK-UP IS AVAILABLE FOR CONNECTED LOAD AT ANY POINT OF TIME DURING EXECUTION OF JOB.INSTALLATION AND COMMISSIONING OF BATTERY BANKS INCLUDING FOLLOWING JOBS IN GENERAL BUT NOT LIMITED TO FOLLOWING:-I. DISCONNECTING BATTERY BANK-1 FROM CONNECTED LOAD.II. DISCONNECTING BATTERY BANK-1 FROM BATTERY CHARGER.III. STACKING CELLS OF DISCONNECTED BATTERY BANK-1 AT SPECIFIED LOCATION IDENTIFIED BY EIC.IV. REMOVAL OF OLD BATTERY STAND FROM BATTERY ROOM.V. INSTALLATION OF NEWLY SUPPLIED BATTERY STAND.VI. FIXING OF NEWLY SUPPLIED CELLS TO FORM A NEW BATTERY BANK-1 OF 1000AH 48V CAPACITY OF 24 CELLS ON NEW BATTERY STAND.VII. CONDUCTING CHARGING-DISCHARGING AND OTHER COMMISSIONING TESTS FOR BATTERY BANK-1 AS PER TECHNICAL SPECIFICATIONS.VIII. CONDUCTING LOAD TESTS OF BATTERY BANK-1.IX. CONNECTING BATTERY BANK-1TO BATTERY CHARGER.X. CONNECTING BATTERY BANK-1TO ACTUAL LOAD.XL. ONCE NEW BATTERY BANK-1 IS SUCCESSFULLY COMMISSIONED ON ACTUAL LOAD AND IS CAPABLE OF GIVING CONSISTENT BATTERY BACK-UP, SIMILAR STEPS TO BE PERFORMED FOR BATTERY BANK-2. Please don't consider the above system generated item in Bold Letters .Kindly consider the following detailed item description.Scope of Job includes Installation, Commissioning and C-10 Load Testing of supplied battery bank(Item No:1) of 96V Battery bank of 8 No. 12V each Batteries, 200 AH ,VRLA Type at SV-11, SV-13 | - | Each |
| 5 | Inst.C-10 TestBattery@SBS(110) 11984-VvSPL SURYAPET | Inst.C-10 TestBattery@SBS(110) 11984-VvSPL SURYAPET — 1. THE JOB IS TO BE CONDUCTED BY REMOVING BATTERY BANKS ONE BY ONE SO THAT BATTERY BACK-UP IS AVAILABLE FOR CONNECTED LOAD AT ANY POINT OF TIME DURING EXECUTION OF JOB.INSTALLATION AND COMMISSIONING OF BATTERY BANKS INCLUDING FOLLOWING JOBS IN GENERAL BUT NOT LIMITED TO FOLLOWING:-I. DISCONNECTING BATTERY BANK-1 FROM CONNECTED LOAD.II. DISCONNECTING BATTERY BANK-1 FROM BATTERY CHARGER.III. STACKING CELLS OF DISCONNECTED BATTERY BANK-1 AT SPECIFIED LOCATION IDENTIFIED BY EIC.IV. REMOVAL OF OLD BATTERY STAND FROM BATTERY ROOM.V. INSTALLATION OF NEWLY SUPPLIED BATTERY STAND.VI. FIXING OF NEWLY SUPPLIED CELLS TO FORM A NEW BATTERY BANK-1 OF 1000AH 48V CAPACITY OF 24 CELLS ON NEW BATTERY STAND.VII. CONDUCTING CHARGING-DISCHARGING AND OTHER COMMISSIONING TESTS FOR BATTERY BANK-1 AS PER TECHNICAL SPECIFICATIONS.VIII. CONDUCTING LOAD TESTS OF BATTERY BANK-1.IX. CONNECTING BATTERY BANK-1TO BATTERY CHARGER.X. CONNECTING BATTERY BANK-1TO ACTUAL LOAD.XL. ONCE NEW BATTERY BANK-1 IS SUCCESSFULLY COMMISSIONED ON ACTUAL LOAD AND IS CAPABLE OF GIVING CONSISTENT BATTERY BACK-UP, SIMILAR STEPS TO BE PERFORMED FOR BATTERY BANK-2. Please don't consider the above system generated item in Bold Letters .Kindly consider the following detailed item description.Scope of Job inlcudes Installation, Commissioning & C-10 Load Testing of supplied battery bank(Item No:2) of 110V Battery Bank of 55 No. Batteries, 2 V each, 300 AH ,Lead Acid Tubular Type. | - | Each |
| 6 | Inst.C-10 TestBattery@SBS(48V) 11984-VvSPL SURYAPET | Inst.C-10 TestBattery@SBS(48V) 11984-VvSPL SURYAPET — 1. THE JOB IS TO BE CONDUCTED BY REMOVING BATTERY BANKS ONE BY ONE SO THAT BATTERY BACK-UP IS AVAILABLE FOR CONNECTED LOAD AT ANY POINT OF TIME DURING EXECUTION OF JOB.INSTALLATION AND COMMISSIONING OF BATTERY BANKS INCLUDING FOLLOWING JOBS IN GENERAL BUT NOT LIMITED TO FOLLOWING:-I. DISCONNECTING BATTERY BANK-1 FROM CONNECTED LOAD.II. DISCONNECTING BATTERY BANK-1 FROM BATTERY CHARGER.III. STACKING CELLS OF DISCONNECTED BATTERY BANK-1 AT SPECIFIED LOCATION IDENTIFIED BY EIC.IV. REMOVAL OF OLD BATTERY STAND FROM BATTERY ROOM.V. INSTALLATION OF NEWLY SUPPLIED BATTERY STAND.VI. FIXING OF NEWLY SUPPLIED CELLS TO FORM A NEW BATTERY BANK-1 OF 1000AH 48V CAPACITY OF 24 CELLS ON NEW BATTERY STAND.VII. CONDUCTING CHARGING-DISCHARGING AND OTHER COMMISSIONING TESTS FOR BATTERY BANK-1 AS PER TECHNICAL SPECIFICATIONS.VIII. CONDUCTING LOAD TESTS OF BATTERY BANK-1.IX. CONNECTING BATTERY BANK-1TO BATTERY CHARGER.X. CONNECTING BATTERY BANK-1TO ACTUAL LOAD.XL. ONCE NEW BATTERY BANK-1 IS SUCCESSFULLY COMMISSIONED ON ACTUAL LOAD AND IS CAPABLE OF GIVING CONSISTENT BATTERY BACK-UP, SIMILAR STEPS TO BE PERFORMED FOR BATTERY BANK-2. Please don't consider the above system generated item in Bold Letters .Kindly consider the following detailed item description.Scope of Job includes Installation, Commissioning & C-10 Load Testing of supplied battery bank(Item No:3) of 48V Battery Bank of 24 No. Batteries, 2V each, 800 AH , Lead Acid Tubular Type | - | Each |
| 7 | C-10 Discharge Test@SV11,13 | C-10 Discharge Test@SV11,13 — 1. THE JOB IS TO BE CONDUCTED BY REMOVING BATTERY BANKS ONE BY ONE SO THAT BATTERY BACK-UP IS AVAILABLE FOR CONNECTED LOAD AT ANY POINT OF TIME DURING EXECUTION OF JOB.INSTALLATION AND COMMISSIONING OF BATTERY BANKS INCLUDING FOLLOWING JOBS IN GENERAL BUT NOT LIMITED TO FOLLOWING:-I. DISCONNECTING BATTERY BANK-1 FROM CONNECTED LOAD.II. DISCONNECTING BATTERY BANK-1 FROM BATTERY CHARGER.III. STACKING CELLS OF DISCONNECTED BATTERY BANK-1 AT SPECIFIED LOCATION IDENTIFIED BY EIC.IV. REMOVAL OF OLD BATTERY STAND FROM BATTERY ROOM.V. INSTALLATION OF NEWLY SUPPLIED BATTERY STAND.VI. FIXING OF NEWLY SUPPLIED CELLS TO FORM A NEW BATTERY BANK-1 OF 1000AH 48V CAPACITY OF 24 CELLS ON NEW BATTERY STAND.VII. CONDUCTING CHARGING-DISCHARGING AND OTHER COMMISSIONING TESTS FOR BATTERY BANK-1 AS PER TECHNICAL SPECIFICATIONS.VIII. CONDUCTING LOAD TESTS OF BATTERY BANK-1.IX. CONNECTING BATTERY BANK-1TO BATTERY CHARGER.X. CONNECTING BATTERY BANK-1TO ACTUAL LOAD.XL. ONCE NEW BATTERY BANK-1 IS SUCCESSFULLY COMMISSIONED ON ACTUAL LOAD AND IS CAPABLE OF GIVING CONSISTENT BATTERY BACK-UP, SIMILAR STEPS TO BE PERFORMED FOR BATTERY BANK-2. Please don't consider the above system generated item in Bold Letters .Kindly consider the following detailed item description.Scope of job includes Carrying Out C-10 Load Test/ discharge test of above installed 96V battery bank (Item No:1) of 8No. 12V each, 200 AH ,VRLA Type at SV-11, SV-13 for one time after completion of one year of successful installation. | - | Each |
| 8 | C-10 Discharge | C-10 Discharge — 1. THE JOB IS TO BE CONDUCTED BY REMOVING BATTERY BANKS ONE BY ONE SO THAT BATTERY BACK-UP IS AVAILABLE FOR CONNECTED LOAD AT ANY POINT OF TIME DURING EXECUTION OF JOB.INSTALLATION AND COMMISSIONING OF BATTERY BANKS INCLUDING FOLLOWING JOBS IN GENERAL BUT NOT LIMITED TO FOLLOWING:-I. DISCONNECTING BATTERY BANK-1 FROM CONNECTED LOAD.II. DISCONNECTING BATTERY BANK-1 FROM BATTERY CHARGER.III. STACKING CELLS OF DISCONNECTED BATTERY BANK-1 AT SPECIFIED LOCATION IDENTIFIED BY EIC.IV. REMOVAL OF OLD BATTERY STAND FROM BATTERY ROOM.V. INSTALLATION OF NEWLY SUPPLIED BATTERY STAND.VI. FIXING OF NEWLY SUPPLIED CELLS TO FORM A NEW BATTERY BANK-1 OF 1000AH 48V CAPACITY OF 24 CELLS ON NEW BATTERY STAND.VII. CONDUCTING CHARGING-DISCHARGING AND OTHER COMMISSIONING TESTS FOR BATTERY BANK-1 AS PER TECHNICAL SPECIFICATIONS.VIII. CONDUCTING LOAD TESTS OF BATTERY BANK-1.IX. CONNECTING BATTERY BANK-1TO BATTERY CHARGER.X. CONNECTING BATTERY BANK-1TO ACTUAL LOAD.XL. ONCE NEW BATTERY BANK-1 IS SUCCESSFULLY COMMISSIONED ON ACTUAL LOAD AND IS CAPABLE OF GIVING CONSISTENT BATTERY BACK-UP, SIMILAR STEPS TO BE PERFORMED FOR BATTERY BANK-2. Please don't consider the above system generated item in Bold Letters .Kindly consider the following detailed item description.Scope of Job includes Carrying Out C-10 Load Test/ discharge test of above installed 110V battery bank (Item No:2) of 110V Battery Bank of 55 No. Batteries, 2 V each, 300 AH ,Lead Acid Tubular Type for one time after completion of one year of successful installation. | - | Each |
| 9 | C-10 Discharge Test@SBS(48V) 11984-VvSPL SURYAPET | C-10 Discharge Test@SBS(48V) 11984-VvSPL SURYAPET — 1. THE JOB IS TO BE CONDUCTED BY REMOVING BATTERY BANKS ONE BY ONE SO THAT BATTERY BACK-UP IS AVAILABLE FOR CONNECTED LOAD AT ANY POINT OF TIME DURING EXECUTION OF JOB.INSTALLATION AND COMMISSIONING OF BATTERY BANKS INCLUDING FOLLOWING JOBS IN GENERAL BUT NOT LIMITED TO FOLLOWING:-I. DISCONNECTING BATTERY BANK-1 FROM CONNECTED LOAD.II. DISCONNECTING BATTERY BANK-1 FROM BATTERY CHARGER.III. STACKING CELLS OF DISCONNECTED BATTERY BANK-1 AT SPECIFIED LOCATION IDENTIFIED BY EIC.IV. REMOVAL OF OLD BATTERY STAND FROM BATTERY ROOM.V. INSTALLATION OF NEWLY SUPPLIED BATTERY STAND.VI. FIXING OF NEWLY SUPPLIED CELLS TO FORM A NEW BATTERY BANK-1 OF 1000AH 48V CAPACITY OF 24 CELLS ON NEW BATTERY STAND.VII. CONDUCTING CHARGING-DISCHARGING AND OTHER COMMISSIONING TESTS FOR BATTERY BANK-1 AS PER TECHNICAL SPECIFICATIONS.VIII. CONDUCTING LOAD TESTS OF BATTERY BANK-1.IX. CONNECTING BATTERY BANK-1TO BATTERY CHARGER.X. CONNECTING BATTERY BANK-1TO ACTUAL LOAD.XL. ONCE NEW BATTERY BANK-1 IS SUCCESSFULLY COMMISSIONED ON ACTUAL LOAD AND IS CAPABLE OF GIVING CONSISTENT BATTERY BACK-UP, SIMILAR STEPS TO BE PERFORMED FOR BATTERY BANK-2. Please don't consider the above system generated item in Bold Letters .Kindly consider the following detailed item description.Scope of Job includes Carrying Out C-10 Load Test/ discharge test of above installed 48V battery bank(Item No:3) of 48V Battery Bank of 24 No. Batteries, 2V each, 800 AH , Lead Acid Tubular Type for one time after completion of one year of successful installation. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
22000045-HB-11986.pdf
TENDER_DOCUMENT • 18.56 MB
112260.pdf
TENDER_DOCUMENT • 0.09 MB
Download all tender documents and submit your bid