| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 1202 SAI PROVISO DHANISHTA PLOT 72 73 SECTOR 20 KOPER KHAIRANE NAVI MUMBAI THANE MAHARASHTRA 400709 | THANE | MAHARASHTRA | 400709 | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
20 May 2026, 6:00 pmClosed
Managing Director
Maha Mumbai Metro Operation Corporation Limited., NaMTTRI Building, Adjoining MMRDA New Administrative Building, Bandra Kurla Complex, Bandra E, Mumbai 400051
Providing, fabricating and installation of Roof gutters by removing existing roof gutters of Mumbai Monorails Stations
2026_MMRDA_1296105_1
MMMOCL-15012(15)/26/2025-CIVIL
Open Tender
Civil Works
Item Rate
180 days
As per RFP
As per RFP
7 documents required · 7 mandatory
₹1,180
₹2.4 L
MMMOCL, BKC
21 May 2026
20 Apr 2026
21 May 2026
20 Apr 2026
20 May 2026
20 Apr 2026
20 Apr 2026 - 2 May 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing, fabricating & installation of Roof gutters by removing existing roof gutters of Mumbai Monorail's Stations. | |||||
| 1.01 | Dismantling and removal of existing Galvanized Iron (GI) roof rainwater gutter and connected rainwater downpipes, installed at a height of approximately 20 to 25 meters from ground level including all associated accessories such as fittings, bends, tees, clamps, brackets, fasteners, support hangers, and downpipe connections. The work includes safe dismantling, lowering, and disposal of materials as directed by the Engineer-in-Charge.
AND
Supply, Providing, Fabricating and Erecting Hot Dipped Galvanised "Rain Water Gutters' using 3.15 mm thick mild sheets including all accessories, connections sleeves for connecting rain water pipes to Gutters placed at roof along all valleys of Buildings including site seal welding at all Joints to make water tight. Thickness of galvanized coating shall not be less than 50 microns, etc. Size of Gutter 300+350+400=1050mm (ANNEXURE-A)
Note:- The rate shall includes;
1. All material required, labour, tools, equipment, and compliance with all applicable safety norms.
2. Manlifter for working at required height with safe working load of men & material.
3. Rate includes all the necessary coordination of traffic & civic authorities shall be done by contractor.
4. Civil Engineer and 4 traffic warden shall be provided during the course of work by considering the safety of existing running road traffic & Monorail services.
5. Work shall be carried out during Non-revenue hours of Monorail and minimum vehicular traffic moment i.e. night shift 12:15 AM to 4:00 AM. | - | RMT | - | - |
| 2Providing and fixing SWR uPVC pipes , 6kg/sq.cm. rating, as per lS:4985, including all fittings e.g. bends, junctions, Tees etc. jointing with solvent cement , including fixing the pipe on to the Pier / Pier Cap by drilling / fixing fasteners providing clamps etc. Note:-The Rate Includes 1) All material required, Labour , tools,equipment and compliance with all safety norms. 2) Manlifter for working at required height with safe working load of men & material. | |||||
| 2.01 | 200MM dia pipe | - | RMT | - | - |
| 2.02 | 150MM dia pipe | - | RMT | - | - |
| 3Providing, erecting, maintaining, and dismantling of bamboo scaffolding up to a working height of 25 meters, strictly for access to roof-level areas required for the dismantling and removal of existing G.I. rainwater gutters and the installation of new roof gutters. The scaffolding shall be constructed using well-seasoned, straight, and defect-free bamboo poles, securely tied with coir rope, jute, or approved synthetic rope with proper lashing and knotting techniques to ensure structural stability. The system shall include adequate cross and diagonal bracing, ties to the building for support, access ladders, working platforms made of closely spaced bamboo or timber planks, guardrails at 1.0m height, mid-rails, and toe boards of minimum 150mm height to ensure safety. All components must comply with IS3696 Part 1 and applicable local safety regulations. The scope includes transportation of materials, erection, on-site supervision, regular maintenance, and safe dismantling after work completion. Scaffolding must be erected and inspected only by trained personnel. excluded from this scope. | |||||
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
RFP_rooff.pdf
Tender Documents • 0.92 MB
BOQ_2226786.xls
BOQ • 0.40 MB
Pricebidroofg.pdf
Additional Documents • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .