Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹13.6 LAccepted-AOC MAHAGAMA GODDA JHARKHAND INDIA 814154 | MAHAGAMA | GODDA | JHARKHAND | 814154 | ₹13.6 L Quoted ₹11.5 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹12.2 LRejected-Finance LOHANDIA BAZAR LALMATIA GODDA 814105 JHARKHAND INDIA | LALMATIA | GODDA | JHARKHAND | 814105 | ₹12.2 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹12.5 LRejected-Finance | ₹12.5 L | L-3 | Rejected-Finance L-3 |
Tender Value
₹13.6 L
EMD Value
₹17,000
Closing Date
19 Feb 2026, 6:55 pmClosed
AE(C), RJML AREA
AREA OFFICE RAJMAHAL AREA, DHANKUNDA
Construction of PCC road from Plot no-20 to 26 and near 18 and 19 at Hijukita rehab site (JB NO-69) Under Rajmahal Area.(Badru Grp.)
2026_ECL_352742_1
ECL/RJML/AGM/AE(C)/ e-Ten/25-26/494 Dt-09.02.2026
Open Tender
Civil Works - Roads
30 days
Hijukita rehab site
Please refer Tender documents.
3 documents required · 3 mandatory
₹17,000
22 Apr 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
19 Feb 2026
9 Feb 2026
9 Feb 2026 - 12 Feb 2026
Item Description/ Heading
Embankment Construction with Material Obtained from Borrow Pits. Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreadin, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300.
Plant Mix Method: Construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. Grading II Material.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived natural sources : 3 graded stone aggregate 20 mm nominal size derived natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_365535.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.10 MB
Tendernotice_2.pdf
PDF • 1.38 MB
BOQ_365535.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid