Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.7 L+₹2,249.27 (1.35%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.2 L
EMD Value
₹6,683
Closing Date
11 Aug 2026, 6:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
CONSTRUCTION OF 3 NO. XING AT DIFFERENT SPOTS AT MIRPORA ASHMUJI 1206
2026_RDPR_318414_37
e- NIT No. 38 OF REWK/UT CAPEX/PRI/2026-27 Dated 29-07-2026
Open Tender
Civil Works
Percentage
45 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EX ENGINEER REW KULGAM
₹6,683
17 Aug 2026
29 Jul 2026
13 Aug 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, ) including disposal of excavated earth upto 25 mtrs beyond 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed | 7.29 | cum | 1 | ₹7.28 |
| 2 | P / L dry stone solling handpacked in foundations and with 20% Plums including all carriages. | 14.42 | cum | - | - |
| 3 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M15 mix. (1:2:4) and by using 20 mm crushed aggregates | 8.44 | cum | - | - |
| 4 | Reinforced cement concrete work in beams, suspended floors, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3(1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.65 | cum | 1 | ₹4.65 |
| 5 | P/F of Formwork incl. centering,shuttring , Struting,propping,and removal of Same etc- Complete Job (Abutts) | 17.82 | sqm | - | - |
| 6 | Edges of slab | 13.23 | sqm | 1 | ₹13.22 |
| 7 | P/F of Formwork incl. centering,shuttring , Struting,propping,and removal of Same etc- Complete Job (sus. Floor) | 9.72 | sqm | - | - |
| 8 | P/F of steel reinforcement for R.C.C works incl. cutting,bending and placing in position - complete Job | 415 | kg | 1 | ₹414.59 |
| 9 | photograph /signboard charges(2.5X2.5)size | 1 | job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_1050255.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .