| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.4 LAccepted-Finance | L1 | Accepted-Finance FOUND OK | |
| 2 | L2₹97.5 L+₹13.1 L (15.5%)Accepted-Finance | L2 | Accepted-Finance FOUND OK | |
| 3 | Rejected-Technical | - | Rejected-Technical NOT OK |
Tender Value
Refer Docs
EMD Value
₹65,000
Closing Date
27 Sept 2023, 12:00 pmClosed
SE EDC MAINPURI
POWER HOUSE CAMPUS MAINPURI
Electricity System Strengthening work Line Construction Capacity Increase of Transformer Jarjar Line Replacement and other Electricity work on Semi Turnkey Basis in Additional Business Plan Head under Electricity Distribution Division I Mainpuri
2023_DVVNL_839903_1
EDC(M)-25/2023-23
Open Tender
Electrical Works
Lump-sum
180 days
DISTRICT MAINPURI
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹3,540
DVVNL
₹65,000
19 Oct 2023
18 Sept 2023
27 Sept 2023
18 Sept 2023
27 Sept 2023
18 Sept 2023
Amount
Carriage of following material from Centre Stores, Power House Colony Mainpuri to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends in the area of EDD-I, Mainpuri, including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.)
LT Cable Underground 3.5x150 sqmm XLPE
LT Cable Underground 3.5x240 sqmm XLPE
LT Cable Underground 3.5x400 sqmm XLPE
Alluminium Cable 1x630 sqmm & 3.5x40 Sq.mm. Cable
Armoured Service Cable 2x6 sqmm
Armoured Service Cable 4x25 sqmm
33 kv 3x300 sqmm. XLPE Cable
11 KV VCB Incomming and Outgoing
3*185 sqmm 11 kv XLPE Cable
3*300 sqmm 11 kv XLPE Cable
3*70 sqmm 11 kv XLPE Cable
PCC Pole 8.5 Mtr. Long
33 kv Vaccume Interupter
33 KV CT/PT, Fuse Set and Lightining Arrestor
Supply of the Following Material with Freight etc. charges.
2x12 Volt (C10/C12) Battery Set
Top Channel
Dropper Channel
MS Angle 75x75x6x2028 mm
Clamp with nut & bolt
MCCB 63 Amp. For Distribution Pannel
MCCB 120 Amp. For Distribution Pannel
MCCB 250 Amp. For Distribution Pannel
MCCB 400 Amp. For Distribution Pannel
Alluminium Lug 250 sqmm
Alluminium Lug 150 sqmm
Earth wire clamp with bolts and nuts
F-bracket for 11 KV
G.I. Barbed wire
GI Stip Patti for the connecting of T/F
Holding Clamps for top channel TPMO & Fuse set etc. with bolts & nuts
P G Clamp
Stone pad 300*300*75M
Installation of the 100 KVA new transformers at various 11/0.4 KV substation, under the jurisdiction of Electricity Distribution Division-I Mainpuri, in proper alignment and direction and making proper HT/LT connection as per instruction of Supervising Engineer after carriage the same from Centre Stores, Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, T&P, carrier etc required for proper completion of work.
LT Protection work through Installation of MCCB 63/120/250/400 Amp. Protection Pillar Box Suitable for 250 KVA TO 630 KVA 11/.4 KV Transformers
Increasing Capacity of Distribution Transformers at various 11/0.4 KV Substation Under Electricity Distribution Division - I Mainpuri
Safe Carriage and Installation of Distribution Transfomer 400 KVA from ESC Mainpuri to pit Site.
Safe Carriage and Installation of Distribution Transfomer 250 KVA from ESC Mainpuri to pit Site.
After Increasing of Distribution Transfomer Safe carriage of Existing transformer in vehicle at different places after opening of HT/LT connection and its safe carriage upto workshop Mainpuri and safe unloading at workshop Mainpuri.
To attend the underground 33 and 11 KV XLPE cable faults. The works are appended below A- To locate the fault with the help of departmental fault locator machine. B- To dig the pit atleast 6x2 sqft. (or as much required) to expose the damage cable for repair. C- Cut the cable from damage position. D- Fixing of suitable size jointing kit to join the ends (cable jointing kit will be provided by department) E- Re-filling of pit.
S/T SUITABLE FOR 11 KV XLPE cable of size 3x120 sqmm.
S/T SUITABLE FOR 11 KV XLPE cable of size 3x70 sqmm.
S/T SUITABLE FOR 11 KV XLPE cable of size 3x185 sqmm.
S/T SUITABLE FOR 11 KV XLPE cable of size 3x300 sqmm.
S/T SUITABLE FOR 33 KV XLPE cable of size 3x300 sqmm.
To attend breakdown in 33/11 KV XLPE cable termination ends. The works are appended below. A- To cut the minimum length of damage cable ends. B- Fixing of proper size cable termination kit (Cable termination kit will be provided by department.)
O/D SUITABLE FOR 11 KV XLPE cable of size 3x70 sqmm.
O/D SUITABLE FOR 11 KV XLPE cable of size 3x120 sqmm.
O/D SUITABLE FOR 11 KV XLPE cable of size 3x185 sqmm.
O/D SUITABLE FOR 33 KV XLPE cable of size 3x300 sqmm.
Laying of the following cable with cost of bricks and sand as per RESPO Norms.
33 KV XLPE Cable 3x300 sqmm.
11 KV XLPE 3x185 sqmm.
11 KV XLPE 3x300 sqmm.
11 KV XLPE 3x70 sqmm.
LT Cable 3.5x150 sqmm.
LT Cable 3.5x240 sqmm.
LT Cable 3.5x400 sqmm.
Erection of 8.5 meter PCC Double Pole Structure including duly grouted in cement, sand and brick ballast in ratio 1:2:4, including work of fitting of all accessories, stone pad and clamps suitable for Transfomer. Work will be carried out as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Erection of 8.5 meter PCC Single Pole including duly grouted in cement, sand and brick ballast in ratio 1:2:4, including work of fitting of all accessories, stone pad and clamps suitable for AB cable. Work will be carried out as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Erection and grouting of stays as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Chemical Earthing of Distribution T/F by GI stipp patti as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
laying of ACSR Dog conductor, HT conductor incl. carriage to centre store Mainpuri and stringing of new conductor with all accessories as per RESPO Mannual.
Road Restoration Charges for kaccha-pakka road incl. all labourer as per respo norms.
Installation of 2x12 volt (C10/C12) Battery Set with Proper Connection As required.
Installation of Vaccume Interrupter as per Norms
Installation of 33 KV CT/PT unit as per Norms.
Installation of 33 KV Fuse Set as per Norms.
Installation of 33 KV Lighthinging Arrestor as per Norms.
Reparing of 33 KV Breaker As per Requirement
Supply and Installation of 33 KV Relay As per Requirement.
Supply and Installation of 33 KV Digital Relay As per Requirement.
Reparing of 33 KV TPMO As per Norms
Installation of 11 KV VCB, with proper Connection at Various 33/11 KV Substation under EDD-I As per Norms
Installation of Different type of 11 KV CT at various Substation under EDD-I As per Norms
Reparing of 11 KV VCB As per Norms
Installation of 11 KV Different type Relay As per norms
Fixing of Disc Insulator as per Norms
Fixing of Pin Insulator as per Norms
Fixing of LT side Fuse Set as per Norms
Plinth of Transformer as per RESPO Norms
Fencing of Distribution Transformer
Fixing of Aluminium LUG 250 Sq.mm. for Distribution Transformer
Fixing of Aluminium LUG 150 Sq.mm. for Distribution Transformer
Prepairing the single phase electronic meter by fixing plastic/hologram seals and entering meter data on meter register and then marking the lab meter No. on meter cover with permanent marker pen and then cartaging the meter from the test lab to 33/11KV Substation/site of work as per direction of Supervising Engineer including the work of loading, unloading & stacking the meter at the respective ends and also including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Installation of meters by new Electronic Meter at the outside the main gate of permises of the consumer including the work of laying and proper fixing of Armoured cable from pole to meter, with 02 Nos. Hindoro Swing Anchor Fasteners 10 mm Hook each connection including the work of sealing and filling of sealing certificate properly and handing over copy of sealing certificate to consumer on same day.
M/S Sengar Enterprises
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .