Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.5 LAdmitted-Finance | -49.55% | ₹30.5 L | L1 | Admitted-Finance |
| 2 | L2₹36.3 L+₹5.8 L (18.9%)Admitted-Finance | -40.00% | ₹36.3 L+₹5.8 L (18.9%) | L2 | Admitted-Finance |
| 3 | L3₹40.9 L+₹10.4 L (34.2%)Admitted-Finance | -32.32% | ₹40.9 L+₹10.4 L (34.2%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical DISQUALIFIED |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical DISQUALIFIED |
Tender Value
₹60.5 L
EMD Value
₹1.2 L
Closing Date
21 Jul 2026, 3:00 pmClosed
EE,RMD-3,DDA
EE,RMD-3,DDA
Levelling, dressing, rolling on vacant land including cleaning of unwanted growth of grass, wild bushes and shrubs etc. by mechanical/ manual means in Sector-23, 31, 32, 33 and 38, Rohini under jurisdiction of RMD-3.
2026_DDA_917120_1
09/EE/RMD-3/DDA/2026-27
Open Tender
Civil Works
Works
300 days
ROHINI
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹1.2 L
29 Jul 2026
13 Jul 2026
22 Jul 2026
13 Jul 2026
21 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing/ uprooting of unwanted growth of vegetation i.e. grass, wild bushes and shrubs etc. by mechanical means including dumping of this unwanted growth by excavating small pits at site and filling the top of pits with excavated soil including dressing of surface all complete as per direction of Engineer- in-charge.
Note
1. The rate of item is inclusive of cost of hiring of labour, machine, operator, fuel, lubricants etc.
2. The agency shall submit clearly visible GPS photographs and video before and after of execution to clearly establish the area cleaned for which nothing extra shall be payable.
3. The rate are inclusive of all leads and lifts and all separations and nothing extra shall we paid separately.
4. Rate payable to agency shall be as per actual area cleared measured. | 0.32 | sqm | 2.6 | ₹0.84 |
| 2 | Levelling, dressing and rolling of the ground including removing vegetation and inequalities in the form of pits and embankments for all heights and depression within the DDA Land/Plot in which work need to execute. The work shall include levelling the whole ground by cutting embankments above required level and filling all depressions, ponds, marshy land below the ground level in layers not exceeding 20 cm in depth using Dozer and Hydraulic excavator (3D) and consolidating the ground by road roller of capicity 8-10 tonne for providing final ground level and disposal of excess earth/ malba, for all leads and lift within the area of work site.
All kinds of soil, malba, rubbish, garbage etc | - | sqm | 14.15 | - |
| 3 | Total = 59,72,216.95 | - | - | - | - |
| 4 | Add GST Multiplication Factor @0.973 =58,10,967.09 | - | RS | 1,61,250 | - |
| 5 | Add Cost [email protected]% = | - | RS | 2,34,181.97 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_963797.xls
BOQ • 0.28 MB
NIT09.pdf
Tender Documents • 2.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .