Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹11,250
Closing Date
30 Sept 2026, 6:55 pm3d left
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
Construction of drain from house of Shabir Gulam to Gulzar Wani and others at Arwah
2026_RDPR_324320_41
NIT_70_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
BEERWAH
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹11,250
12 Sept 2026
12 Sept 2026
1 Oct 2026
12 Sept 2026
30 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:. All kinds of soil | 32.41 | Cum | 479.3 | ₹15,534.11 |
| 2 | Providing and laying of stone soling hand packed including dressing,filing the interstices including carriage complete job | 11.5 | Cum | 1,266.21 | ₹14,561.42 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 5.79 | Cum | 5,202.9 | ₹30,124.79 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 15.43 | Cum | 5,733.6 | ₹88,469.45 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 54.6 | Sqm | 286.35 | ₹15,634.71 |
| 6 | Cement concrete flooring 1:2:4 (1Cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry but excluding cost of nosing of steps etc complete.
40 mm thick 20mm nominal size stone aggregate (crushed) | 28.8 | Sqm | 510.25 | ₹14,695.2 |
| 7 | 12mmthick cement sand plastering using 1:4 mix. | 98.28 | Sqm | 266.2 | ₹26,162.14 |
| 8 | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc:coarse Agg. 40 mmfor an average lead of 20 Km & H/Load 100 Mts | 5.21 | Cum | 409.94 | ₹2,135.79 |
| 9 | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc: coarse Agg. 20 mmfor an average lead of 20 Km & H/Load 100 Mts. | 25.5 | Cum | 409.94 | ₹10,453.47 |
| 10 | Carraige of sand by mechanical transport from source to site i/c loading unloading, taxes royalties etc: . for an average lead of 20 Km & H/Load 100 Mts. | 12.76 | Cum | 409.94 | ₹5,231.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_1093932.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .