Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
4 May 2020, 5:00 pmClosed
SE,EUDC-VII,Ciss-Gomti,LESA,
33/11 K.V. Substation,sct-5D,Vrandavan Yojna,LESA, Lucknow.
Construction work against Deposite Scheme 2019-20 in the area of Kanpur Road under jurisdiction of E.E., EUDD-Kanpur Road, LESA, Lucknow.
2020_MVVNL_463640_1
05/EUDC-VII/LESA/2020-21
Open Tender
Electrical Works
90 days
EUDD-Kanpur Road, LESA
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹3,540
A/CNo-1277784945,IFSC Code-CBIN0280140,
₹18,000
14 May 2020
28 Apr 2020
5 May 2020
28 Apr 2020
4 May 2020
28 Apr 2020
Amount
Safe Loading, Carriage & unloading of following Materials from Centre Store to Pit Site/J.E. Dump Store.
a- Line Material
b- ST Pole 11/9 Mtr. Long
c- 11 KV XLPE Cable 3x300 sq. mm.
d- 11 KV Pilfer
e- 11 KV VCB Outgoing CTR/200/100/5 Amp.
Fabrication, erection of double pole for end terminations/sectional double pole, 11 KV line on ST/PCC Pole with fixing of necessary clamps & other accessories like 1 nos top channel 100x50 mm 2.24 m. 1 No. Guarding Angle. Its grouting in ratio 1:4:8 plinthing 300 mm above ground level, earthing of support & one side cable expose.
Laying of 3X300 sq.mm 11 KV XLPE cable by drill method as per RESPO Norms. Only 11 KV XLPE cable supplied by Department.
Grouting & Nuzzling of 11 KV stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand, Brick blast & cement). All material except stay wire shall be supplied by the contractor.
Ordinary earthing by 11 KV MS earth Rod 2500mm long as per RESPO Schedule. All material except earthing wire shall be supplied by the contractor.
Cable Hosting of 11 KV 3x300 sq. mm XLPE Cable at the following including jumpering etc complete with help of GI Pipe as Per RESPO Norms. GI pipe and other required material shall be supplied by contractor.
High pressure testing of 11 KV 3x300 XLPE cable along with arrangement of High Pressure equipment.
Earthing of VCB/TF pipe type with 60 fit deep borring and providing GI pipe 1.5: dia ( 60 fit GI pipe) and GI strip 25x5mmx6 meter long attached with clamps, L piece, nut & bolts and GI pipe Cap. All material shall be supplied by the contractor.
Commissioning of 11 KV O/G FDR VCB at 33/11 KV S/S including connection with, Busbar its Empire tap, PVC tap after grouting 2 No. Channel 75x40 mm 0.90 M lag its commissioning after taking proper S/D.
Fixing of 11 KV Pilfer Resistance Meter (25/5 Amp). All material except Pilfer Resistance Metering Cubical shall be supplied by the contractor.
Supply and fixing of 11 TPMO as per RESPO Norms.
Tripod (Delta) type earthing of 33/11 KV 2x10 MVA Transformer, equipment installed at 33 KV Switchyard by boring and lowering of 03 Nos. GI Pipe of 1.5" dia A Class 25 meter deep at 03 places each to make trip pod/ Delta, 1.5 meter Jali will be provided at the bottom of GI pipe Interconnection in between the three bored pipes with MS/GI strip of size 50x6 mm with G.P. pipe clamps upto the ground level, fixing of cap & mesh on the top of the GI pipe to protect from any obstackle. Earthing of equipments will be connected with GI strip of size 50x6 mm from separate tripod / delta earthing (All material shall be supplied/arranged by the contractor).
Construction and covering of cable trench of size 300x300 mm including brick work 1:4 in wall of the trench brick ballast work in 1:5:10 on foundation plaster 12 mm thick with coarse sand 1:4 and surface finishing with cement : providing MS strip at an interval of 0.5 M & MS angle running on both the edges of trench (M.S.Strip Shall be provided by the contractor).
Opening of all connection and other accessories for old 8 MVA transformer installed at 33/11 KV Sub Station Ashiyana.
Dismantling and Safe loading/unloading and Shifting of 8 MVA Power Transformer at 33/11 KV Sub Station Ashiyana to safe place. All T & P arranged by contractor.
Welding of riser strip with earth mat and structure body.
ERRECTION & INSTALLATION OF 33/11KV,10 MVA TRANSFORMERS :- Erection and installation of 33/11kV,10 MVA transformer in a levelledposition on the plinth. The work include shifting of transformer to the site of installation within the substation premises, assembling fixing and fitting of all accessories and filling of transformer oil to the desired level and insuring that there is no leakage. All the jumpering & connection are included in the scope of work.
Fabrication and grouting of M.S Angle 75X75X6 mm in L shape & in proper size and alignment to provide support for the two separate earthing strips for power transformer neutral including supply and fixing of two nos. Flexible copper bonds for neutral earthing.
Fabrication and erection of cable support made of two pieces of M.S channel 100x50mm,3.0 Mtr.long joined to each other by means of 5 Nos. M.S Flat 50x6mm pieces of size 150mm long each by welding at equal intervals as per drawing and grouting in a block of size300x300x700mm complete with one coat of ready mixed primer and two coats of aluminium paint. This includes providing of four nose M.S clamp made of M.S flat holding the cable including nuts and bolts and fixing of XLPE Cable.
Sidhi Enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid