Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.8 LAccepted-Finance ARASAKUMAR KOVIL MELA STREET SRIVAIKUNTAM THOOTHUKUDI DISTRICT | SRIVAIKUNTAM | THOOTHUKUDI | TAMIL NADU | L1 | Accepted-Finance L1 Called for negotiation | |
| 2 | L2₹94.6 L+₹79,101 (0.84%)Accepted-Finance | L2 | Accepted-Finance L2 considerd for Evaluation | |
| 3 | L3₹97.6 L+₹3.8 L (4.09%)Accepted-Finance | L3 | Accepted-Finance L3 considerd for Evaluation | |
| 4 | L4₹1.0 Cr+₹9.8 L (10.5%)Accepted-Finance | L4 | Accepted-Finance L4 considerd for Evaluation | |
| 5 | L5₹1.0 Cr+₹11.1 L (11.8%)Accepted-Finance | L5 | Accepted-Finance L5 considerd for Evaluation |
| Sl No | Description | Qty | Unit | T.M. BUILDERS L6 | BHAVADHARANI BUILDERS L7 | PLIANT CONSTRUCTION PRIVATE LIMITED L8 | GS ASSOCIATES L4 | SPPS CONSTRUCTION INDIA PRIVATE LIMITED L3 | Ganeshgreentechnologies L5 | Yasothai L2 | A ULAGU LAKSHMANAN L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 330 | Cum | 250 ₹82,500 | 225 ₹74,250 | 215 ₹70,950 | 200 ₹66,000 | 120 ₹39,600 Lowest | 187 ₹61,710 | 212 ₹69,960 | 218 ₹71,940 |
| 2.00 | Supplying and filling in foundation, basement, etc with filling sand in layers of Nosst more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 80 | Cum | 2,000 ₹1,60,000 | 1,850 ₹1,48,000 | 1,343 ₹1,07,440 | 1,300 ₹1,04,000 | 1,560 ₹1,24,800 | 1,548.27 ₹1,23,861.6 | 1,326 ₹1,06,080 | 21 ₹1,680 Lowest |
| 3.00 | Plain Cement Concrete 1:5:10 (One Cement, five sand and ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of Nosst more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 66 | Cum | 5,500 ₹3,63,000 | 5,470 ₹3,61,020 | 4,597 ₹3,03,402 | 4,800 ₹3,16,800 | 4,650 ₹3,06,900 | 4,643.72 ₹3,06,485.52 | 4,105 ₹2,70,930 Lowest | 5,460 ₹3,60,360 |
| 4.00 | Supplying and filling of gravel by lorry in basement filling including conveyance loading and unloading charges and all other incidential charges filling laying watering and consolidation etc., complete complying with standard specifications and as directed by the Departmental Officers | 225 | Cum | 500 ₹1,12,500 | 325 ₹73,125 | 511 ₹1,14,975 | 600 ₹1,35,000 | 754 ₹1,69,650 | 275.82 ₹62,059.5 Lowest | 415 ₹93,375 | 320 ₹72,000 |
| 5.00 | Refilling with excavated earth including watering consolidation in each layer of Nosst more than 300mm depth as per standard specification.(W-0075). | 58 | Cum | 40 ₹2,320 | 45 ₹2,610 | 1,369 ₹79,402 | 100 ₹5,800 | 95 ₹5,510 | 36.42 ₹2,112.36 | 22 ₹1,276 Lowest | 40 ₹2,320 |
| 6.00Providing and laying in position, Standardised Concrete Mix M-30 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 400 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (Noss separate payment will be made by the Department for the excess usage of materials). | |||||||||||
| 6.10 | Foundation & Basement | 86 | Cum | 8,500 ₹7,31,000 | 8,000 ₹6,88,000 | 7,300 ₹6,27,800 | 7,300 ₹6,27,800 | 6,200 ₹5,33,200 Lowest | 7,754.63 ₹6,66,898.18 | 6,895 ₹5,92,970 | 9,120 ₹7,84,320 |
| 6.20 | In Ground Floor | 124 | Cum | 8,600 ₹10,66,400 | 8,000 ₹9,92,000 | 7,400 ₹9,17,600 | 7,400 ₹9,17,600 | 6,350 ₹7,87,400 Lowest | 7,864.79 ₹9,75,233.96 | 7,021 ₹8,70,604 | 9,252 ₹11,47,248 |
| 6.30 | In First Floor | 12 | Cum | 8,700 ₹1,04,400 | 8,000 ₹96,000 | 7,600 ₹91,200 | 7,500 ₹90,000 | 6,400 ₹76,800 Lowest | 8,065.99 ₹96,791.88 | 7,894 ₹94,728 | 9,489 ₹1,13,868 |
| 7.00 | Supplying, fabricating and placing in position of Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire and labour charges for cutting bending tying in position in all floors etc. complete complying with standard specification. | 295 | Qtl | 9,000 ₹26,55,000 | 8,750 ₹25,81,250 | 8,000 ₹23,60,000 | 7,900 ₹23,30,500 | 7,500 ₹22,12,500 | 7,640.09 ₹22,53,826.55 | 7,162 ₹21,12,790 Lowest | 8,980 ₹26,49,100 |
Tender Value
₹1.2 Cr
EMD Value
₹85,000
Closing Date
22 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer
Arultharum Mutharammaan Temple,Kulasekarappattinam
Proposed Construction Of Rest Hall Cum Dinning Hall for Arultharum Mutharamman Temple Sub Temple Arulmigu Chithambareswarar Temple Vacant Land at Kulasekarapattinam Tiruchendur Taluk in Tuticorin District
2026_HRCE_711915_1
15/2025-2026
Open Tender
Civil Works
Lump-sum
Kulasekarapattanam
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹85,000
Yes
22 Oct 2026
8 Oct 2026
22 Oct 2026
8 Oct 2026
22 Oct 2026
8 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 330 | Cum | 220 | ₹72,600 |
| 2 | Supplying and filling in foundation, basement, etc with filling sand in layers of Nosst more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 80 | Cum | 1,821.5 | ₹1,45,720 |
| 3 | Plain Cement Concrete 1:5:10 (One Cement, five sand and ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of Nosst more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 66 | Cum | 5,463.2 | ₹3,60,571.2 |
| 4 | Supplying and filling of gravel by lorry in basement filling including conveyance loading and unloading charges and all other incidential charges filling laying watering and consolidation etc., complete complying with standard specifications and as directed by the Departmental Officers | 225 | Cum | 324.5 | ₹73,012.5 |
| 5 | Refilling with excavated earth including watering consolidation in each layer of Nosst more than 300mm depth as per standard specification.(W-0075). | 58 | Cum | 42.85 | ₹2,485.3 |
| 6Providing and laying in position, Standardised Concrete Mix M-30 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 400 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (Noss separate payment will be made by the Department for the excess usage of materials). | |||||
| 6.1 | Foundation & Basement | 86 | Cum | 9,123.1 | ₹7,84,586.6 |
| 6.2 | In Ground Floor | 124 | Cum | 9,252.7 | ₹11,47,334.8 |
| 6.3 | In First Floor | 12 | Cum | 9,489.4 | ₹1,13,872.8 |
| 7 | Supplying, fabricating and placing in position of Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire and labour charges for cutting bending tying in position in all floors etc. complete complying with standard specification. | 295 | Qtl | 8,988.35 | ₹26,51,563.25 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_855243.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_855243.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .