Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
7 Sept 2026, 2:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
S AND T
14 conditions · 2 needing a document upload
For works amounting Rs.50 lakhs and above: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Panel Interlocking or Route Relay Interlocking or Electronic Interlocking or IBH or Automatic Signalling or LC gate Interlocking or AFTC or SSDAC or MSDAC.
9 conditions · 2 needing a document upload
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII, IX, XI, VIA, VIB, VI and Annexure-V and Annexure-V(A) of GCC-2022 respectively. These Annexures are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are requested to go through the following documents which are available in upload/View Documents in Home page of IREPS portal for works tenders before submitting the e-tender. 1.General Instruction for E-Tenders on works contract--Chapter- I 2.Special Condition-General- Chapter-II
Opening of e-tender : 1. The e-tenders will be opened online using the IREPS portal anytime after tender closing time. No representative is required to be present for opening of e-tender and taking notes of rates quoted and ranking as the complete details of rates etc. of all the bidders shall be available to the bidders through the website after the opening of the tender. 2. The earnest money cost is to be paid through online banking facilities through the online portal and by giving the other details online on website www.ireps.gov.in. Note: For more details refer to Cl: 4 & 12 of General Instruction-Chapter-I for Submission of EMD, Cost of Tender Document and opening of e- tender.
Asansol Division: Extension of Loop Lines length Over STN-JAJ Section.
47-SDSTE-ASN-2026-27~ER
47-SDSTE-ASN-2026-27
Open
Works - General
18 Months
Paschim Bardhaman, West Bengal
₹0
₹3.9 L
14 Aug 2026
14 Aug 2026
24 Aug 2026
22 items across 1 schedule · ₹9,43,320 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Supply of basic material to construct unit maintenance free earth as per RDSO Specs. No RDSO/SPN/197 Ver.1.0 or latest and conforming to RDSO Drg. No. SDO / RDSO/ E&B/001 or Latest. Necessary testing certificate of UL, IEC to be produced. It consist of following: (a) Copper bonded steel electrode of 3.0 m long, 17.2 mm dia with copper bonding thickness of minimum macrons and UL listed and marked = 1 no. Inspection: RDSO | Numbers | 40.00 | 4,720 | 1,88,800 |
| 2 | Installation of Unit Maintenance Free Earth . It includes ( i ) Digging the earth to the required depth. (ii) Insertion of electrode. (iii) Filling of earth enhancing compound (approx. 30 Kg) (iv) Provision of exothermic weld connections to copper Strip to the earth electrodes. (v) This also includes supply and fixing of CC cover 1.5 ft x 1.5 ft. 1 ft wall thickness 2 inch with cover 3- inch thickness. All material tools and fixtures required for weld will be arranged by contractor. Inspection: Consignee. | Numbers | 40.00 | 3,540 | 1,41,600 |
| 3 | Supply of 1 x 10 Sq.mm. (Red/Black/Green) multi strand copper power wire as per IS: 694:2010 or latest, 140 conductor each dia 0.30mm +/- 0.01 with insulation thickness of 1.0 mm and nominal conductor resistance of 1.91 ohms/km and test parameters as per RDSO Specn.No.IRS:S- 76/89(Amnd.3) or latest. Color of the wire which is required will be specified by the Engineer in-charge. Inspection: RDSO | Metre | 280.00 | 119 | 33,320 |
| 4 | Supply of 1 x 16 Sq.mm. (Red/Black/Green) multi strand copper power wire as per IS: 694:2010 or latest, 126 conductor each dia 0.40mm +/- 0.01 with insulation thickness of 1.0 mm and nominal conductor resistance of 1.21 ohms/km and test parameters as per RDSO Specn.No.IRS:S- 76/89(Amnd.3) or latest. Color of the wire which is required will be specified by the Engineer incharge. Inspection: RDSO | Metre | 224.00 | 131 | 29,344 |
| 5 | Supply of 1 x 35 Sq.mm. (Red/Black/Green) multi strand copper power wire as per IS: 694:2010 or latest, 276 conductor each dia 0.40mm +/- 0.01 with insulation thickness of 1.2 mm and nominal conductor resistance of 0.554 ohms/km and test parameters as per RDSO Specn.No.IRS: S- 76/89(Amnd.3) or latest. Color of the wire which is required will be specified by the Engineer in charge. Inspection: RDSO | Metre | 160.00 | 177 | 28,320 |
| 6 | Supply of Tinned Copper LUGs for fitting in Cable Size: 10 sqmm, Barrel Inner-dia: 4.7 mm, Barrel Outter-Dia: 7.1 mm, Barrel Length: 10mm, Stud Hole Center-dia: 9.9 mm, Palm Width: 12.6 mm, Thickness: 1.8, Lug Length: 27 mm,Thimble Type: Ring. Inspection: Consignee | Numbers | 160.00 | 4 | 640 |
| 7 | Supply of Copper Strip of cross section size 25 mm X 6 mm . Inspection: Consignee | Metre | 8.00 | 826 | 6,608 |
| 8 | Supply of Copper tape for BRC of cross section size 25 mm X 2 mm. Inspection - Consignee | Metre | 240.00 | 295 | 70,800 |
| 9 | Supply of GI tape for ring earth of cross section size 50 mm x 6 mm. Inspection : Consignee | Metre | 200.00 | 546 | 1,09,200 |
| 10 | Installation of MEEB/SEEB/BRC with the insulators (As per the instruction of Site Engineer). Fitting materials & Insulator (Dough Moulding Compound Conical type of different Size) as per the site requirement to be supplied by the contractor. Note: 'No' in the unit column indicates 'per insulator' | Numbers | 112.00 | 29.5 | 3,304 |
| 11 | Routing and connecting of all the equipment in the equipment/relay room to SEEB with 10 sq. mm copper cable using copper lugs with stainless steel nut and bolts and fixtures. The work includes laying and routing the copper cable in PVC / conduits and fixing them on wall. The PVC/conduit pipe to be supplied by Railway. | Metre | 280.00 | 58 | 16,240 |
| 12 | Supply of PVC rigid plain medium class conduit pipe of 50 mm dia with socket end having ISI mark as per specification No. IS:9537 (part-3)- 1983 with latest amendment and IS: 9537 (part1)-1980 with latest amendment . Inspection :Consignee | Metre | 320.00 | 77 | 24,640 |
| 13 | Supply of Medium class GI pipes 50 mm dia (3.6 mm thickness) as per IS 1239 (Part 1): 2004 for use in ASM room and at any other location as decided by Site Engineer. It includes supply of all material required for fixing arrangement. At the ends of GI pipe, flexible/corrugated HDPE pipe will be provided by contractor to protect cables from sharp edges and sudden bends.. Inspection: RITES | Metre | 40.00 | 404 | 16,160 |
| 14 | Laying & Fixing of Medium class GI pipes 50 mm dia (4.5 mm thickness) as per IS 1239 (Part 1): 2004 with socket & coupling a t locations as decided by Site Engineer. It includes installation of all material required for fixing arrangement. Contractor will install flexible/corrugated HDPE pipe at the end of GI pipe along with any masonry work (if required) to protect the cables from sharp edges and sudden bends. | Metre | 40.00 | 98 | 3,920 |
| 15 | Supply ,execution of exothermic weld for more than 16 sq mm wire. This includes welding kit, welding powder, mould and other necessary materials and tools for welding. Note: No. in unit column indicates per welding. | Numbers | 32.00 | 493.24 | 15,783.68 |
| 16 | Supply ,execution of exothermic weld for upto 16 sq mm wire size. This includes welding kit, welding powder, mould and other necessary materials and tools for welding. Note: No. in unit column indicates per welding. | Numbers | 120.00 | 372.88 | 44,745.6 |
| 17 | Supply of Nut Bolts, Washer (Stainless Steel) as per the site requirement (One set consists of 1 Nut, 1 Bolt , 2 washer & 2 spring washer) Note :- Hex Nuts, bolts and washers of size 5/16. Inspection : Consignee | Set | 80.00 | 23.6 | 1,888 |
| 18 | Supply of Earthing powder ( Earth Enhancement Material ) as per Para 8.2 of RDSO Spn. No. RDSO/SPN/197 or latest Note :- Minimum weight of Bag should be of 10 KG. Inspection: RDSO | Kg | 3200.00 | 56.05 | 1,79,360 |
| 19 | Masonry work for cutting hole through wall for insertion of cable and re instatement of wall with supply of required masonry materials and painting/whitewashing and repairing of wall with brick, sand ,cement etc. after laying of cables as per instruction of site engineer. All masonry item to be supplied by the firm except cable. | Numbers | 8.00 | 284.19 | 2,273.52 |
| 20 | Cutting of floor surface/ concrete surface for a depth of 20 cm & width of10 cm & refilling /reconditioning/repairing the surface after laying of pipe , cable. Cutting to be done with machine in proper manner & restore the same as before. | Metre | 20.00 | 238.66 | 4,773.2 |
| 21 | Digging a trench to a minimum depth of 0.5 meter and laying 50 mm X 6 mm bare GI tape connecting all the earth pits and and Carrying out exothermic weld connections on all the earth electrodes along with materials , tools for welding. Earth enhancement compound of approx. 10 Kg per meter also to be spread along the GI tape and refilling , dressing of trench. | Metre | 200.00 | 90 | 18,000 |
| 22 | Digging a trench to a depth of at least 0.5 meter and run the 35 sq. mm earth conductor in protective PVC conduit pipe, procured against supply item, from Earth pit to MEEB. Routing and exothermic termination of 35 sq. mm cable on earth conductors as well as on 300 mm X 25 mm X 6 mm MEEB, which is to be fixed inside the equipment room with two 60 mm insulation studs. The 60mm insulation studs have also to be supplied. | Metre | 40.00 | 90 | 3,600 |
| Schedule total | ₹9,43,320 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Cable_cut_HQ_JPO_94.pdf
ATTACHMENT
Spec_search_light.pdf
ATTACHMENT
STN-JAJ_1.pdf
ATTACHMENT
GCCCorrectionslip11.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
GCC Correction Slip
ATTACHMENT
GCC Correction Slip2
ATTACHMENT
mergedGCCCorrectionslip3456.pdf GCC correction slip3456
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14.07.2022_2.pdf
ATTACHMENT
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.20221.pdf
ATTACHMENT
mergedGCCCorrectionslip3456.pdf
ATTACHMENT
MergedGCCCorrectionSlip78910.pdf
ATTACHMENT
2018-CE-I-CT-9dtd.pdf
ATTACHMENT
Annexure-C.pdf
ATTACHMENT
CheckList.pdf
ATTACHMENT
ALLANNEXURENEW.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].