Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹38.7 L+₹3.1 L (8.68%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Rejected Cantractor registration card copy uploaded only one side could not match address of the contractor objection is also received from other bidders |
Tender Value
₹45.5 L
EMD Value
₹90,960
Closing Date
13 Jul 2026, 6:00 pmClosed
Executive Egnineer PWD Division Gandoh
Executive Egnineer PWD Division Gandoh
Permanent Restoration of (WSS kahaljugasar,WSS Alnigangota ,WSS Goha and WSS Jia Bunecha) by way of providing laying and Fitting of G/main/Distributiopn System at spots Damaged by flash flood/Land slide due to heavy rainfall/cloud brust
2026_PWDJK_314729_3
E-NIT 16 of 2026-27
Open Tender
Civil Works
Percentage
Gandoh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Executive Egnineer PWD Division Gandoh
₹90,960
24 Jul 2026
6 Jul 2026
14 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
6 Jul 2026 - 11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of Material from Jammu to Site of Work average 290 km by Mechanical transport and avg 5 km by HEAD load | 1.35 | MT | 5,288.05 | ₹7,138.87 |
| 2 | C/O ( HDPE Pipe ) Carriage of Material from Jammu to Site of Work average 290 km by Mechanical transport and Road side to site of Work avg. 4 Km by H.L | 6.48 | MT | 18,276.28 | ₹1,18,430.29 |
| 3 | Providing and fixing G.I. /HDPE pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) HDPE(63mm dia) | 1,500 | m | 203 | ₹3,04,500 |
| 4 | HDPE(50mm dia) | 4,500 | m | 159 | ₹7,15,500 |
| 5 | HDPE(40mm dia) | 1,700 | m | 100.5 | ₹1,70,850 |
| 6 | HDPE(32mm dia) | 2,450 | m | 64.1 | ₹1,57,045 |
| 7 | HDPE(25mm dia) | 2,800 | m | 47.14 | ₹1,31,992 |
| 8 | GI (15mm dia) | 1,110 | m | 206.5 | ₹2,29,215 |
| 9 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth 1m away from cutting edge.(70% all kind of soils ,30% ordinary rock. | 1,815.25 | Cum | 612.95 | ₹11,12,657.49 |
| 10 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil 80% : 2.6.2 Ordinary Rock 20%.(plate form cutting in in hill sides to preapare bed for trunch). | 292.9 | Cum | 623.38 | ₹1,82,588 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.66 MB
BOQ_1019344.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .