GEMC-511687730293247
Awarded to GALAXY ENTERPRISES
₹10.0 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| 150X150mm RS joist 11 Mtr long 30.6kg Per meter Each 336.6 kg | - | HSN not specified by seller | 8 Each | 42,000 | 336,000 |
| 11KV V cross arm | - | HSN not specified by seller | 7 Each | 1,250 | 8,750 |
| 11KV F CLAMP | - | HSN not specified by seller | 7 Each | 950 | 6,650 |
| Back clamp for V cross arm | - | HSN not specified by seller | 7 Each | 550 | 3,850 |
| 11kv Pin Insulator Polymer | - | HSN not specified by seller | 27 Each | 580 | 15,660 |
| 6 HW fitting Term and Condition 45KN | - | HSN not specified by seller | 12 SET | 1,050 | 12,600 |
| Disc insulator Term and cindition C 45 KN polymer | - | HSN not specified by seller | 12 Each | 560 | 6,720 |
| HT stay set complete | - | HSN not specified by seller | 3 SET | 5,800 | 17,400 |
| HT Stay insulator | - | HSN not specified by seller | 3 Each | 70 | 210 |
| HT stay clamp 1.95kg per pair | - | HSN not specified by seller | 3 PAIR | 380 | 1,140 |
| 7 or 10 SWG Stay wire 10kg per stay | - | HSN not specified by seller | 30 KG | 500 | 15,000 |
| 11kv Icore, 100sqmm XLPE insulated AAA conductor Unarmoured | - | HSN not specified by seller | 1,329 mtr | 150 | 199,350 |
| 100x50x6 mm G 1 Channel each 2.8 Mtr. Long 9.2kg per mtrx 2 no. | - | HSN not specified by seller | 52 KG | 100 | 5,200 |
| 75x40x6 mm GI Channel each 2.8 Mtr. Long 6.8kg per mtrwith side angle | - | HSN not specified by seller | 38 KG | 100 | 3,800 |
| 50x50x6 mm GI Angle each 2.8 Mtr. Long 4.5kg per mtr with side angle | - | HSN not specified by seller | 25 KG | 100 | 2,500 |
| PG clamp for 100 mm2 AAA conductor | - | HSN not specified by seller | 12 Each | 650 | 7,800 |
| GI Nuts and Bolts of Assorted Size | - | HSN not specified by seller | 19 KG | 140 | 2,660 |
| Earthing support coil type | - | HSN not specified by seller | 8 Each | 1,250 | 10,000 |
| Danger plate | - | HSN not specified by seller | 8 Each | 150 | 1,200 |
| Anti Climbing Device made of GI barbed wire, Clamping arrangement etc. 2kg Per Support | - | HSN not specified by seller | 16 KG | 150 | 2,400 |
| Sundries Survey, Tree cutting, insulation tape, Small Size nut bolt, clamp, Binding wire, Sockets | - | HSN not specified by seller | 1 JOB | 50,000 | 50,000 |
| Concreting work of 11 Mtr GI Pole | - | HSN not specified by seller | 8 Each | 15,000 | 120,000 |
| Material cost for Concreting of Stay Wire | - | HSN not specified by seller | 3 Each | 8,500 | 25,500 |
| Dismantling of RS Joint of 11 Mtr Long | - | HSN not specified by seller | 1 Each | 10,000 | 10,000 |
| Dismantling of Pole of 8 Mtr Long PSC Pole | - | HSN not specified by seller | 3 Each | 10,000 | 30,000 |
| Dismantling of AAAC Conductor | - | HSN not specified by seller | 2,039 mtr | 50 | 101,950 |