| Sl No | Description | Qty | Unit | Sri Sowparnika Associates L3 | S RAJATHI L2 | MJ Infrastructures L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged Reinforced cement concrete work including all initial lead and lift as per the instruction of departmental officers etc complete. | 139.62 | M3 | 400 ₹55,849.6 | 99.5 ₹13,892.59 Lowest | 457 ₹63,808.17 |
| 2.00 | Earth work excavation in all soils with initial lead and lift excepting all kinds of rock dumping the excavated materials away from work site manually within 50m initial lead and initial lift etc. complete as per direction of departmental officers. | 261.8 | M3 | 100 ₹26,179.5 Lowest | 100 ₹26,179.5 Lowest | 102.4 ₹26,807.81 |
| 3.00 | Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specification. | 174.53 | M3 | 5,100 ₹8,90,103 | 5,000 ₹8,72,650 | 4,769.94 ₹8,32,496.93 Lowest |
| 4.00 | Cement concrete 1:2:4 (one cement, two sand and three aggregate) using 20mm hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 174.53 | M3 | 6,900 ₹12,04,257 | 6,000 ₹10,47,180 | 5,815.07 ₹10,14,904.52 Lowest |
| 5.00 | Conveying the excavated earth from the site to the distance of 5kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 261.8 | M3 | 88 ₹23,037.96 | 50 ₹13,089.75 Lowest | 83.2 ₹21,781.34 |
| 6.00 | Supplying and Fixing of Bitumen Pad including all Labour charges as per the direction of departmental officer ete complete. | 126 | M2 | 300 ₹37,800 | 280 ₹35,280 Lowest | 383.2 ₹48,283.2 |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
2 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Providing Cement Concrete Flooring at Thiyagi N.G. Ramasamy Lane, Sundaram Street, Chennayappan Street, Thandal Muthan Street and Annaiyappan Street areas in Ward No.18, North Zone.
2026_MAWS_694699_15
E59/2026-NZ Two cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
AS PER TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹30,000
18 Sept 2026
17 Aug 2026
3 Sept 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the damaged Reinforced cement concrete work including all initial lead and lift as per the instruction of departmental officers etc complete. | 139.62 | M3 | - | - |
| 2 | Earth work excavation in all soils with initial lead and lift excepting all kinds of rock dumping the excavated materials away from work site manually within 50m initial lead and initial lift etc. complete as per direction of departmental officers. | 261.8 | M3 | - | - |
| 3 | Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specification. | 174.53 | M3 | - | - |
| 4 | Cement concrete 1:2:4 (one cement, two sand and three aggregate) using 20mm hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 174.53 | M3 | - | - |
| 5 | Conveying the excavated earth from the site to the distance of 5kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 261.8 | M3 | - | - |
| 6 | Supplying and Fixing of Bitumen Pad including all Labour charges as per the direction of departmental officer ete complete. | 126 | M2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_835381.xls
BOQ • 0.32 MB
ROADDOC.pdf
Tender Documents • 0.92 MB
ITB.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .