Loading…
Loading…
Tender Value
₹2.8 L
EMD Value
₹2,786
Closing Date
24 Aug 2026, 5:30 pmDue tomorrow
EO, Paradeep Municipality
Paradeep Municipality
Construction of Loo at near Paradeep Port Banika Sangha, Badapadia in Ward no-15.
2026_ORULB_137596_52
EO/ PDPM/ W_07/ 2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Paradeep Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹2,786
Yes
11 Aug 2026
11 Aug 2026
25 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in foundation in all kind of soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the EIC. 15 | 8.9 | %cum | 26,095.66 | ₹2,32,251.37 |
| 2 | Providing spreading, filling in foundation and plinth with sand watered and rammed as per OPWD specification including cost of materials, labour, conveyance, royalty, Tools and Plants etc.all complete required for the work to finished items of work. 18 | 1.51 | cum | 1,107.75 | ₹1,672.7 |
| 3 | PCC (1:3:6) with 40 mm size HG metal including all cost of materials, labour, conveyance, royalty, T&P, water for curing etc all complete. 37 | 1.45 | cum | 7,064.79 | ₹10,243.95 |
| 4 | Fly ash bricks 25 cm x 12 cm x 8 cm size having C/S > 75 kg/cm2 in CM (1:4) in foundation and plinth including cost of materials, labour, royalty, conveyance, Tools and Plants, water for curing etc. all complete as per OPWD specification required for the work to finished items of work. 92 | 6.17 | cum | 6,147.63 | ₹37,930.88 |
| 5 | Fly ash bricks 25 cm x 12 cm x 8 cm size having C/S > 75 kg/cm2 in CM (1:6) in super structure including cost of materials, labour, royalty, conveyance, Tools and Plants, water for curing etc. all complete as per OPWD specification required for the work to finished items of work. 96 | 7.92 | cum | 6,180.63 | ₹48,950.59 |
| 6 | 25 mm DPC with PCC (1:2:4) using 12 mm. Size CBHGC 124 | 3.55 | sqm | 413.41 | ₹1,467.61 |
| 7 | PCC/ RCC (1:1½:3) with 12 mm size CBHGC including hosting and laying all cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc.all complete. 55 | 1.88 | cum | 9,402.8 | ₹17,677.26 |
| 8 | Requirement of HYSD/ MS rod and labour for cutting, bending,binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge. 62 | 1.04 | qtl | 8,543.93 | ₹8,885.69 |
| 9 | RCC foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc. 67 | 3.19 | sqm | 249.73 | ₹796.64 |
| 10 | RCC Lintels. 69 | 0.38 | sqm | 580.63 | ₹220.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_605443.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].