Tender Value
₹80 L
EMD Value
₹1.6 L
Closing Date
16 Nov 2023, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, Temp. Maha Kumbh Mela 2024-25, Electricity Circle, Prayagraj
Refer to Tender Description
2023_PVVNV_859664_1
62/TMKM/EC/MM/2023-24
Open Tender
Electrical Works
Lump-sum
30 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹9,440
Yes
Account Number- 50200079575664
₹1.6 L
Yes
22 Nov 2023
4 Nov 2023
16 Nov 2023
4 Nov 2023
16 Nov 2023
4 Nov 2023
Amount
Construction of Temporary 11 KV Line, L.T. line, Installation & Repairing of Street Light and other Miscellaneous works in Upper Bundh Area (Parade) West of ganga river including Parking Area, during Magh Mela 2023-24 which includes loading, unloading and carriage of all required materials from Store centre Naini to Mela Area and dismantling of all materials after completion of mela and Carriage back to Store Centre Naini, Prayagraj. (MS Nut & Bolts with washer for all related works will be provided by contractor on rental basis).
Construction of L.T. line single phase 4 wire by ACSR weasel/Dog conductor after erection of 9 Mtr. Long S.T.P. alongwith guarding with the help of 6/8 SWG G.I. wire (minimum 8 nos latching per span on main roads and 4 No. latching per span in other area) & earthing of poles..(contractor will provide 05 gang for construction of LT line. per gang comprising 02 skilled and 08 unskilled persons )
Maintenance of L.T. Line single phase, 4 wire by providing maintenance gang round the clock for complete Mela period.(contractor will provide 03 gang round o clock for maintance of LT line. Each gang comprising 01 skilled and 02 unskilled persons)
Maintenance of L.T. Line single phase, 4 wire by providing maintenance gang round the clock form 01.12.2023 to 30.06.2024.(contractor will provide 03 gang round o clock for maintance of LT line. Each gang comprising 01 skilled and 02 unskilled persons)
Dismantling of L.T. line single phase, 4 wire after completion of Mela period.
Construction of L.T. line Three phase 6 wire by ACSR weasel/Dog conductor after erection of 9 Mtr. long S.T.P. alongwith guarding with the help of 6/8 SWG G.I. wire (minimum 8 nos latching per span on main roads, Ghats and 4 nos latching per span in other area) & earthing of poles.(contractor will provide 05 gang for construction of LT line. per gang comprising 02 skilled and 08 unskilled persons )
Maintenance of L.T. Line Three phase 6 wire by providing maintenance gang round the clock for complete Mela period.(contractor will provide 03 gang round o clock for maintance of LT line. Each gang comprising 01 skilled and 02 unskilled persons)
Maintenance of L.T. Line three phase, 6 wire by providing maintenance gang round the clock form 01.12.2023 to 30.06.2024.(contractor will provide 03 gang round o clock for maintance of LT line. Each gang comprising 01 skilled and 02 unskilled persons)
Dismantling of L.T. line Three phase 6 wire after completion of Mela period.
Testing, Checking & Installation of LED Street Light Fittings including Repairing & Maintenance (as per requirement such that contractor must only install working condition street lights (all required material for repairing will be provided by contractor)) by Mounting & fixing of street light bracket with clamps and LED street light fitting, on erected S.T.P. in proper position and making electrical connection. (LED Light, Street light bracket with clamp will be provided by the department, rest all required materials will be provided by the contractor) which includes loading, unloading and carriage of all required materials from Store centre Naini to Mela Area and dismantling of all materials after completion of mela and Carriage back to Store Centre Naini, Prayagraj.
LED 105-120 Watt
LED 160-180 Watt
LED 245-260 Watt
Installation, Maintenance & Dismantling of L.T. P.V.C. Cable Laying of following L.T. P.V.C. Cables for giving 24 hours supply during Magh Mela 2023-24,which includes loading, unloading and carriage of all required materials from Store centre Naini to Mela Area and dismantling of all materials after completion of mela and Carriage back to Store Centre Naini, Prayagraj.
2x4 sq. mm.
2x6 sq. mm.
2x10 sq. mm.
3X1.5 sq mm. (Street Light)
4x10 sq.mm.
4x16/4x25 sq. mm.
3.5x70/150 sq mm or equivalent size (single core).
Providing Camp Connection with conduit wiring , installation of MCB with box and Light Fitting in camps, premises, shops etc. by fixing, fitting, tapping of connection from nearest mains with 2 core insulated cable having no joints except end terminal and all such materials required for actual energisation of these light points irrespective of their distance inside the camps, shops, premises etc will be provided by the contractor on rental basis. (All wiring should be done in PVC conduit, PVC conduit with all accesories will be provided by contractor on rental basis) (contractor will provide 10 gang for camp connection, maintance and dismantling after mela per gang comprising 01 skilled and 01 unskilled persons )
14/20 Watt LED BULB(BIS CERTIFIED)
20 Watt TUBE BULB(BIS CERTIFIED)
MCB(ISI STANDARD) WITH NUMBERING
Providing Bulk supply/single points connection to Mela Area for administrative camps and all essential services by providing following capacity of distribution board (Distribution board along with all required accesories will provided by contractor on rental basis) during Magh Mela 2023-24 and dismantling after completion of Mela period.
Installation of Distribution board of size 2.5'x2' on wooden board with cutout of 200/100/63 amp as per requirement of site for three phase along with neutral link on rental basis. The distribution board should be fixed on iron angle frame at the height of 5' from ground level.
Installation of Single Phase/Three Phase (as per requirement) Distribution board having capacity of 32/16/5 amp on wooden/PVC board on rental basis.
Providing 5 Amp Socket Point connection for Charging Mobile/Battery for communication & biometric system will be provided by the contractor on rental basis.(Socket Point must not be inside Camps and be in open area)
Installation of Switches 5/15 Amp will be provided by the contractor on rental basis.
Painting of 9.0/11 Mtr. long ST poles (Silver Paint with Red Oxide Coating) upto 7 feet from ground level at main road and ghats, Installed pole which erected on main roads, different offices during Magh Mela 2023-24. (All required materials will be provided by the contractor).
Construction of 11 KV line & 100 KVA Sub-Station for giving supply to Jal Nigam Tube well during Magh Mela 2023-24, which includes loading, unloading and carriage of all required materials from Store centre Naini to Mela Area and dismantling of all materials after completion of mela and Carriage back to Store Centre Naini, Prayagraj. (All size of MS nut & bolt, T-off holding clamp and danger board will be provided by contractor on rental basis.)
Construction of Temporary 11 KV overhead Line on STP 11 Mtr. long after erection of pole by ACSR DOG conductor with proper guarding (min 8 No. latching per span) and its earthing.
Maintenance of 11 KV overhead Line by providing maintenance gang for complete Mela period.
Dismantling of complete 11 KV overhead Line after completion of Mela period and carriage back complete line material.
Construction of section double pole for 11kv line on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/angles/G.O, painting and earthing etc.
Construction of section four pole for 11kv line on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/ angles, plinthing, painting and earthing etc.
Construction of double pole for 1x100 kva t/f on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/with bracing angles /G.O, D.O, painting and earthing etc. Installation of 100 KVA Transformer on DP, earthing of transformer body and neutral. alongwith dismantling after completion of Mela period.(All essential materials for painting to be provided by the contractor).
Laying/hanging of L.T cable 3½x70/150 Sqmm or equivalent size cable from transformer to main switch of tubewell in mela area alongwith dismantling after completion of Mela period.
Erection of 9/11 M Long STP single pole and stringing of 7/10swg stay wire for hanging of 3x120/185 sqmm 11 KV XLPE cable, including fixing of all necessary accessories(only STP and stay wire will be provided by department, all other necessary materials will be provided by contractor)
Laying of XLPE 3x120/185 Sq.mm. cable in mela area.
Hanging of XLPE cable 3x120/3x185 Sq.mm along with stay wire 7/10 swg on already erected ST pole in mela area.
Fixing of H.S. type 11 KV 3x185 sq mm S/T cable joints & End Terminations.
Fixing of H.S. type 11 KV 3x185 sq mm O/D cable joints & End Terminations with proper connection to overhead line.
M/S SHRIYA ENTERPRISES
RAKESH ELECTRIC WORKS,ECID
M/S Ajay Tripathi
M/s YEESHOO VASOO AND CO.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .