Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹30 L
Closing Date
18 Jun 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, SDA
Tourism Development Authority, Sonamarg
Development of Pony Track No. 01 B.w.0. flat stone pitching with edge walls at Sonamarg.
2022_Tourm_172907_2
eNIT 04 of 2022
Open Tender
Civil Works
Item Rate
30 days
Sonamarg
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Executive Engineer,SDA
Exempted
20 Jun 2022
7 Jun 2022
20 Jun 2022
7 Jun 2022
18 Jun 2022
7 Jun 2022
120 days
Amount
Supplying and spreading the tunnel excavated material including compaction with road roller of 8 to 10 tonne capacity and including all head load/carriages upto site (compacted depth to be measured for payment)
Surface dressing of the ground including removing vegetation & in–equalities undulation (exceeding 30m in depth) to make the surface smooth as per direction of Engineer in charge & as required for flat stone paving including removal of surplus earth upto 50 mtr lead
Earth work in excavation by manual means in tranches for foundations, drains, pipes, cashes 1.5 mtr. in width including dressing of sides & ramming of bottom lift upto 1,5mtr including disposal of surplus excavated earth( all kinds of soils).
Supplying/filling dry stone soling tightly hand packed under foundation & under floors including all carriages / head load upto site of work complete.
Providing and laying in position cement concrete of specified grade laid in 1:3:6 4 (1 cement : 2 coarse sand : 6 graded stone aggregate using 20mm nominal size nallah stone aggregate) including all carriages / head load upto site of work complete.
Providing and laying in position cement concrete of specified grade All work upto plinth level in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) using nallah aggregate including shuttering charges & all carriages / head load upto site of work complete.
Supplying and laying flat stone pitching 22.5cm thick laid in courses of required profile with hammer dressed stons having no side less than 15 cm, with minimum depth of 20 cm including preparing the bedding surface etc & including filling the joints/gaps with cement concrete 1:2:4 mix with cement grouting over the top of gaps including all the head loads/carriages of material upto site complete job.
M/S MAIRAJ UD DIN KHAN
M/S MUDASIR AHMAD LONE
M/S GHULAM NABI PARAY
GHULAM RASOOL WANI
GH MOHD SHAH
stage.html
html • 0.03 MB
finance_408901.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .