Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹79.0 LAccepted-AOC 17 NETHAJI ROAD MADURAI 625001 | MADURAI | TAMIL NADU | 625001 | 1 | Accepted-AOC ACCEPT | |
| 2 | 2₹85.7 L+₹6.7 L (8.54%)Rejected-AOC PUDUKKOTTAI PUDUKKOTTAI | PUDUKKOTTAI | TAMIL NADU | 613301 | 2 | Rejected-AOC REJECT |
Tender Value
₹80 L
EMD Value
₹80,000
Closing Date
3 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
1st floor, DRDA, Theni
Renewal BT of road from U.Ammapatti-Kombai road Km 0/0-2/9(R5)
2023_RDTN_307146_1
DIPR/2018/Tender/2023
Open Tender
Civil Works - Roads
Item Rate
90 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹80,000
20 Jun 2023
26 Apr 2023
3 May 2023
26 Apr 2023
3 May 2023
26 Apr 2023
Amount
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking the existing metal surface 7.5 cm much removing the picked up stuff to the sides, collection all useful metal leveling and sectioning top camper power roller ansolidation by power roller etc.,
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing 75mm consolidated thickness WBM for TOP LAYER using 1 cum of Grade III metal of 63 to 11.2mm IRCsize HBG metal with 0.24 cum of gravel for blindage and filler for 10 sqm area including cost and conveyance of all materials from the approved quarries to roads side and stacking them to the departmental standard metric gauge for pre measurements including labour for laying spreading new metal hand packing to camber, gravel blinding, watering (with all leads for good water even if the season is worst drought) forming edge bunds and consolidation by 8 to 10 tonne power roller and finishing the Road to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T & P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc. complete. ( The payment shall be made compacted volume based )
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM surface preparatory to another bituminous construction over it.
Providing and laying of prime coat using Emulsion at the rate of 2.5 Kg per ten square meter over the WBM surface preparatory to another bituminous construction over it.
Applying tack coat using 3.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Collection and Supply of Red gravel from the approved quarry incl cost and conveyence of all materials to site incl all labour charges for spreading and compaction with power roller etc for shouklders etc to complete
Earth work excavation borrow pts to filling in all classes of soil such as sand sit or other loose soil, wet sand, or silet not undr water, light black cottong soil, sandy loam and ordinary soil including excavated earth as per SS 20A
Road making with Hot applied thermoplastic compound with reflecting Glass Beads on Bituminous Surface
Exterier Emulsion painting two coats with approved emulsion paint including cost and conveyance of all materials to and all labour charges etc.complete for 10 sqm
Road markers / Road stud with lens Reflectors
supplying and fixing of Road Delineators
60cm Equilatral Triangle Sign Board
80cm x 60cm Rectangular Board
Provision for steel Name board With Maintance Board
Construction of Retaining wall km 1/0-2/0
Earth work excavation in all clauses of soils except hard rock with an initial lead and lift including strutting, bailing out water as per standard speciation etc complete.
Cement concrete -1:4:8using 40 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
supplying ,erecting and centring including cost and conveyance of all materials to site and all labour charges etc(for Ret.
Cement concrete -1:3:6using 40 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
Refilling with excavated earth as per stanadard specification
PVC WHEEP HOLE
PVC WHEEP HOLE
Construction of Retaining wall km 2/0-2/9
Earth work excavation in all clauses of soils except hard rock with an initial lead and lift including strutting, bailing out water as per standard speciation etc complete.
Cement concrete -1:4:8using 40 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
supplying ,erecting and centring including cost and conveyance of all materials to site and all labour charges etc(for Ret.
Cement concrete -1:3:6using 40 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
Refilling with excavated earth as per stanadard specification
PVC WHEEP HOLE
PVC WHEEP HOLE
provision for HM Stone
provision for KM Stone
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
P Pandiaraj
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .