Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹86.9 LAdmitted-Finance | -17.15% | ₹86.9 L | L1 | Admitted-Finance |
| 2 | L2₹89.0 L+₹2.0 L (2.33%)Admitted-Finance | -15.22% | ₹89.0 L+₹2.0 L (2.33%) | L2 | Admitted-Finance |
| 3 | L3₹89.2 L+₹2.2 L (2.57%)Admitted-Finance | -15.02% | ₹89.2 L+₹2.2 L (2.57%) | L3 | Admitted-Finance |
| 4 | L4₹93.9 L+₹7.0 L (8.04%)Admitted-Finance | -10.49% | ₹93.9 L+₹7.0 L (8.04%) | L4 | Admitted-Finance |
| 5 | L5₹98.0 L+₹11.1 L (12.8%)Admitted-Finance WARD NO 09 VPO CHHAPOLI UDAIPURWATI JHUNJHUNU RAJASTHAN 333302 | JHUNJHUNU | RAJASTHAN | 333302 | -6.57% | ₹98.0 L+₹11.1 L (12.8%) | L5 | Admitted-Finance |
Tender Value
₹1.0 Cr
EMD Value
₹2.5 L
Closing Date
18 Aug 2026, 6:00 pmClosed
Executive Engineer
Office of The Executive Engineer SNIP Division Ist CAD Hanumangarh
Construction of pucca water course in Chak 11 MKS
2026_CECAD_584483_2
SNIP_NIB_03_2026-27
Open Tender
Civil Works
Percentage
150 days
Hanumangarh
As per tender document
3 documents required · 3 mandatory
₹5,000
Executive Engineer SNIP Div Ist CAD Hanumangarh
₹2.5 L
Yes
20 Aug 2026
8 Aug 2026
19 Aug 2026
8 Aug 2026
18 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work
Earth work excavation in Ordinary soil, undressed inclusive of all lift but with combined lead up to 200 mtrs. | 15,208.28 | Per Cum | 75 | ₹11,40,621 |
| 2 | Dressing of earthwork for all types of earth work new or repair work for all types of soil. | 15,208.28 | Per Cum | 1.6 | ₹24,333.25 |
| 3 | Ramming of earth work in layers by wooden Iron rammers to obtain dnsity from 1.55 to 1.60 in ordinary soil. | 15,208.28 | Per Cum | 10 | ₹1,52,082.8 |
| 4 | Lining
Watering, ramming & dressing of sub grade including removal of irregularities upto 15 cm depth | 5,802.71 | Per Sqm | 9.5 | ₹55,125.75 |
| 5 | Brick masonry in foundation and plinth with brick destination 75 in cement sand mortar 1:5 | 1,025.29 | Per Cum | 5,047 | ₹51,74,638.63 |
| 6 | Add extra for using brick class designation 100 instead of class designation 75. | 1,025.29 | Per Cum | 342 | ₹3,50,649.18 |
| 7 | Cement plaster with cement sand mortar (1:4) including racking of joints, smooth finishing and curing etc. complete including all leads of all constrruction materials of thickness. in 10 mm in one coat. | 10,358.1 | Per Sqm | 196 | ₹20,30,187.6 |
| 8 | Pucca Structures
Earth work excavation in ordinary soil, undressed inclusive of all lift but with combined lead up to 200 mtrs. | 3,916.66 | Per Cum | 75 | ₹2,93,749.5 |
| 9 | Providing and laying cement concrete including curing, compaction etc. complete using stone aggregate 40 mm nominal size in foundation plinth, excluding the cost of shuttering using.
1 Cement : 4 sand : 8 aggregate mix | 69 | Per Cum | 4,586 | ₹3,16,434 |
| 10 | Brick masonary in foundation and plinth with brick destination 75 in Cement sand mortar 1:6 | 152.45 | Per Cum | 4,947 | ₹7,54,170.15 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.84 MB
BOQ_1038194.xls
BOQ • 0.29 MB
corrigendum.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .