| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | -29.25% | ₹1.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.1 L+₹6,612.19 (6.16%)Admitted-Fee/PreQual/Technical/Finance | -24.89% | ₹1.1 L+₹6,612.19 (6.16%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.4 L+₹29,188.56 (27.2%)Admitted-Fee/PreQual/Technical/Finance | -10.00% | ₹1.4 L+₹29,188.56 (27.2%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.5 L+₹39,800.52 (37.1%)Admitted-Fee/PreQual/Technical/Finance | -3.00% | ₹1.5 L+₹39,800.52 (37.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹3,040
Closing Date
21 Jul 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISION SMC REGAL LANE LAL CHOWK
Upgradation of lane from H/o Shabir Ahmad Tiploo near Abu Hanfiya Aiwa Kadal, Saidpora Achan
2026_HAUDD_315168_9
SHORT Term NOTICE INVITING ETENDER No. 09 of 2026-2027 Dated 08.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
30 days
Abu Hanfiya Aiwa Kadal, Saidpora Achan
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹206
FA/CAO AC NO 0216010200000007
₹3,040
24 Aug 2026
8 Jul 2026
22 Jul 2026
9 Jul 2026
21 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 2.42 | Cum | 256.85 | ₹621.58 |
| - | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. | 97.83 | Sqm | 153 | ₹14,967.99 |
| - | Supplying/Stacking/laying natural occuring gravel maximum size 75mm GSB/Nalla Muck including sorting, spreading, to template and consolidation with PRC of 8 to 10 Tonne capacity etc with all carriage and cost of material involved complete job | 14.03 | Cum | 850 | ₹11,925.5 |
| - | Supplying and laying of water bound macadam (Grade 2nd) with specified stone aggregate stone screening and binding material including screening, sorting, spreading to template and consolidation with power road roller of 8 to 10 Tonne capacity etc complete. including carriage upto site of work for all materials. Sub Base coarse with 63mm to 45mm size including stone screening 13.2mm size. | 5.96 | Cum | 2,500 | ₹14,900 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.48 | Cum | 5,202.9 | ₹2,497.39 |
| - | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 2.78 | Cum | 1,725.2 | ₹4,796.06 |
| - | Providing laying and fixing of PVC pipes of prince make grade B incld excavation and refilling complete job as directed at site including carriages up to site of work Camp. 200 mm | 87 | Rft | 330 | ₹28,710 |
| - | Providing laying and fixing of PVC pipes of prince make grade B incld excavation and refilling complete job as directed at site including carriages up to site of work Camp. 100 mm | 20 | Rft | 150 | ₹3,000 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 8.02 | Cum | 5,733.6 | ₹45,983.47 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 32.24 | Sqm | 286.35 | ₹9,231.92 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_1021477.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .