Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹11.0 LAccepted-Finance S O TSERING NORBOO R O NYOMA | 1st | Accepted-Finance Qualified |
Tender Value
₹7.7 L
EMD Value
₹15,400
Closing Date
12 Jan 2021, 4:00 pmClosed
Executive Engineer SSD Nyoma
Executive Engineer SSD Nyoma
4 mtr span RCC Culvert in Link road from Gangsur to Nyoma Gonpa. (D.Plan)
2020_PWD_1267_56
E-Tender of 04 SSD Nyoma 2020-21
Open Tender
Civil Works - Others
Item Rate
45 days
Nyoma
As per NIT
8 documents required · 8 mandatory
₹500
Executive Engineer SSD Nyoma
₹15,400
10 Feb 2021
5 Jan 2021
13 Jan 2021
5 Jan 2021
12 Jan 2021
5 Jan 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches, drains, pipes and cables etc. (not exceeding 1.5mtr in width or 10sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5mtr including getting out excavated soil and disposal of surplus soil as directed, within a lead of 50 mtr. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) (A) Nallah
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level 1: 3 :6 (1 cement 3 coarse sand 6 gradeastone aggregate 20mm nommal Size. Crushed
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands,plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring,shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo Mechanically Treated Bars.
Centering and shuttering incluidng strutting,propping etc & removal of form work for a)Wall (any thcikness ) including attached pilasters , buttressrs plinth and string course etc.
Centering and shuttering incluidng strutting,propping etc & removal of form work for b)suspended floor , roods, landing balconies and access platform.
Carriage of Material by MT. Cement an average lead 182 Km
Carriage of Material by MT. Sand an average lead 8.0 Km
Carriage of Material by MT. Stone aggregate an average lead 20 Km.(Nallah)
Carriage of Material by MT. Stone aggregate an average lead 45 Km (Crushed).
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .