Tender Value
₹1 L
EMD Value
₹1,000
Closing Date
18 Apr 2022, 2:00 pmClosed
SE EUDC- III (U.P)
Taalkatora power house lesa lucknow
Increasing capacity of 250 K.V.A. Transformer in to 400 K.V.A. Transformer at Kashmiribagh in the area of E.U.D.D.-UPTRON, LESA CIS Gomti, Lucknow against Business Plan 2022-23
2022_MVVNL_687234_1
04/E.U.D.C.-III/2022-23
Open Tender
Miscellaneous Works
Fixed-rate
180 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
A/c.No-35140200000129 IFSC-BARBORAJLUC
₹1,000
20 Apr 2022
12 Apr 2022
18 Apr 2022
12 Apr 2022
18 Apr 2022
12 Apr 2022
Amount
Safe carriage, loading and unloading of following material from ESC Daliganj, Lucknow to work site/J.E. dump store.
11/0.4 K.V. 400 K.V.A. Transformer.
LT cable 1X400 Sq.mm.
LT cable 1X240 Sq.mm.
ABC (3X120+1X95+1X16 Sq.mm.)
Disconnection of existing 250 KVA Transformer from system shifted upto safe place to the nearest 33/11 K.V. Sub-Station of Division or required place.
Placing of 400 K.V.A. healthy Transformer from out side of yard to plinth with the help of crain and T & P.
Earthing of 11/0.4 K.V. Distribution Transformer's body & neutral by way of boring and lowering of ISI marked two nos. G.I pipe 1.5" dia 20 m deep from the ground level with solid cone at the lower end of G.I pipe. One end of G.I strip of size 50X6 mm. will be connected with neutral / body of the Transformer & other end will be clamped & welded with G.I Pipe as per UPPCL norms (All the material will be arranged by contractor at their own cost.)
Lay down the LT PVC cable of different sizes for making the both side, connection of Transformer after fixing the necessary clamps Lugs and other material required for completion of work including carriage from store center.
Repairing of masonary type plinth of various DT's installed in the area, along with all the material required.
AB Conductor Stringing & sagging of 3 phase with necessary clamps, Eye hook, Suspension clamp, A-B type connector etc. on ABC New line as per RESPO specification and direction on E/I. ABC shall be supplied by department.
Supply and fixing of following material -
Aluminium Lug 400 mm.
L-piece for 400 K.V.A. Transformer.
1 Material supplied by Department - Transformer, LT PVC Cable, ABC etc. 2 Material supplied by Contractor - Civil material, steel sections,Aluminium Lug, Clamps,Nuts & Bolts & other pettey items required for work. Note :- 1 All the material provided by contractor shall be as per norms of UPPCL/RESPO. 2 One carriage including loading/unloading from dump site to pit site is included in scope of work 3 During execution of work all risk will be of the contractor. 4 Contractor will provide all T & P, vehicle and man power. 5 All the old and used material should be taken on book. 6 The quantity may be vary ±10%.
SYED TRADERS
SINGH ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .