Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAdmitted-Finance | ₹15.2 L | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sudharshan Constructions L1 |
|---|---|---|---|---|
| 1.00 | Dismantling the RCC below the ground level and clearing away the dismantled materials away from the site including the cost of all labour, transportation, loading, unloading, lead, lift, T&P etc complete. | 3.2 | m3 | 13,328 ₹13,328 Lowest |
| 2.00 | Completely removing the existing worn-out tarfelt in two layers over the existing terrace and clearing the debries including the cost of all materials, lead, lift labour., complete. | 236 | m2 | 10,856 ₹10,856 Lowest |
| 3.00 | Chipping the wall plastering and clearing the debries away from the site including the cost of all T& P, lead, lift, labour, etc., complete. | 703 | m2 | 1,65,205 ₹1,65,205 Lowest |
| 4.00 | Completely removing the existing tile and bed mortar in terrace and clearing the debries including the cost of all materials, lead, lift labour., complete. | 236 | m2 | 59,000 ₹59,000 Lowest |
| 5.00 | Strengthening brick jelly concrete by adding lime powder mixed with jaggery and kaduka water well beaten with wooden beaters including the cost of all materials, lead, lift,labour etc., complete | 236 | m2 | 1,32,160 ₹1,32,160 Lowest |
| 6.00 | Supplying and laying 9"X9" pressed clay tiles to requied slope over the bed mortar 1:3 mixing with integral water proofing compound and duly pointing the tile joints with with CM mixed with seived sand and integral water proofing compound including the cost of all materials, lead, lift, labour., complete. | 236 | m2 | 3,59,900 ₹3,59,900 Lowest |
| 7.00 | Supplying and applying acrylic polymer modified mortar over the damaged tile surfaces including the cost of all materials, lead, lift, labour, etc, complete. | 278 | m2 | 1,13,980 ₹1,13,980 Lowest |
| 8.00 | Supplying and applying two coats of elastromeric coating using ISI water proofing chemical FORSROC or equivalent over the fiber mesh of 45 GSM on top of the terrace tile surface including the cost of all materials, labour, lift , lead etc., complete. | 278 | m2 | 1,45,394 ₹1,45,394 Lowest |
| 9.00 | Providing scaffolding for outer walls of the building to secure the applicators working on top using casurina props including the cost of all materials, labour, lead, lift, T&P, transport., etc complete. | 231 | m2 | 18,942 ₹18,942 Lowest |
| 10.00 | Providing water proof plastering using acrylic polymer modified mortar in cm 1;3 to the damaged RCC items/ walls to a thickness upto 20 mm mixed with SBR LATEX or equivalent @ 1 litre/4.50m2 as directed by Engineers at site including cost of all materials, labour, lead, lift etc complete. | 113 | m2 | 93,338 ₹93,338 Lowest |
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
5 Aug 2026, 1:00 pmClosed
SE/CEDC/CENTRAL
O/o SE/CEDC/CENTRAL
OT 16
2026_EB_688203_1
OT 16
Open Tender
Civil Works
Works
Saidapet
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,000
Yes
24 Aug 2026
24 Jul 2026
6 Aug 2026
24 Jul 2026
5 Aug 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the RCC below the ground level and clearing away the dismantled materials away from the site including the cost of all labour, transportation, loading, unloading, lead, lift, T&P etc complete. | 3.2 | m3 | - | - |
| 2 | Completely removing the existing worn-out tarfelt in two layers over the existing terrace and clearing the debries including the cost of all materials, lead, lift labour., complete. | 236 | m2 | - | - |
| 3 | Chipping the wall plastering and clearing the debries away from the site including the cost of all T& P, lead, lift, labour, etc., complete. | 703 | m2 | - | - |
| 4 | Completely removing the existing tile and bed mortar in terrace and clearing the debries including the cost of all materials, lead, lift labour., complete. | 236 | m2 | - | - |
| 5 | Strengthening brick jelly concrete by adding lime powder mixed with jaggery and kaduka water well beaten with wooden beaters including the cost of all materials, lead, lift,labour etc., complete | 236 | m2 | - | - |
| 6 | Supplying and laying 9"X9" pressed clay tiles to requied slope over the bed mortar 1:3 mixing with integral water proofing compound and duly pointing the tile joints with with CM mixed with seived sand and integral water proofing compound including the cost of all materials, lead, lift, labour., complete. | 236 | m2 | - | - |
| 7 | Supplying and applying acrylic polymer modified mortar over the damaged tile surfaces including the cost of all materials, lead, lift, labour, etc, complete. | 278 | m2 | - | - |
| 8 | Supplying and applying two coats of elastromeric coating using ISI water proofing chemical FORSROC or equivalent over the fiber mesh of 45 GSM on top of the terrace tile surface including the cost of all materials, labour, lift , lead etc., complete. | 278 | m2 | - | - |
| 9 | Providing scaffolding for outer walls of the building to secure the applicators working on top using casurina props including the cost of all materials, labour, lead, lift, T&P, transport., etc complete. | 231 | m2 | - | - |
| 10 | Providing water proof plastering using acrylic polymer modified mortar in cm 1;3 to the damaged RCC items/ walls to a thickness upto 20 mm mixed with SBR LATEX or equivalent @ 1 litre/4.50m2 as directed by Engineers at site including cost of all materials, labour, lead, lift etc complete. | 113 | m2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
OT16S.pdf
Additional Documents • 1.04 MB
BOQ_827230.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].