Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | ₹16.0 L | L1 | Accepted-AOC Lowest Tender rate Quoted |
| 2 | L2₹16.0 LRejected-Finance | ₹16.0 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | G.Murugan | S.Mariappan |
|---|---|---|---|---|---|
| 1.00Construction of Waiting Shed | |||||
| 1.01 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 9.62 | Cum | 2,537.28 ₹2,993.99 | 2,537.76 ₹2,994.56 |
| 1.02 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. | 4.94 | Cum | 27,335.98 ₹32,256.46 | 27,336.48 ₹32,257.05 |
| 1.03 | Brickwork in cement mortar 1:5 mix using country bricks of size 8 ¾” x 4 ¼" x 2 ¾” including cost and conveyance of all materials to site etc., complete. | 15.66 | Cum | 98,186.63 ₹1.2 L | 98,188.2 ₹1.2 L |
| 1.04 | Supplying and erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete., | 94.34 | Sqm | 1,03,302.3 ₹1.2 L | 1,03,349.47 ₹1.2 L |
| 1.05 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete. | 10.67 | Cum | 1,00,650.11 ₹1.2 L | 1,00,655.45 ₹1.2 L |
| 1.06 | Supplying and fabricating RTS / TMT STEEL rods including cutting, bending hooks, cranking, fabricating,assembling and laying in exact position,typing with softsteel wire 16 gauge ,etc., complete conforming to BIS std. | 10.1 | Qtl | 92,836.17 ₹1.1 L | 92,837.18 ₹1.1 L |
| 1.07 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete. | 83.57 | Sqm | 25,860.74 ₹30,515.67 | 25,864.92 ₹30,520.60 |
| 1.08 | Plastering in cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site from the approved sources and labour charges etc., complete. | 80.42 | Sqm | 22,988.06 ₹27,125.91 | 22,992.08 ₹27,130.65 |
| 1.09 | Weathering Course Concrete using best quality broken brick jelly of 20 mm uniform gauge in pure slaked lime ( NO Sand to be used ( over the RCC roof slab in the proportion of brick jelly to lime being 32 : 121/2 by volume laid over in single layer and consolidated to the required slope and finished thickness and beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime, jiggery water etc. complete complying with standard specifications and as directed | 1.8 | Cum | 7,798.23 ₹9,201.91 | 7,798.32 ₹9,202.02 |
Tender Value
₹16.1 L
EMD Value
₹16,100
Closing Date
10 Oct 2025, 3:00 pmClosed
BDO (BP)
BDO Office
Construction of Waiting Shed with Approach Road at Mamsapuram Village of Sirukulam Panchayat
2025_RDTN_612059_1
P4/2382/2024
Open Tender
Civil Works
Sattur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,100
Yes
20 Feb 2026
7 Oct 2025
10 Oct 2025
7 Oct 2025
10 Oct 2025
7 Oct 2025
Construction of Waiting Shed
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Brickwork in cement mortar 1:5 mix using country bricks of size 8 ¾” x 4 ¼" x 2 ¾” including cost and conveyance of all materials to site etc., complete.
Supplying and erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete.,
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Supplying and fabricating RTS / TMT STEEL rods including cutting, bending hooks, cranking, fabricating,assembling and laying in exact position,typing with softsteel wire 16 gauge ,etc., complete conforming to BIS std.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete.
Plastering in cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site from the approved sources and labour charges etc., complete.
Weathering Course Concrete using best quality broken brick jelly of 20 mm uniform gauge in pure slaked lime ( NO Sand to be used ( over the RCC roof slab in the proportion of brick jelly to lime being 32 : 121/2 by volume laid over in single layer and consolidated to the required slope and finished thickness and beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime, jiggery water etc. complete complying with standard specifications and as directed
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers.
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Distembering painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Cement Concrete 1:2:4 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A.
Providing and laying including cost and conveyance of Gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 [Plastic]
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid