| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAccepted-AOC A 201 BHAWAN ESTATE OPP KAMAYANI HOSPITAL SIKANDRA AGRA U P 282007 | AGRA | AGRA | UTTAR PRADESH | 282007 | ₹32.3 L Quoted ₹32.7 L | L1 | Accepted-AOC Being the L1 |
| 2 | L2₹34.6 L+₹1.8 L (5.58%)Rejected-Finance 0 NAGLA UDHA AZIJ PUR SOHALLA ROAD DHANOLI AGRA AGRA UTTAR PRADESH 282001 UDYAM UP 01 0036518 | AGRA | UTTAR PRADESH | 282001 | ₹34.6 L+₹1.8 L (5.58%) | L2 | Rejected-Finance Being other than lowest |
| 3 | L3₹36.7 L+₹3.9 L (12.0%)Rejected-Finance 19 TAGORE PUBLIC SCHOOL COMPLEX SEWLA SARAI MALOOK CHAND GWALIOR ROAD AGRA UP 282001 | AGRA | AGRA | UP | 282001 | ₹36.7 L+₹3.9 L (12.0%) | L3 | Rejected-Finance Being other than lowest |
| 4 | L4₹37.5 L+₹4.7 L (14.5%)Rejected-Finance 59 100 AJIT NAGAR GATE KHERIA AGRA 282008 | AGRA | AGRA | UTTAR PRADESH | 282008 | ₹37.5 L+₹4.7 L (14.5%) | L4 | Rejected-Finance Being other than lowest |
| 5 | L5₹38.1 L+₹5.4 L (16.5%)Rejected-Finance 23 GOURI KUNJ COLONY RONTA AGRA 282009 | AGRA | AGRA | UTTAR PRADESH | 282009 | ₹38.1 L+₹5.4 L (16.5%) | L5 | Rejected-Finance Being other than lowest |
| Sl No | Description | Qty | Unit | GIRENDRA SINGH AND CO L7 | deva engineers L4 | M/s Kok Singh Sisodia L5 | durgey traders L2 | R K SINGH AND CO L9 | aman construction & general suppliers L12 | JEE JEE BUILDERS L11 | shubham traders L10 | Jain prem construction L1 | M/S Arti Constructions L6 | M/s Srijan Construction Company L3 | M/S RADHEY GOVIND ENTERPRISES L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dewatering/desludging of septic tanks, Grease trap etc of any depth, cleaning of all sludge, silt residue of both organic and inorganic nature by Mechanically used Hydraulic suction sewer cleaning machine having suitable tank capacity including skilled driver, operator & labour etc and disposal off the same out side the defence area all as directed by Engr-in-Charge. Note - 1. After receiving complaint from MES Rep by Contractor's supervisor / Site Engineer, job to be completed within 12 working hours. 2. Debris and sludge etc taken out shall be measured in "cum" .The quantum of work done for payment purpose shall be the solid content of sludge or debris. Solid content shall be 50% of volume of loose sludge/debris containing sludge water.3-Note :- In case contractor failed to rectify scheduled program a recovery of Rs.500/- per day shall be deducted from his payment. | 125 | CUM | 100 ₹12,500 | 120 ₹15,000 | 100 ₹12,500 | 340 ₹42,500 | 150 ₹18,750 | 120 ₹15,000 | 200 ₹25,000 | 140 ₹17,500 | 100 ₹12,500 | 90 ₹11,250 Lowest | 120 ₹15,000 | 1,000 ₹1,25,000 |
| 2.00 | M&L for mechanically used water sucking hydraulic pressure machine(min 3000ltr capacity) for cleaning of blocked manholes/sewage line and disposed off the same out side the defence area all as specified & directed by Engineer-in-charge .Note :- In case contractor failed to deploy the machine as per scheduled program a recovery of Rs.500/- per day shall be deducted from his payment. | 85 | Per Trip | 2,000 ₹1,70,000 | 1,200 ₹1,02,000 | 2,300 ₹1,95,500 | 900 ₹76,500 Lowest | 2,300 ₹1,95,500 | 2,600 ₹2,21,000 | 2,100 ₹1,78,500 | 2,350 ₹1,99,750 | 1,000 ₹85,000 | 2,500 ₹2,12,500 | 2,400 ₹2,04,000 | 4,000 ₹3,40,000 |
| 3.00 | Cleaning of blockage from WCs/Gully trap/Nahani trap/Floor traps and vertiical pipes of any size by removing cover if required & refixing in position including removal of sludge & sediments from chamber & disposing it away from the domestic premises all as specified and directed. | 1,500 | Each complaints | 100 ₹1,50,000 | 50 ₹75,000 | 60 ₹90,000 | 40 ₹60,000 Lowest | 100 ₹1,50,000 | 50 ₹75,000 | 110 ₹1,65,000 | 80 ₹1,20,000 | 40 ₹60,000 Lowest | 80 ₹1,20,000 | 50 ₹75,000 | 100 ₹1,50,000 |
| 4.00 | Cleaning of chocked /blocked sewage lines of any bore pipe by rodding /mechanically taking out loose sedimented sand dirt, oil and grease, sludge water, rags, fibers or vegetation etc from any depth of sewage lines including removal of sludge/debris/building materials to a distance exc 250m but n.exc 500m and buried under ground complete all as specified and as directed. Note:- All T&P if required are deemed to be included in the item rate. | 1,500 | RM | 100 ₹1,50,000 | 50 ₹75,000 | 65 ₹97,500 | 50 ₹75,000 | 100 ₹1,50,000 | 55 ₹82,500 | 110 ₹1,65,000 | 80 ₹1,20,000 | 40 ₹60,000 Lowest | 80 ₹1,20,000 | 50 ₹75,000 | 50 ₹75,000 |
| 5.00 | Demolition and breaking up drain pipes 150mm dia salt glazed stone ware/AC or reinforced concrete pipe set in cement mortar including removal from site complete all as specified and directed by Engr-in-charge | 50 | RM | 20 ₹1,000 | 20 ₹1,000 | 21 ₹1,050 | 50 ₹2,500 | 30 ₹1,500 | 18 ₹900 | 32 ₹1,600 | 40 ₹2,000 | 15 ₹750 Lowest | 25 ₹1,250 | 18 ₹900 | 200 ₹10,000 |
| 6.00 | Demolition and breaking up drain pipes 200mm dia salt glazed stone ware/AC or reinforced concrete pipe set in cement mortar including removal from site complete all as specified and directed by Engr-in-charge | 75 | RM | 22 ₹1,650 | 18 ₹1,350 Lowest | 21 ₹1,575 | 55 ₹4,125 | 30 ₹2,250 | 22 ₹1,650 | 30 ₹2,250 | 40 ₹3,000 | 20 ₹1,500 | 25 ₹1,875 | 18 ₹1,350 Lowest | 250 ₹18,750 |
| 7.00 | Excavation in trenches in soft / loose soil, not exc 1.5 m wide and not exc 1.5m depth and getting out, complete all as specified and directed by Engr-in-charge. | 100.8 | Cum | 300 ₹30,240 | 350 ₹35,280 | 300 ₹30,240 | 350 ₹35,280 | 290 ₹29,232 | 260 ₹26,208 Lowest | 300 ₹30,240 | 302 ₹30,441.6 | 300 ₹30,240 | 292 ₹29,433.6 | 280 ₹28,224 | 500 ₹50,400 |
| 8.00 | Excavation in trenchessoft / loose soil, not exc 1.5 m wide and exc 1.5m but not exc 3.0m depth and getting out complete all as specified and directed by Engr-in-charge | 35 | Cum | 300 ₹10,500 | 500 ₹17,500 | 310 ₹10,850 | 500 ₹17,500 | 320 ₹11,200 | 360 ₹12,600 | 330 ₹11,550 | 318 ₹11,130 | 400 ₹14,000 | 292 ₹10,220 Lowest | 300 ₹10,500 | 700 ₹24,500 |
| 9.00 | Demolition of cement concrete(unreinforced) in ground floors and pavings etc exc 15cm thick above or below ground level complete all as specified and directed by Engr-in-charge. | 92.25 | Cum | 350 ₹32,287.5 | 300 ₹27,675 | 270 ₹24,907.5 | 1,250 ₹1,15,312.5 | 290 ₹26,752.5 | 240 ₹22,140 Lowest | 265 ₹24,446.25 | 280 ₹25,830 | 250 ₹23,062.5 | 260 ₹23,985 | 260 ₹23,985 | 700 ₹64,575 |
| 10.00 | M&L for 75mm thick PCC(1:3:6) type C2 using 40mm graded stone aggregate as in sub base of floor etc complete all as specified and directed. | 475 | Sqm | 300 ₹1,42,500 | 250 ₹1,18,750 | 270 ₹1,28,250 | 430 ₹2,04,250 | 340 ₹1,61,500 | 320 ₹1,52,000 | 265 ₹1,25,875 | 370 ₹1,75,750 | 225 ₹1,06,875 Lowest | 292 ₹1,38,700 | 280 ₹1,33,000 | 290 ₹1,37,750 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
18 Jun 2026, 6:00 pmClosed
GE AF Tech Area Agra
GE AF Tech Area Agra 282008
REPAIR/MAINT TO SEWERAGE SYSTEM, DRAINAGE SYSTEM, PATH, HARD STANDING AND ALLIED SERVICES AT CERTAIN LOCATIONS IN ZONE A OF GE (AF) TECH AREA AT AF STN AGRA
2026_MES_768227_1
8200-1818/E8
Open Tender
Civil Works
Item Rate
270 days
AF Stn Agra
As per tender documents
8 documents required · 8 mandatory
₹500
GE AF Tech Area Agra
₹70,000
Yes
19 Aug 2026
27 May 2026
24 Jun 2026
27 May 2026
18 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dewatering/desludging of septic tanks, Grease trap etc of any depth, cleaning of all sludge, silt residue of both organic and inorganic nature by Mechanically used Hydraulic suction sewer cleaning machine having suitable tank capacity including skilled driver, operator & labour etc and disposal off the same out side the defence area all as directed by Engr-in-Charge. Note - 1. After receiving complaint from MES Rep by Contractor's supervisor / Site Engineer, job to be completed within 12 working hours. 2. Debris and sludge etc taken out shall be measured in "cum" .The quantum of work done for payment purpose shall be the solid content of sludge or debris. Solid content shall be 50% of volume of loose sludge/debris containing sludge water.3-Note :- In case contractor failed to rectify scheduled program a recovery of Rs.500/- per day shall be deducted from his payment. | 125 | CUM | 100 | ₹12,500 |
| 2 | M&L for mechanically used water sucking hydraulic pressure machine(min 3000ltr capacity) for cleaning of blocked manholes/sewage line and disposed off the same out side the defence area all as specified & directed by Engineer-in-charge .Note :- In case contractor failed to deploy the machine as per scheduled program a recovery of Rs.500/- per day shall be deducted from his payment. | 85 | Per Trip | 100 | ₹8,500 |
| 3 | Cleaning of blockage from WCs/Gully trap/Nahani trap/Floor traps and vertiical pipes of any size by removing cover if required & refixing in position including removal of sludge & sediments from chamber & disposing it away from the domestic premises all as specified and directed. | 1,500 | Each complaints | 100 | ₹1,50,000 |
| 4 | Cleaning of chocked /blocked sewage lines of any bore pipe by rodding /mechanically taking out loose sedimented sand dirt, oil and grease, sludge water, rags, fibers or vegetation etc from any depth of sewage lines including removal of sludge/debris/building materials to a distance exc 250m but n.exc 500m and buried under ground complete all as specified and as directed. Note:- All T&P if required are deemed to be included in the item rate. | 1,500 | RM | 10 | ₹15,000 |
| 5 | Demolition and breaking up drain pipes 150mm dia salt glazed stone ware/AC or reinforced concrete pipe set in cement mortar including removal from site complete all as specified and directed by Engr-in-charge | 50 | RM | 10 | ₹500 |
| 6 | Demolition and breaking up drain pipes 200mm dia salt glazed stone ware/AC or reinforced concrete pipe set in cement mortar including removal from site complete all as specified and directed by Engr-in-charge | 75 | RM | 10 | ₹750 |
| 7 | Excavation in trenches in soft / loose soil, not exc 1.5 m wide and not exc 1.5m depth and getting out, complete all as specified and directed by Engr-in-charge. | 100.8 | Cum | 10 | ₹1,008 |
| 8 | Excavation in trenchessoft / loose soil, not exc 1.5 m wide and exc 1.5m but not exc 3.0m depth and getting out complete all as specified and directed by Engr-in-charge | 35 | Cum | 10 | ₹350 |
| 9 | Demolition of cement concrete(unreinforced) in ground floors and pavings etc exc 15cm thick above or below ground level complete all as specified and directed by Engr-in-charge. | 92.25 | Cum | 10 | ₹922.5 |
| 10 | M&L for 75mm thick PCC(1:3:6) type C2 using 40mm graded stone aggregate as in sub base of floor etc complete all as specified and directed. | 475 | Sqm | 10 | ₹4,750 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tender1818.pdf
Tender Documents • 1.46 MB
BOQ_860310.xls
BOQ • 1.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .