Registrar, COEP Tech Pune
Registrar, COEP Tech Pune
Renovation of Washrooms, Classroom Upgradation and Allied Civil Works in the E and TC Extension Building, COEP Tech, Pune
2026_DTEDM_1314529_1
COEPTech/BWC/Extension/26-27/7
Open Tender
Civil Works
COEP Technological University Pune
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹75,000
Civil Meeting hall, civil dep COEP Tech, Pune
4 Jul 2026
4 Jul 2026
16 Jul 2026
4 Jul 2026
15 Jul 2026
4 Jul 2026
7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work | |||||
| 1.01 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete | 378.04 | Square Meter | - | - |
| 1.02 | Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc. | 12 | Cubic Meter | - | - |
| 1.03 | Removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete. | 46 | Number | - | - |
| 1.04 | Removing ventilators and small windows with frame and stacking the materials with all leads, lifts etc. complete. | 16 | Number | - | - |
| 1.05 | Removing urinal pans or wash hand basins with frame including disconnecting the sanitary and water supply connections, removing the same carefully and stacking the serviceable materials as and where directed including throwing the unserviceable materials outside etc complete | 24 | Number | - | - |
| 1.06 | Removing W.C. pans including disconnecting the sanitary and water supply connections, removing and breaking flooring and bed con-crete around pan removing the same carefully and stacking the serviceable materials as adn where directed including throwing the unserviceable materiasls out side etc. carefully and throwing out the refusal outside etc. complete. | 12 | Number | - | - |
| 1.07 | Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete. | 25.88 | Cubic Meter | - | - |
| 1.08 | Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. | 749.49 | Square Meter | - | - |
| 1.09 | Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete. | 25.88 | Cubic Meter | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
RFPExtensionBuilding01.pdf
Tender Documents • 0.60 MB
BOQ_2254140.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid