Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.4 CrAccepted-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹17.4 Cr Quoted ₹18.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹20.2 CrRejected-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹20.2 Cr | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | - | - | Not Admitted-Fee/PreQual/Technical Others- Section-2 incomplete |
| 4 | Not Admitted-Fee/PreQual/Technical 2 HOUSE NO 214 FRIENDS COLONY RAJIV NAGAR MANDI DABWALI 125104 | MANDI DABWALI | SIRSA | HARYANA | 125104 | - | - | Not Admitted-Fee/PreQual/Technical Others- Section-2 incomplete |
| 5 | Not Admitted-Fee/PreQual/Technical 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | - | - | Not Admitted-Fee/PreQual/Technical Others-Not Qualify due to Bid Capacity |
| Sl No | Description | Qty | Unit | Ram Narain Jain Contractor L2 | JASVEER SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | SEWAGE TREATMENT PLANT “Design, construction, erection, testing and commissioning of
2.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all
respect including, Landscaping, MCC Panel Room and all other contingent Electrical, Mechanical, Electromagnetic
Flow Measurement Device on inlet and outlet, Real Time water quality monitoring with Data collection system
(Online analyzer) Piping and Instrumentation works with PLC and SCADA Arrangement for STP and MPS along with Synchronizing it with each other including furniture and laboratory equipments as per detail given in the bid
document and including following components (2 No. High Mast of 9 mtr. GI Octagonal pole of 4 mm
thickness (T=100 MM, B= 200 MM, Base Plate 320x320x20mm), window at 500 mm from Base Plate) 12
Nos. Providing and fixing of Solar light 30 watt with dark and motion sensor, 2 level intelligent dimming after 3 and 6 hours of operation, IEC certified solar panel, LM80 certified LED, IP 65 complaint design to protect from rain and dust and UL certified lituimion battery with 2 year system warranty of 6 Mtr. GI pole complete in all respect, along the road and path complete in all respect. Supply and installation of 1 No. Main Gate of (MS) 12 ft. wide main gate and 4 ft. wide wicket gate (total weight not less than 500 kg at STP site. As per satisfaction of Engineer-in-Charge
Providing and installing 2 No. centrifuges (1working plus 1 Stand bye) including centrifuge feed pump, all fittings,
instrumentations, electric panel board etc. as per design complete in all respect, including packing dry sludge in 20 kg
Bag and supplying the same in Market Kisan Sewa Kendra or as directed by Engineer-in-charge within lead as posited as clause 4.4.5 of NIT including OandM for 5 years after Defect liability period of 1 year and trial run period of 3 months. | 1 | Job | 4,15,00,000 ₹4.2 Cr | 3,50,00,000 ₹3.5 Cr |
| 2.00 | Supplying and Installation of Stainless Steel-304 Screens with Sluice Gate complete in all respects as per satisfaction of the Engineer in Charge including OandM of 5 years after1 year defect liability period and 3 months trail run period. | 1 | each | 20,00,000 ₹20 L | 1,15,000 ₹1.1 L |
| 3.00 | CCTV CAMERAS Providing and Installing 6 CCTV Cameras (4 Cameras for STP and 2 Cameras for MPS) complete as per satisfaction of the Engineer– in- Charge, within 96 hours of signing the Agreement along with 90 days recording (DVR), 32 inch LED Screen, 16 Channel DVR at STP Site and 8 Channel DVR at MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at both the sites i.e. MPS and STP shall be synchronized at STP site. i) At STP and MPS Site- 1 No. PTZ speed dome 360 degree 50X zoom camera, 3 No. 12 mm lens size, 1 Nos. 3.6 mm lens size. Make: - CP Plus Internet Protocol minimum 5 MP WDR, Night vision color mode 2.4.2 12 mm very focal with extra IR, CCTV Cameras should be installed and commissioned before starting execution of work. including OandM of 5 years after 1 year defect liability period and 3 months trail run period. | 1 | Job | 2,50,000 ₹2.5 L | 2,00,000 ₹2 L |
| 4.00 | ONLINE OUTLET EFFLUENT WATER QUALITY MONITORING SYSTEM FOR BOD, COD, TSS, PH:-
Supply, erection, testing and commissioning operation and comprehensive annual maintenance of effluent
quality monitoring system at 2.00 MLD STP Sangoha for online (Continuous) measurement of PH, Total
Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single
analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and
chemical free analysis with automatic cleaning of censor, signal cables and power cables, local data acquisition and
display of data on continuous basis for up linking the data in CPCB, HSPCB and PHED. TUV approved complete
in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring
system for effluent and as contained in scope of work A) Multi-parameter measuring converter, for connecting
upto 18 intelligent sensors Scope including 8 analog inputs/ Outputs (4 inputs and 4 outputs) (o/4-20 Ma), wide
range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for
measurement in the outlet/ effluent of plant of 2.00 MLD STP at village Sangoha with integrated with automatic
cleaning B) Robust digital pH/ ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature compensation (ATC) cable length 100 Meter (minimum) C) Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to intelligent sensors net system cable length 100 Meter (minimum) D) Data Transfer to CPCB, HSPCB and PHED Servers E) Providing GSM 5G, 4G Modem with mobile network connectivity including OandM of 5 years after1 year defect liability period and 3 months trail run period. | 1 | Job | 30,00,000 ₹30 L | 14,00,000 ₹14 L |
| 5.00 | MAIN PUMPING STATIONS Design, construction, erection, testing and commissioning of MPS and following components :- as per detail attached 1.RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 2.0 MLD average flow with peak factor of 3.00 landscaping of the campus providing and installing of 5 No. Pumping Set of i.e. 1 no. 4200 LPM (250 cum per hour), 1 no. 2800 LPM (167.0 cum per hour) and 1no. 1400 LPM (83.00 cum per hour) with 15 mtr. Head each suitable LT panel equipped with all safety devices, automatic capacitor bank and submersible cable form LT panel to pump sets complete in all respect. 2.K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISI marked D.I. fittings, Sluice valves as per requirements even for bye-pass arrangements complete in all respect. 3.3 Nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design. 4.Supply and installation of 2 Nos. mechanical coarse screens of minimum length 6 mtr for 2.0 MLD average flow with peak factor of 3.0:- i) The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in this scope of work. ii) All the infrastructure except construction of staff quarter, and path ways/ roads required to be executed at site to make the MPS functional is included in the scope of work for lump-sump job. iii) All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility. iv) The size and quantities of all the above components will be as per approved structural/ Hydraulic / Mechanical/ Electrical design to be approved by Departmental before actual execution of work including OandM of 5 years after1 year defect liability period and 3 months trail run period | 1 | Job | 90,00,000 ₹90 L | 78,00,000 ₹78 L |
| 6.00 | Annexe Building ( Ground Floor)and Utility Building (Ground Floor),Sludge Room and Centrifuge Building G plus 1) : -_ Construction of HT / LT Panel room, PLC room, Centrifuge house, Laboratory, office, MCC, Pantry, Porch, Chlorination Building, security room, centrifuge building, sludge pump room, toner room, Meter room, blower room including doors, windows and fittings with toilet blocks, pantry including all Sanitary fittings etc. as per drawings attached in DNIT at MPS and STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, anodized/powder coated aluminium frame of size 101.60mm x 50.80mm x 4.78mm for chowkhat, 99.00mm x 52.00mm x 3.00mm for door frame, 76.20mm x 44.46mm x 3.20mm for window frame with 5mm thick toughened glass AIS/Saint Gobain/ Modi Float Covered Area (150 sqm) including OandM of 5 years after1 year defect liability period and 3 months trail run period. | 150 | Sqm | 20,000 ₹30 L | 21,500 ₹32.3 L |
| 7.00 | Operation and Maintenance for complete scope of work mentioned in DNIT except STP and MPS components as per schedule iv for a period of 5 years after 12 month of defect liability period and 3 month trial run period will be charged to A/mtc. estimate complete in all respect as per approved DNIT.
(i) Operation and Maintenance during defect liability period after 3 month trial run. (12 Months) (Operation only) | 12 | Per month | 50,000 ₹6 L | 50,000 ₹6 L |
| 8.00 | (i) Operation and Maintenance for 5 years after defect liability period.
(60 Months) | 60 | Per month | 50,000 ₹30 L | 70,000 ₹42 L |
Tender Value
₹19.7 Cr
EMD Value
₹39.3 L
Closing Date
6 Jan 2025, 11:00 amClosed
VIKAS BALYAN
Karnal PHED No. 2
Civil works for STP and MPS Mechanical and Electrical Equipment Independent Feeder Design and Drawings Development of Lawns etc. Staf
2024_HRY_418722_1
2024BD9BBB5E A6A9 4D6E 8787 8F0B94907E63572PUH
Open Tender
Civil Works
390 days
SANGOHA SANGOHA
2 documents required · 2 mandatory
₹20,000
₹39.3 L
Yes
15 Sept 2025
19 Dec 2024
6 Jan 2025
19 Dec 2024
6 Jan 2025
19 Dec 2024
Amount
SEWAGE TREATMENT PLANT “Design, construction, erection, testing and commissioning of 2.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including, Landscaping, MCC Panel Room and all other contingent Electrical, Mechanical, Electromagnetic Flow Measurement Device on inlet and outlet, Real Time water quality monitoring with Data collection system (Online analyzer) Piping and Instrumentation works with PLC and SCADA Arrangement for STP and MPS along with Synchronizing it with each other including furniture and laboratory equipments as per detail given in the bid document and including following components (2 No. High Mast of 9 mtr. GI Octagonal pole of 4 mm thickness (T=100 MM, B= 200 MM, Base Plate 320x320x20mm), window at 500 mm from Base Plate) 12 Nos. Providing and fixing of Solar light 30 watt with dark and motion sensor, 2 level intelligent dimming after 3 and 6 hours of operation, IEC certified solar panel, LM80 certified LED, IP 65 complaint design to protect from rain and dust and UL certified lituimion battery with 2 year system warranty of 6 Mtr. GI pole complete in all respect, along the road and path complete in all respect. Supply and installation of 1 No. Main Gate of (MS) 12 ft. wide main gate and 4 ft. wide wicket gate (total weight not less than 500 kg at STP site. As per satisfaction of Engineer-in-Charge Providing and installing 2 No. centrifuges (1working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect, including packing dry sludge in 20 kg Bag and supplying the same in Market Kisan Sewa Kendra or as directed by Engineer-in-charge within lead as posited as clause 4.4.5 of NIT including OandM for 5 years after Defect liability period of 1 year and trial run period of 3 months.
Supplying and Installation of Stainless Steel-304 Screens with Sluice Gate complete in all respects as per satisfaction of the Engineer in Charge including OandM of 5 years after1 year defect liability period and 3 months trail run period.
CCTV CAMERAS Providing and Installing 6 CCTV Cameras (4 Cameras for STP and 2 Cameras for MPS) complete as per satisfaction of the Engineer– in- Charge, within 96 hours of signing the Agreement along with 90 days recording (DVR), 32 inch LED Screen, 16 Channel DVR at STP Site and 8 Channel DVR at MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at both the sites i.e. MPS and STP shall be synchronized at STP site. i) At STP and MPS Site- 1 No. PTZ speed dome 360 degree 50X zoom camera, 3 No. 12 mm lens size, 1 Nos. 3.6 mm lens size. Make: - CP Plus Internet Protocol minimum 5 MP WDR, Night vision color mode 2.4.2 12 mm very focal with extra IR, CCTV Cameras should be installed and commissioned before starting execution of work. including OandM of 5 years after 1 year defect liability period and 3 months trail run period.
ONLINE OUTLET EFFLUENT WATER QUALITY MONITORING SYSTEM FOR BOD, COD, TSS, PH:- Supply, erection, testing and commissioning operation and comprehensive annual maintenance of effluent quality monitoring system at 2.00 MLD STP Sangoha for online (Continuous) measurement of PH, Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cables, local data acquisition and display of data on continuous basis for up linking the data in CPCB, HSPCB and PHED. TUV approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluent and as contained in scope of work A) Multi-parameter measuring converter, for connecting upto 18 intelligent sensors Scope including 8 analog inputs/ Outputs (4 inputs and 4 outputs) (o/4-20 Ma), wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement in the outlet/ effluent of plant of 2.00 MLD STP at village Sangoha with integrated with automatic cleaning B) Robust digital pH/ ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature compensation (ATC) cable length 100 Meter (minimum) C) Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to intelligent sensors net system cable length 100 Meter (minimum) D) Data Transfer to CPCB, HSPCB and PHED Servers E) Providing GSM 5G, 4G Modem with mobile network connectivity including OandM of 5 years after1 year defect liability period and 3 months trail run period.
MAIN PUMPING STATIONS Design, construction, erection, testing and commissioning of MPS and following components :- as per detail attached 1.RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 2.0 MLD average flow with peak factor of 3.00 landscaping of the campus providing and installing of 5 No. Pumping Set of i.e. 1 no. 4200 LPM (250 cum per hour), 1 no. 2800 LPM (167.0 cum per hour) and 1no. 1400 LPM (83.00 cum per hour) with 15 mtr. Head each suitable LT panel equipped with all safety devices, automatic capacitor bank and submersible cable form LT panel to pump sets complete in all respect. 2.K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISI marked D.I. fittings, Sluice valves as per requirements even for bye-pass arrangements complete in all respect. 3.3 Nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design. 4.Supply and installation of 2 Nos. mechanical coarse screens of minimum length 6 mtr for 2.0 MLD average flow with peak factor of 3.0:- i) The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in this scope of work. ii) All the infrastructure except construction of staff quarter, and path ways/ roads required to be executed at site to make the MPS functional is included in the scope of work for lump-sump job. iii) All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility. iv) The size and quantities of all the above components will be as per approved structural/ Hydraulic / Mechanical/ Electrical design to be approved by Departmental before actual execution of work including OandM of 5 years after1 year defect liability period and 3 months trail run period
Annexe Building ( Ground Floor)and Utility Building (Ground Floor),Sludge Room and Centrifuge Building G plus 1) : -_ Construction of HT / LT Panel room, PLC room, Centrifuge house, Laboratory, office, MCC, Pantry, Porch, Chlorination Building, security room, centrifuge building, sludge pump room, toner room, Meter room, blower room including doors, windows and fittings with toilet blocks, pantry including all Sanitary fittings etc. as per drawings attached in DNIT at MPS and STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, anodized/powder coated aluminium frame of size 101.60mm x 50.80mm x 4.78mm for chowkhat, 99.00mm x 52.00mm x 3.00mm for door frame, 76.20mm x 44.46mm x 3.20mm for window frame with 5mm thick toughened glass AIS/Saint Gobain/ Modi Float Covered Area (150 sqm) including OandM of 5 years after1 year defect liability period and 3 months trail run period.
Operation and Maintenance for complete scope of work mentioned in DNIT except STP and MPS components as per schedule iv for a period of 5 years after 12 month of defect liability period and 3 month trial run period will be charged to A/mtc. estimate complete in all respect as per approved DNIT. (i) Operation and Maintenance during defect liability period after 3 month trial run. (12 Months) (Operation only)
(i) Operation and Maintenance for 5 years after defect liability period. (60 Months)
Bidder Name
Amount
Ram Narain Jain Contractor (GSTN-06ACLPJ0885F1ZK) BID ID -1195479
JASVEER SINGH CONTRACTOR (GSTN-NA) BID ID -1195556
Ram Narain Jain Contractor (BID ID -1195479)
Ram Narain Jain Contractor (BID ID -1195479)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid