| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAccepted-AOC | ₹19.9 L Quoted ₹20.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹26.5 LRejected-AOC | ₹26.5 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | RAMESH ENGINEERING CONTRACTOR L2 | SMU ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Toping of Mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. After inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (Department vehicle will be provided for drawl of oil at free of cost). | 4 | Nos | 28,000 ₹33,040 | 19,400 ₹22,892 Lowest |
| 2.00 | Charges for assembling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc. | 4 | Nos | 84,000 ₹99,120 | 65,680 ₹77,502.4 Lowest |
| 3.00 | Charges for assembling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc., | 4 | Nos | 22,000 ₹25,960 | 16,440 ₹19,399.2 Lowest |
| 4.00 | Charges for assembling the Spool pieces, multiple port outlet bodies and transition pipes 4 Nos. each after assembling the coal pipe inspection with center feed pipe structures. | 4 | Nos | 68,000 ₹80,240 | 54,200 ₹63,956 Lowest |
| 5.00 | Charges for fixing of orifice 1 No. after dismantling the victaulic coupling. | 12 | Nos | 8,400 ₹9,912 | 3,720 ₹4,389.6 Lowest |
| 6.00 | Charges for fixing of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc., | 12 | Nos | 55,200 ₹65,136 | 31,200 ₹36,816 Lowest |
| 7.00 | Charges for fixing of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc. | 12 | Journals | 81,600 ₹96,288 | 50,640 ₹59,755.2 Lowest |
| 8.00 | Charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back. | 4 | Seg | 24,000 ₹28,320 | 15,680 ₹18,502.4 Lowest |
| 9.00 | Charges for assembling of lube oil cooler, from lube oil system,cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples. | 4 | Mills | 34,000 ₹40,120 | 21,200 ₹25,016 Lowest |
| 10.00 | Charges for providing wedges between lower skirt and Mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. Lowering the thrust bearings and reassembling of all the above parts . | 4 | Nos | 74,000 ₹87,320 | 54,480 ₹64,286.4 Lowest |
Tender Value
Refer Docs
EMD Value
₹17,600
Closing Date
4 Aug 2026, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation circle MPM I Unit I Erection of four sets of various critical spares such as Worm gear with shaft assembly, Journal assembly with liner, Main vertical shaft, Bowl modified, Bowl hub etc. 26 items set suitable for XRP 763 Bowl Mills in
2026_EB_687316_1
CE/SE/O/TTPS/Spec.No.82/26-27
Open Tender
Miscellaneous Works
Item Rate
80 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹17,600
Yes
25 Aug 2026
21 Jul 2026
5 Aug 2026
21 Jul 2026
4 Aug 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Toping of Mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. After inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (Department vehicle will be provided for drawl of oil at free of cost). | 4 | Nos | - | - |
| 2 | Charges for assembling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc. | 4 | Nos | - | - |
| 3 | Charges for assembling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc., | 4 | Nos | - | - |
| 4 | Charges for assembling the Spool pieces, multiple port outlet bodies and transition pipes 4 Nos. each after assembling the coal pipe inspection with center feed pipe structures. | 4 | Nos | - | - |
| 5 | Charges for fixing of orifice 1 No. after dismantling the victaulic coupling. | 12 | Nos | - | - |
| 6 | Charges for fixing of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc., | 12 | Nos | - | - |
| 7 | Charges for fixing of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc. | 12 | Journals | - | - |
| 8 | Charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back. | 4 | Seg | - | - |
| 9 | Charges for assembling of lube oil cooler, from lube oil system,cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples. | 4 | Mills | - | - |
| 10 | Charges for providing wedges between lower skirt and Mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. Lowering the thrust bearings and reassembling of all the above parts . | 4 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_826141.xls
BOQ • 0.37 MB
duetochangedate.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].