| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-AOC 17 1 SANKAR COLONY PALAYAMKOTTAI TIRUNELVELI | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | ₹27.5 L | L1 | Accepted-AOC AOC |
| Sl No | Description | Qty | Unit | MARSHAL VIGNESH & CO L1 |
|---|---|---|---|---|
| 1.00 | Dismantling existing C.C. Pavement including all labour charges and machineries including all cost and conveyance etc., complete as per standard specifications | 188 | Cum | 486 ₹91,368 |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 308 | Cum | 107 ₹32,956 |
| 3.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 308 | Cum | 2,277 ₹7.0 L |
| 4.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 2,050 | Sqm | 83 ₹1.7 L |
| 5.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications. | 2,050 | Sqm | 18 ₹36,900 |
| 6.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of al lmaterials to CMP site ,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uni form thickness of 50mm with paver to the specifi degrades and cross sections and compacted by Vibratory /Pneumatic Rollert othere quired density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory/ Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 103 | Cum | 10,288 ₹10.6 L |
| 7.00 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 Bitumen and 5.03kg of plastic waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate of required temperature and mixing the min required temperature incentral hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/ 9m paverfinisher, Vibratory/ Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 62 | Cum | 10,650 ₹6.6 L |
Tender Value
₹32.9 L
EMD Value
₹32,850
Closing Date
9 Sept 2025, 3:00 pmClosed
COMMISSIONER TIRUNELVELI
S.N.HIGH ROAD MAIN OFFICE TIRUNELVELI CORPORATION
Conversion of Cement Concrete road to BT Surface at Pooli Puthu Street in ward No. 47
2025_MAWS_598596_1
25/2025-26/2
Open Tender
Civil Works
90 days
S.N.HIGH ROAD MAIN OFFICE TIRUNELVELI CORPORATION
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹32,850
S.N.HIGH ROAD MAIN OFFICE TIRUNELVELI CORPORATION
9 Apr 2026
29 Aug 2025
9 Sept 2025
29 Aug 2025
9 Sept 2025
29 Aug 2025
2 Sept 2025
stage.html
html • 0.04 MB
technical_715495.pdf
techsummary_715495.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
2biddocument.pdf
Tender Documents • 0.71 MB
BOQ_715495.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid