Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.9 L+₹2,125.50 (1.11%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.9 L+₹3,997.50 (2.09%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.0 L+₹4,095 (2.15%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
EMD Value
₹3,900
Closing Date
10 Aug 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
FINDC2627101983-(CULVERT NEAR THE HOUSE OF MOHD.YOUSUF RESHI LEADING TOWARDS THE LAND OF SIRAJ UD DIN BABA AT PINGLENA TENGPONA ROAD PINGLENA BLOCK KAKAPORA)
2026_RDPR_317758_57
e- NIT No. 66/2026-27 Dated 24-07-2026
Open Tender
Civil Works
Percentage
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹3,900
11 Aug 2026
25 Jul 2026
11 Aug 2026
25 Jul 2026
10 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/work in excavation in foundation trenches or drains not exceeding 1.5m in width as well as 10sqm. in plan incl. disposal of excavated soil by Mechanical Means. | 13.25 | cum | 256.85 | ₹3,403.26 |
| 2 | Providing and laying of stone soling incl carriage 10km by MT complete job | 3.31 | cum | 1,136 | ₹3,760.16 |
| 3 | P/Laying of cement concrete M10 mix with graded stone agg. 20mm N.S in foundation and plinth complete. | 8.84 | cum | 5,733 | ₹50,679.72 |
| 4 | P/Laying of RCC in M20 mix with graded stone agg. 20mm N.S excluding cost of steel reinforcement & formwork but curing complete. | 5.89 | cum | 9,395 | ₹55,336.55 |
| 5 | Reinforcement for R.C.C work including straiightining ,cutting, bending, placing in position and binding all complete. | 471.25 | kgs | 109 | ₹51,366.25 |
| 6 | Centering and shuttering incl propping ,struting ,stripping & removal of formwork complete job | 51.12 | sqm | 286.35 | ₹14,638.21 |
| 7 | Carriage of sand bajri lead 15km by MT | 20.03 | cum | 269 | ₹5,388.07 |
| 8 | Backfilling behind abutment wing walls etc ,inc cost and carriage all complete job | 7.36 | cum | 1,136 | ₹8,360.96 |
| 9 | Add cost of sign board,photograps,, & other unforeseen items | 1 | LS | 2,067 | ₹2,067 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1043003.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .