Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | -35.05% | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹6.6 LAdmitted-Finance | -25.77% | ₹6.6 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-PWF&R Rule No. 334 Contractor not Eligible To Apply |
Tender Value
₹8.9 L
EMD Value
₹17,870
Closing Date
20 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
Executive Engineer Rehabilitation Division Isarda Project Tonk
Development of katcha drainage work for Banetha to Dam site road Road of Isarda project , Village- Banetha, Tehsil -Uniyara , Dist -Tonk
2026_WRDAS_573623_1
ENIT 01Year2026-2027
Open Tender
Civil Works
Percentage
60 days
banetha tonk
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
AS PER NIT
₹17,870
Yes
22 Jul 2026
8 Jul 2026
21 Jul 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 1,350 | Sqm | 1.45 | ₹1,957.5 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil | 7,253.6 | Cum | 76 | ₹5,51,273.6 |
| 3 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect Soft / Disintegrated rock | 1,224 | Cum | 134 | ₹1,64,016 |
| 4 | Providing, laying and fixing in position RCC spun or hume pipe with collar (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. NP-2 (900 mm) | 50 | RM | 3,525 | ₹1,76,250 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_1020403.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].