| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.9 LAccepted-Finance | ₹10.9 L | 1 | Accepted-Finance L1 |
| 2 | 2₹11.9 LAccepted-Finance | ₹11.9 L | 2 | Accepted-Finance L2 |
| 3 | 3₹13.9 LAccepted-Finance | ₹13.9 L | 3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | A.K.ENTERPRISE L3 | T L AIR ENGINEERING CO. L1 | SB ASSOCIATE L2 |
|---|---|---|---|---|---|---|
| 1.00REINSULATION OF SR-01 PIPELINE DISCHARGE PIPELINE IN IPPL, TERMINAL | ||||||
| 1.01 | Replacement of insulation with new PUF, Yellow FRP and its solution and new aluminum sheet fixing of 12 inch SR-01 Pump discharge pipeline including Valves, NRV’s, Flanges etc (Pipeline inside liquid Temperature (-)45°C) as per existing thickness and specification. The job involves removal of existing damage PUF at all height, pasting of new PUFF, PUFF material, glass cloth fixing & shalicoat as well as fixing of new aluminum sheet (22 guage) for necessary as required for the job shall be supplied is under contractor scope.
The PUFF material shall be under contractor scope. The job includes supply of all materials, puff, aluminum sheet, glass cloth fixing and shalicoat, consumable, scaffolding, skilled and Unskilled workers required for job. | 110 | RM | 7,850 ₹8.6 L | 7,100 ₹7.8 L | 6,990 ₹7.7 L |
| 1.02 | Replacement of insulation with new PUF, Yellow FRP and its solution and new aluminum sheet fixing of 10 inch SR-01 Pump discharge pipeline including Valves, NRV’s Flanges etc (Pipeline inside liquid Temperature (-)45°C) as per existing thickness and specification. The job involves removal of existing damage PUF at all height, pasting of new PUFF, PUFF material, glass cloth fixing & shalicoat as well as fixing of new aluminum sheet (22 guage) for necessary as required for the job shall be supplied is under contractor scope.
The PUFF material shall be under contractor scope. The job includes supply of all materials, puff, aluminum sheet, glass cloth fixing and shalicoat, consumable, scaffolding, skilled and Unskilled workers required for job. | 15 | RM | 8,650 ₹1.3 L | 6,000 ₹90,000 | 6,369 ₹95,535 |
| 1.03 | Replacement of clamp support with hard puff of 250 m3/kg. 12 inch Clamp to be made with hot dip galvanize with 100-micron dft.
Hard Puff width: 450 mm | 2 | NOS | 19,500 ₹39,000 | 6,200 ₹12,400 | 18,600 ₹37,200 |
| 1.04 | Replacement of clamp support with hard puff of 250 m3/kg. 12 inch Clamp to be made with hot dip galvanize with 100-micron dft.
Hard Puff width: 150 mm. | 8 | NOS | 13,800 ₹1.1 L | 5,500 ₹44,000 | 13,650 ₹1.1 L |
| 1.05 | GST @ 18% | 1 | NOS | 2,45,772 ₹2.5 L | 1,66,932 ₹1.7 L | 1,81,950.3 ₹1.8 L |
Tender Value
Refer Docs
EMD Value
₹12,646
Closing Date
2 Apr 2026, 10:00 amClosed
GOPAL PAUL
Gopal Paul
Reinsulation of SR01 pump discharge pipeline
2026_IPPL_272602_1
IPPLHM/SR-01/2026-27/LT-01
Limited
Pipes and Pipe related activities
90 days
HALDIA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,646
Yes
6 Apr 2026
23 Mar 2026
3 Apr 2026
23 Mar 2026
2 Apr 2026
28 Mar 2026
24 Mar 2026 - 25 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1REINSULATION OF SR-01 PIPELINE DISCHARGE PIPELINE IN IPPL, TERMINAL | ||||||
| 1.01 | Replacement of insulation with new PUF, Yellow FRP and its solution and new aluminum sheet fixing of 12 inch SR-01 Pump discharge pipeline including Valves, NRV’s, Flanges etc (Pipeline inside liquid Temperature (-)45°C) as per existing thickness and specification. The job involves removal of existing damage PUF at all height, pasting of new PUFF, PUFF material, glass cloth fixing & shalicoat as well as fixing of new aluminum sheet (22 guage) for necessary as required for the job shall be supplied is under contractor scope.
The PUFF material shall be under contractor scope. The job includes supply of all materials, puff, aluminum sheet, glass cloth fixing and shalicoat, consumable, scaffolding, skilled and Unskilled workers required for job. | 110 | RM | - | - | - |
| 1.02 | Replacement of insulation with new PUF, Yellow FRP and its solution and new aluminum sheet fixing of 10 inch SR-01 Pump discharge pipeline including Valves, NRV’s Flanges etc (Pipeline inside liquid Temperature (-)45°C) as per existing thickness and specification. The job involves removal of existing damage PUF at all height, pasting of new PUFF, PUFF material, glass cloth fixing & shalicoat as well as fixing of new aluminum sheet (22 guage) for necessary as required for the job shall be supplied is under contractor scope.
The PUFF material shall be under contractor scope. The job includes supply of all materials, puff, aluminum sheet, glass cloth fixing and shalicoat, consumable, scaffolding, skilled and Unskilled workers required for job. | 15 | RM | - | - | - |
| 1.03 | Replacement of clamp support with hard puff of 250 m3/kg. 12 inch Clamp to be made with hot dip galvanize with 100-micron dft.
Hard Puff width: 450 mm | 2 | NOS | - | - | - |
| 1.04 | Replacement of clamp support with hard puff of 250 m3/kg. 12 inch Clamp to be made with hot dip galvanize with 100-micron dft.
Hard Puff width: 150 mm. | 8 | NOS | - | - | - |
| 1.05 | GST @ 18% | - | NOS | - | - | itemH2Code4 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
TenderInsulation.pdf
Tender Documents • 0.48 MB
BOQ_318120.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid