Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹77.3 LAccepted-AOC HOUSE NO 8 VILLAGE ALAWALPUR BAWAL REWARI VILLAGE ALAWALPUR BAWAL REWARI 123501 | BAWAL | REWARI | HARYANA | 123501 | L-1 | Accepted-AOC accepted | |
| 2 | L-2₹1.1 Cr+₹22.5 L (25.7%)Rejected-AOC | L-2 | Rejected-AOC rejected |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
19 Dec 2019, 2:00 pmClosed
Ravinder Kumar, Executive Engineer
EXECUTIVE ENGINEER, PUBLIC HEALTH ENGINEERING DIVISION, BAWAL
Providing Canal Based water supply scheme for Garhi, Bolni, Bagthala Kheri Motla group of villages construction of water works at village Kheri Motla Distt. Rewari (Under Sansad Adrash Gram Yojna).
2019_HRY_110424_1
PHED/BAWAL/ 17895-958
Open Limited
Civil Works - Others
Works
180 days
kheri motla
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
EXECUTIVE ENGINEER PHED
₹70,000
Yes
29 Jun 2020
28 Nov 2019
19 Dec 2019
28 Nov 2019
19 Dec 2019
28 Nov 2019
Amount
Designing , Testing , Commissioning of automated PLC controlled SCADA based water purification plant of 1.00 MLD capacity at Water Works Kheri Motla comprising of DI pipe from raw water main/pump to inlet box of WTP , CWT to clear water suction well . Construction of Inlet Box , inlet channel, Office , Laboratory , Alum dozing, Flash mixing , Clariflocculator, filter box including material , over head Reservoir for back wash including pump sets , All other civil structures which are required in WTP , electric control panels, waste water tank including pump sets , internal DI piping system of WTP along with specials Sluice , Valves , Non Returning Valves Air Valves , Sluice Gate Valves , manhole covers , air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement with automation complete in all respects as per NIT (Sluice valve of make IVC/ VAG )Operation & maintenance during Defect liability period of 12 months after trial run period of 3 months and for 4 years thereafter and all other works contingent thereto
Operation and maintenance of water works. Operation and maintenance of WTP structures, pumping machinery as illustrtaed in the scope of work During defect liability period of 12 months after 3 months trial run period and for 4 years thereafter. Operation only during defect liability period after 3 months trial run period.
Operation and maintenance during 2nd year
Operation and maintenance during 3rd year
Operation and maintenance during 4th year
Operation and maintenance during 5th year
Devinder Kumar Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .