Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹16.4 L+₹47,989.17 (3.01%)Rejected-Finance | L2 | Rejected-Finance Tender Opened you r L2 Refund |
| Sl No | Description | Qty | Unit | RAJASEKAR R L2 | T S SEKAR L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with
an initial lead of 10m and lift of 2m in the following
classification of soils as directed by Deparment
officers. Hard stiff clay, block cotton, hard red earth
shales, murram, ordinary gravel, stoney eart First depth of 2m | 57.24 | M3 | 263.77 ₹15,099.51 Lowest | 263.77 ₹15,099.51 Lowest |
| 2.00 | 2 nd Depth | 11.45 | M3 | 408.16 ₹4,673.02 Lowest | 408.16 ₹4,673.02 Lowest |
| 3.00 | Sand filling for foundation with clear river sand
including cost of sand watering, ramming and
consolidation etc complete as directed by
Department officers. | 4.29 | M3 | 2,059.83 ₹8,842.85 Lowest | 2,059.83 ₹8,842.85 Lowest |
| 4.00 | Cement concrete 1:4:8 (one cement four sand and
eight aggregates) using 40mm HBGS for levelling
course for foundation including the cost of mixing
concrete, ramming, curing etc., complete as directed
by Department officers. | 4.29 | M3 | 5,895.37 ₹25,308.82 Lowest | 5,895.37 ₹25,308.82 Lowest |
| 5.00 | RCC in M30 GRADE using graded aggregtes of HBGs
excluding cost of reinforcement, centering, shuttering
strutting, but including cost of mixing concrete,
placing, vibrating with mechanical vibrator, finishing,
curing etc., complete as directed by Department
For footing below G.L. ( 1,50 to 4,50 below GL ) | 13.52 | M3 | 9,067.02 ₹1,22,586.11 Lowest | 9,067.02 ₹1,22,586.11 Lowest |
| 6.00 | For Column and Brace upto G.L ( 0 to1,50 below GL ) | 1.49 | M3 | 8,974.15 ₹13,344.56 Lowest | 8,974.15 ₹13,344.56 Lowest |
| 7.00 | For column and brace I 0 to 4.5m from GL | 1.99 | M2 | 9,948.44 ₹19,807.34 Lowest | 9,948.44 ₹19,807.34 Lowest |
| 8.00 | For column and brace I 0 to 4.5m from GL | 2.46 | M2 | 9,254.3 ₹22,765.58 Lowest | 9,254.3 ₹22,765.58 Lowest |
| 9.00 | For column and brace II 4.5m to 7.32m from GL | 1.99 | M2 | 254 ₹505.71 Lowest | - |
| 10.00 | For column and brace II 4.5m to 7.32m from GL | 2.46 | M2 | 9,254.4 ₹22,765.82 Lowest | 9,254.4 ₹22,765.82 Lowest |
Tender Value
₹19 L
EMD Value
₹19,000
Closing Date
29 Aug 2025, 5:00 pmClosed
BDO BP Cuddalore
Block Development office Cuddalore
Construction of 30000 ltr Capacity Over Water Tank 12m Hight at Arulmigu Azhagar Vaigaiyara Thirukoil Thennam pakkam Panchayat in Cuddalore Block
2025_RDTN_597136_1
A3/1830/2025-MPLADS II
Open Tender
Civil Works - Water Works
Item Rate
30 days
Block Development office Cuddalore
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹19,000
13 Nov 2025
25 Aug 2025
29 Aug 2025
25 Aug 2025
29 Aug 2025
25 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .